1 – Exemptions / special considerations | ||
| a) | Places of worship |
| b) | Temporary buildings with a planned time of use , 2 years (but not portable/ modular buildings with a planned service life exceeding this) |
| c) | Workshops with low energy demand |
| d) | Stand alone buildings < 50m² |
| e) | In addition to these exemptions, flexibility/ exemption from these requirements can be made in respect of Listed Buildings, buildings in Conservation Areas and buildings with architectural/ historic merit. Building Control will discuss with Conservation team. |
2 – Energy Performance Certificate | ||
| a) | Required if building will contain a greater or fewer number of parts for separate use. |
3 – Extensions | ||
If >100m² and 25% of the existing building, treat as a new building and use L2A (Consequential improvements may still apply though). | ||
Smaller extensions – 3 ways of proving compliance; | ||
| a) | Meet min. fabric standards and limit windows etc. |
| b) | Area weighted u-value calculation |
| c) | CO² calculation |
4 – Change of use / change of energy status | ||
| a) | Controlled services / fittings to meet new standards. |
| b) | Ensure area of windows not excessive. |
| c) | All new elements to meet new standards. |
| d) | Replace windows/ doors if >3.3 |
| e) | Upgrade retained / renovated thermal elements as necessary. |
Alternatively, carry out a CO2 emissions calculation to prove compliance. |
5 – Controlled fittings | ||
| a) | Windows – meet new standards (1.8), draught proof and provide insulated cavity closers. |
| b) | If new window opening provided, ensure total does not exceed permitted area or other measures to be adopted. |
6 – Controlled Building Services (e.g. Heating/ hot water systems, Lighting) | ||
| a) | If extended or provided – follow guidance. |
| b) | Replacing – ensure no less efficient than before. |
| c) | Energy meters required |
| d) | Commissioning certificates required for heating and hot water systems before completion certificate can be issued. |
7 – Continuity of insulation and air-tightness | ||
| a) | Must be ensured – adopt accredited construction details |
8 – Renovated or retained thermal elements | ||
| a) | Details provided of when elements must be improved when being renovated (50% of element, 25% of total building) or retained. |
| b) | Practical examples provided in Appendix A |
9 – Consequential improvements | ||
Applies to existing buildings .1000m² where the work consists of; | ||
| a) | an extension |
| b) | initial provision of a fixed building service, or |
| c) | an increase in the installed capacity of any fixed building service. |
If this applies; Extensions – adopt measures to at least 10% of the value of the works. Other – improve building fabric (not limited by cost nor counting towards 10%) and then carry out additional improvements to the value of at least 10%. |
10 – User operating information | ||
| a) | Operating and maintenance instructions to be given to user – Building Log Book |