This report provides the Select Committee
with an update on issues that have recently been addressed by the Bereavement
Services Task Group. The Task Group
last reported to the Select Committee on 19 July 2004.
ACTION
REQUIRED BY THE SELECT COMMITTEE
1. To review the work of the Bereavement Services Task Group
2. To make a recommendation to the new Council
on the merit of retaining a Bereavement Services Task Group to oversee service
delivery and promote service development.
BACKGROUND
The Bereavement Services Task Group has met
twice since it last reported to the Fire and Public Safety Select Committee.
Particular consideration has been
given to:
1. Income
Trends/Budgets
Cremation and Burial figures have
unexpectedly fallen this year and this has an effect on Bereavement Services
income. There has been a reduction in
cremations of 109 for the year 2004-2005 from the previous year. This reduction gives the service a budget
shortfall of £40k. The year 2004-2005
has also seen a reduction in burials of 50 against the 6 year average. This gives a budget shortfall of £34k. Added to this is an increase in gas costs.
The biggest cost to Bereavement
Services is the grounds maintenance contract this on average costs £230,000 per
annum. Task Group members discussed
possible ways to reduce this amount.
It was confirmed after discussions
with the Portfolio Holder that prices for the basic cremation and burial should
rise in 2005/6 by inflation plus 3%.
All other prices relating to burial and cremation have risen by
inflation plus 5%. These increases
should generate an additional £30k per annum.
The grounds maintenance contract
was scrutinised and it was recommended that:-
Mowing regimes should be reduced.
Conservation areas will be changed
to rough cut areas.
This would have the effect of
saving Bereavement Services about £10k per annum.
The introduction of new memorial
schemes are being introduced again this will generate additional income.
2. Crematory
and Temperature Control
Regulations do not give a
specified maximum indoor workplace temperature. The temperature can however reach in excess of 100 degrees F in
the crematory in the summer months.
Employers are required to make working conditions as comfortable as is
reasonably practical. With this in mind there have been discussions between
Bereavement Services and Property Services on the issue of temperature
control. The Select Committee was made
aware of these discussions last July.
It was suggested that the
crematory would benefit from the installation of air conditioning.
Surveys concluded that the
electricity supply into the crematorium was insufficient for the equipment
needed. It was agreed to install another transformer. This was completed in January 2005; a cable running to the crematorium
building from the transformer will be renewed in April 2005. Air conditioning units can then be fitted
after this work is completed. The work
is being funded in part by Property Services, and in part through capital
allocation to Bereavement Services.
3. East
Cowes Cemetery Extension
Members have been made aware of
the need to extend East Cowes Cemetery and the Executive agreed in principle
for cemetery extension in January 2003.
Property Services subsequently
arranged for a bore hole to be drilled at the request of the EA to ascertain
whether the allocated land was suitable to be used as burial ground. The Task Group has been kept informed of
progress.
After results from the single bore
hole were evaluated the Environment Agency requested additional works. These additional bore holes will be
monitored for twelve months. Property
Services have undertaken to manage this process and will submit a planning
application in the event that the Environment Agency’s concerns are
addressed. In the meantime burials
continue at East Cowes in the last available plots.
4. Capital
Spends Priorities
Bereavement Services was allocated
£50k over each of the last 2 years and has provisionally been allocated £50k
per annum over the next 2 years for Health and Safety and other priority works.
Memorial Safety = High Priority
Tree Safety =
High Priority
Pathways and perimeter walls and
fences = High Priority
The Task Group has helped to
identify priorities.
Improvement works carried out
recently include:
Crematorium
Station Lane has been re-laid
The car park has been relined and
3 disabled parking bays have been put into place
The floral tribute area has been
block paved
Pathways have been repaired
A disabled toilet has been
installed
There have been new ramps put into
place to conform with the DDA
A new electricity transformer has
been installed
Electronic Book of Remembrance has
been purchased (to be self financing)
Cemeteries
Pathways and roads have been
repaired and pot holes have been filled
Chapels at Ventnor, Binstead and
Carisbrooke (Mountjoy) have been redecorated and can now be used by the public
for services
Tree safety work is being carried
out in cemeteries
The wall at St. Marys Church has
been repaired and made safe
Dog wardens are carrying out spot
checks in the cemeteries
Second hand pews have been
purchased for Binstead Chapel
5. Other
issues the Task Group has considered
Home Office consultation Burial
Law and Policy in the 21st Century
Mercury emissions and proposals
for new legislation
Dog fouling in cemeteries and
crematorium
Plot conversion (kerb set removal)
Carisbrooke church wall (St
Mary’s)
Electronic book of remembrance
Heritage Lottery Fund bid in
respect of Ryde Cemetery
Vandalism
6. Outstanding
Work
Members of the Task Group have
noted that there are issues outstanding.
These include:
Completion of works currently
planned
Northwood Chapel subsidence
Cremator Replacement
RELEVANT PLANS, POLICIES, STRATEGIES
AND PERFORMANCE INDICATORS
Consumer Protection Service Plan
Bereavement Service Best Value
Review [pilot]
CONSULTATION PROCESS
The Task Group has sought advice
and guidance from Property Services, Financial Services and officers
responsible for managing the dog warden contract. Local members have been
consulted.
FINANCIAL, LEGAL,
CRIME AND DISORDER IMPLICATIONS
The Task Group has expressed
concern over the condition of many Bereavement Services assets. Condition surveys on the assets catalogue
problems that still need to be addressed.
A capital allocation for Bereavement Services has been allocated
predominantly for Health and safety issues (£50k each year) over the next 2
years. It is evident however that more
significant sums are required.
Many Select Committee Members are
aware of vandalism in cemeteries. A
culture of deteriorating condition appears to foster disrespect and further
vandalism. It is therefore important to
maintain the condition of all Council cemeteries.
BACKGROUND PAPERS USED IN THE
PREPARATION OF THIS REPORT
Notes from Task Group Meetings on
12 October, 9 February 2005
Report to Executive 29 January
2003
Report to Fire and Public Safety
19 July 2004
Malcolm Houghton Bereavement
Services Manager, 882288
email [email protected]
COUNCILLOR
DAVID KNOWLES
Portfolio Holder for Fire, Emergency Planning and Consumer Protection