Service Plan 2004/05

 

Directorate: Corporate Services

 

Service Area: Finance & Business Services

 

Produced by: Paul Wilkinson

 

Phone Number: 3650

 

Location: County Hall

 

Date completed: 29 August 2003

 

 

Services covered: Accountancy, Audit, Customer Accounts, Insurance, Payment Services, Pensions Administration, Procurement, Revenues and Benefits

 

Contents: Service Plan Summary, Structure and Budget, Previous Year’s Improvement Plan, Key Objectives, Key Performance Measures, Consultation, Resource Bids

 

 

1.Service Plan Summary-2004/05

 
For information

 

The Council’s Corporate objectives

 

1.                  Improving health, housing and the quality of life for all

2.                  Encouraging job creation and economic prosperity

3.                  Raising education standards and promoting lifelong learning

4.                  Creating safe and crime-free communities

5.                  Improving public transport and the highways infrastructure

6.                  Protecting the Island’s physical environment

 

In addition these are specific commitments from the Annual Action Statement

 

7.                  Strong, political and managerial leadership

8.                  Strategically driven excellence in Service delivery

9.                  Improving a community focus

10.             Organisational improvement and staff development

 

Statutory service commitments

 

11.             Section 151 and other finance legislation

12.             Benefits standards

 

The numbers indicating the Council’s corporate and key objectives and commitments are used throughout this Service Plan for reference purposes.

Text Box: Linked to Corporate Objectives:

Support services linked indirectly to all objectives, with direct links to 7, 8 and 10 in particular.

Front line services and Housing Benefits in particular contribute to 1. 
 
Also directly supports several CPA action items 





1.Raising education standards and promoting lifelong learning
                                                2. Creating safe & crime-free
                                                communities
       

Directorate & Service       :

 

Corporate Services – Finance & Business Services                         

                                                                                                       

Service Description:

 

Accounting, budgeting, monitoring, financial advice, treasury management

Internal audit of all activities

Customer accounts

Housing benefit assessment and payment

Insurance and risk management

Payroll and payments to creditors

Pensions administration

Procurement

Tax and business rate collection

 

 

 

Linked to statutory objectives:

Section 151, LG Act 1972, Accounts & Audit Regulations, benefits and taxation law etc.

 
 

 

 

 

 

 


Critical Success Factors (from section 4c)

 

 

 

Factor

Measured By

Reported as

Prioritisation of resources

Budget process

D A Management Letter

Decision making

User feedback

D A Management Letter

Internal audit CPA score

D A assessment

D A Management Letter

Risk management

External assessment

D A Management Letter

Procurement practice

External assessment

D A Management Letter

Benefits performance

Performance indicators

QPMA

Business continuity

Comprehensive plan

Operational Risk Group

Benefit take-up

Performance measures

Select committee

E - agenda

Performance measures

GAGs reviews

 

Key Achievements from 2003/04:

(from section 3)

·        Prioritisation exercise underway and incorporated in service planning

·        Risk management incorporated in service planning – service risk registers

·        Procurement capacity improved, and strategy being implemented

·        IIP accreditiation obtained

·        Successful case for more Revenue Support Grant

·        Audit capacity improved

·        Risk based methodology for Audit introduced

·        Debt recovery rates improved

·        Payroll and pensions intranet site launched

·        Further implementation of electronic data transfer to Inland Revenue

·        Additional benefits service at remote locations

·        Top quartile performance for tax collection

Key Objectives and Improvements for 2004/05:

(from section 4a and b)

·        Improved budget process

·        Better trained and informed financial managers

·        Internal audit effectiveness

·        Risk management development

·        Procurement strategy delivery

·        Benefits standards and performance

·        Business Continuity

·        Benefit take up

·        E-Government

·        Productivity & capacity

 

Longer term objectives:

·                    Sustainable asset management

·                    Pooled budgeting with partners

·                    Long term investment planning

·                    Business process re-engineering

·                    Joint service provision

 

 

 
 

 

 

 

 

 

 


 


Checklist

 

Issue

Please complete all rows Y/N-if N please give explanation

Service Plan agreed with Portfolio Holder

Meeting arranged

Links to corporate and key objectives and priorities

Y

Progressing e-government

Y

Issues from Staff Survey

Y

Key Partner input to Service Plan

Y

 

 

Issue

Please complete all rows Y/N-if N please give explanation

Equalities

Y

Section 17 - Crime & Disorder Act

Y

Risk Management

Y

Procurement

Y

GAGS

Y

Social Inclusion

Y

Environment and Sustainability

Y

Health and Safety

Y

Communication issues arising from your objectives/targets

Y

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

2. Structure and Budget 2004-05

 

 

Team

 

Workforce (FTE)

Staff Costs (£)

Other costs (£)

Accountancy

17.8

580

33

Audit

8.9

264

103

Customer Accounts

7

130

22

Insurance

4.5

125

102

Payment Services

19.3

471

84

Pensions Administration

4.8

120

23

Procurement

5.1

85

16

Revenues & Benefits

73.5

1,650

384

 

 

 

Key Partners:

 

Primary Care Trust (pooled commissioning budget for nursing care)

Rent Officer Service

District Valuer and Valuation Officer

Registered Social Landlords

Welfare Organisations

Head of Housing

 

Accommodation:

 

1st & 2nd Floor, County Hall

Civic Centre, Sandown

Also seconded accountancy staff within client departments and one-stop benefit service at various locations around the Island

 

 

 

 

 

 

 

 


 

3. Previous Year’s Improvement Plan-2003/04   (to section 1 – summary)

 

Task

Target Date

Outcome

Achieved & Comments

Corporate Objective

Prudential Code on Capital Finance

 

Sep 03

Project plan complete & approved

Slight delay due to lack of Government guidance

7,11

Mar 04

Successful implementation

On target, subject to legislation

7,11

New Treasury Strategy

Feb 03

Approval by Executive

Complete

7,11

Improved VAT service

Sep 03

Better trained staff & reduced risk from VAT inspection

In place

11

e-Government

Sep 03

Project plan for financial systems

Subsumed into e-Government project

8

Ongoing development of medium term budget planning linked with corporate planning process

Mar 03 to Feb 04

3 year rolling budget, driven by service plans

 

Underway – requires considerable input from members and directors to succeed fully

7,8,11

Cost centre management training

Oct 02 and  ongoing

Training for cost centre managers

Underway

11

Social Services – Evaluate feasibility of Joint Commissioning and Pooled budgets

October’03

Enhanced service provision through shared funding arrangements

Joint commissioning in place. Government guidance required for further progress

9

Social Services – Consolidate Supporting People Initiatives

September’03

Seamless transition from current benefit regime to that under the Supporting People framework

In place

12

Improved delivery of Audit Plan

Mar 04

Improved productivity, effectiveness and resources. Risk based audit plan

On target

11

Provide work experience posts where possible

Apr 03

Improved performance + local skills enhanced

Service policy in place

2

Risk Management

Stage 2

Sep 03

Produce and review Risk Register, Arrange training in RM, support Corporate wide embedding of RM principles

On target

11

Use internet to promote communication links to external stakeholders

Sep 03

Communication conduit for claimants and interested parties

Partially complete

8

Provision of annual pension benefit statements

Mar 04

Information for customers, less demand for estimates

On target

8

Stimulate an increase in the awareness and adoption of good procurement practice throughout the Authority.

December 2004

Substantial progress towards implementation of Procurement Strategy

In progress

8

Develop the various policies, guidance material, training and other initiatives identified in the Procurement Strategy Action Plan.

December 2003

Well-presented, relevant and informative material developed and targeted effectively.

In progress

8

Greater use and improved  revenues service at local offices

July 2003

Improved service to customers, accessibility

In place

1

Closer working with welfare organisations

Sept 2003

Better access to our customer base

In progress

1

Benefit take-up campaign

July 2003

To meet objectives for social inclusion

Complete

1

Full self-assessment against DWP/BFI benefit standards

Sep 03

To achieve expected service improvements

Complete

1

Partnership working with RSL’s and Welfare Groups

Dec 03

To meet customer needs and to improve liaison

On target

1

Improved revenues visit process

July 03

Increased efficiency

Complete

1

Maximise income from Fraud investigation

July 03

To meet DWP targets and reduce levels of benefit fraud

Complete

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

4. Key Performance Measures

 

4a Objectives of Service 2004/5, 2005/6, 2006/7   (to section 1 – summary)

 

 

 

Objective

Action

Outcome

Target/ Date

Key Officer/ Partners

Link to Corporate Objective

Bid

Ascertain with greater certainty partnership roles and financial contributions

Social Services – Evaluate feasibility of Joint Commissioning and Pooled budgets

Enhanced service provision through shared funding arrangements

Ongoing

K Hubbleday

9

 

Excellence in service delivery

Social Services – Enhance the monitoring arrangements for Specific Grants

Clearer information on expenditure relating to specific grants to assist claims and audit requirements

Apr 04

K Hubbleday

11

 

Excellence in service delivery

Financial Information system – make the system more user friendly to encourage use by cost centre managers

Access to be encouraged by providing windows based front end or direct access via internet

Apr 04

S Fraser/E Sharkey

8,11

 

Excellence in service delivery

Financial information system – new server to improve accessibility and facilitate systems improvements

New server to improve access to the system and ensure maintenance capability is improved to reduce potential downtime

Apr 04

P Wilkinson

8,11

 

Staff development

PC  updates – regular replacement to ensure staff are kept up to date with available technology

Ability to maximise use of resources through availability of modern technology

Replace every 3 / 4 years

S Fraser/E Sharkey

8

 

Staff development

Network printers – servicing and renewal – ensure staff are kept up to date with available technology

Ability to maximise use of resources through availability of modern technology

Replace every 5 years

S Fraser/E Sharkey

8

 

Staff development

ICT training – ongoing training to enable optimum use of systems

Ability to maximise use of resources

Ongoing

All

8

 

Excellence in service delivery

Report Writer Package – ability to write tailor made reports for service users

Improved reports to response to service managers’ requirements

Apr 04

E Sharkey/R Strong/I Bruce

8

 

Staff development

Professional training – CIPFA/CIMA

Succession training to provide ability to sustain business

Ongoing

A Carpenter/A Taylor/A Gregory

8

 

Excellence in service delivery, effective leadership

Ongoing development of medium term budget planning linked with corporate planning process

3 year rolling budget, driven by service plans

Mar 03 and ongoing

P Wilkinson

8

 

Excellence in service delivery

Performance management

Framework in place across Unit and regular quarterly reports to Service head

Ongoing

P Wilkinson/Mgt Team

8

 

Being transparent, open and accountable

Website development

On-line financial information with links to documents as appropriate

Ongoing

S Fraser/R Strong/I Bruce

8

 

Commitment to strong political and managerial leadership

Document Image Processing

Improved access to source finance documents

?

A Carpenter

8

 

Developing staff skills and abilities

Ongoing staff development initiatives

Training & development plan

Ongoing

P Wilkinson/Mgt Team

8

 

Commitment to strong political and managerial leadership

Accounting procedures updated to advance closure of accounts deadlines

Compliance with statutory deadlines

Ongoing

All

11

 

Excellence in service delivery, improved financial management

Cost centre management training

Training for cost centre managers/financial administrators

Sep 03 and  ongoing

S Fraser/H Gaches/T Ringer

8,11

 

Excellence in service delivery, improved financial management, staff development, succession planning

Budget management and financial systems manuals/procedure notes/document processes

Systems user manual in place plus documentation of processes and procedure notes

Apr 04

S Fraser/E Sharkey/R Strong/I Bruce

8

 

Staff development

Office environment

Improvements to office environment including air conditioning, heating, health and safety issues

Ongoing

All/A Morris

8

 

Staff development

Absence management

Framework in place across Unit

Ongoing

F&BS Mgt Team

8

 

Staff development

Stress audits

Completed for all staff

Ongoing

F&BS Mgt Team

8

 

Continuous organisational improvement

Paperless systems including facility for e-payments etc

Automatic data transfer, on-line remote access

Ongoing

All/E Sharkey

8

 

Certification to BS EN ISO 9001:2000

Improved quality assurance

Consistent, high quality product

1/4/05

G. Richardson

11

 

Risk management embedded in the organisation.

Improved risk management

All managers own and use risk registers to manage their operations

1/4/06

G. Richardson

11

 

Maintaining an adequate and effective service despite loss of experienced staff.

Improved succession planning

Recruitment of trainee auditors

31/03/04

G. Richardson

11

 

Maximise effectiveness through synergised activity.

Maintain liaison/relationships with Audit Commission, and improve same with BV Team, Accountancy, HB Fraud Team and Risk and Insurance.

Coordination of related activities

31/03/04

G. Richardson

11

 

Meet targets from CPA and DA Management Letter.

 

Demonstrate review of Risk Register.

Risk Management Risk Register

Live current Risk Register  compiled via Service Planning Risk Registers and emerging risks.

Start date Nov 03

CS

11

 

Providing high quality Council services

Return all misdirected calls  to Switchboard

Less waste of staff time and education to switchboard staff who may be unaware of the errors they make

Ongoing

ALL

8

 

Providing high quality Council services

Improve collection rate of Overpayments of Housing Benefit

Collection of income due to the Council in a timely manner

April 2004

DJW

8,12

 

Providing high quality Council services

Improve collection rate of Interest Free Loan and Bed & Breakfast arrears

Collection of income due to the Council in a timely manner

April 2004

DJW

8

 

Providing high quality Council services

Direct Debit notification letters to print same telephone number on letter as is held on Section details

Clients making contact with the member of staff who deals with the particular type of income – improving service to client

June 2005

LHB

8

 

Providing high quality Council services

Scrap phone free days and staff to work with their ‘telephone buddy’ and use of voicemail to enable them to complete tasks quickly and more efficiently – less mistakes

To minimise errors and aid concentration when working on specific tasks

Ongoing

ALL

8

 

Providing high quality Council services

Automated Pre-summons letter

Improved automated practices

June 2004

LHB

8

 

Providing high quality Council services

AVT Unit having direct input to debtors system of an improved download facility

Improved automated practices

June 2004

LHB

8

 

Providing high quality Council services

Amend invoices to include staff name and e-mail address

Improved customer focus and increased communication methods

June 2004

LHB

8

 

Maximise the use of e commerce to achieve e government targets

Document Image Processing – storage & management

Achieving e government targets and improving working practices

Mar 05

LHB

8

 

Providing high quality Council services

Direct debit date – extra date provided

Improving flexibility of payment methods offered to debtors

May 04

DJW

8

 

Encouraging job creation and economic prosperity

Offer regular 3 month work experience placements

Giving valuable work experience to those who require this – improved performance, due to an extra ‘pair of hands’

Ongoing

LHB

2

 

All Managers trained via training modules at Learning Centre as part of key competencies or via R M workshops.

Risk Management Training

All HOS and key senior officers trained – Sep 03

Start next tier training from Dec 03 – all Managers trained – rolling programme to be ongoing

 

Sep 03 and from December 03

CS/DK

11

 

Hold expanding data on R M to demonstrate compliance with CIPFA /SOLACE guidelines, CPA ,and DA requirements.

Risk 2003 phase 1

All data held on Strategic Risk Profile, RTAP and key milestones onto database.

Start date Nov 03

DK

11

 

Hold expanding data on R M to demonstrate compliance with CIPFA /SOLACE guidelines, CPA ,and DA requirements.

Risk 2003 Phase 2

HOS have access to Service risks on Risk 2003 and view all of Risk Register.

Risk Link Officer appointed for each service.

Licences available.  Training in Risk 2003.

From Apr 04

CS/DK

11

 

Embedding Risk Management. Cross Council Forum.

Effective Risk Treatment Action Plan.

Reviewed Risk Register

Reporting to Executive.

Managing SRG and ORG

SRG, to ensure Strategic approach to RM. ORG, provide a forum for members from all services of the Council for exchange of information, debate, external input and monitoring of RTAP.

Ongoing quarterly

CS

11

 

Embedding RM

Consider methods of engaging and embedding RM ie Newsletter, mailshots, distribution of Broker, Insurers periodicals. workshops

Greater breadth of knowledge and updates of emerging risks, current claims and legal issues affecting cost to authority.

Start date Jan 03

DK

11

 

Easily accessible information on insurance and risk issues

Use Intranet to inform stakeholders and claimants – phase 1

Information on the Intranet for internal stakeholders

March 04

RW/DK

11

 

Accessible information

Use internet to promote communication links to external stakeholders

Communication conduit for claimants and interested parties. E Government.

Sep 04

RW/DK

11

 

Protection of the Council’s assets by internal/external provider.

Review of current policies.  Renewal of externally placed insurances.

Insurance renewed with best quality, cost effective insurer to fit changing needs of the Council.

April 04

CS/RW

11

 

E Government.

Accurate reporting for  Managers and HOS.

Electronic Data Interchange with ZM

Accurate and timely information leading to accurate reporting and reserving.

Sep 04

RW

11

 

Service efficiencies

Upgrade CASE travel & subsistence package

Web enablement, remote input

Mar 04

MC

8

 

Service efficiencies

Upgrade PIPs

Web enablement, self-service

Mar 07

MC

8

 

Service efficiencies

Increase number of supplies paid by BACS

Fewer cheque payments

On going

MC

8

 

Service efficiencies

Replace existing Creditor Payments & Purchasing Commitments system

New system in place, to conform with E-Government,

before Wealden system removed.    

Mar 05

MC

8

 

Service efficiencies

Upgrade to BACSTEL-IP

Replacement of current BACS release which is being phased out.

Mar 05

MC

8

 

Better service, potential efficiencies

Provision of annual benefit statements

(all contractual employees only)

Information for customers, less demand for estimates

Mar 05

GF/AB

8

 

Access to services

Leaflet updates

As required by statute

On-going

GF

8

 

Error reduction, efficiencies

Word integration

Document automation from benefit calculations

On-going

PW/GF

8

 

Efficiency, risk management

Multi-function staff

Better skills cover, succession planning

   Mar 05

GF/PW/AB

8

 

Access to services

Launch of intranet site

Information for customers

May 04

AB

8

 

Reduced error, efficiency

Automatic interfaces

E-government agenda & eliminate double data capture

   Mar 05

GF

8

 

Increase the awareness and adoption of good procurement practice throughout the Authority

Review realistic timescales for implementation of Procurement Strategy action plan in light of the earlier slippage, the BVR outcome and the emergence of the national strategy, etc.

 

Procurement Strategy largely implemented and principles embedded in everyday working practices

Individual tasks in accordance with Procurement Strategy action plan (revised) timescales

J Spencer/

R Streets/ Executive and Director level “champions”

11

-

Improve the effectiveness of the contracts database

Take responsibility for maintaining the existing record summary. Develop it as a more effective and pro-active control tool for effective procurement.

More accurate information helping to ensure better forward planning for tendering programme and greater transparency of procurement requirements.

Updated database completed by April 2004.

 

A comprehensive Purchaser Profile (“Selling to the Isle of Wight Council” guide), including the forward plan for future contract renewal dates, published on website by May 2004.

 

All required OJEU notices published in accordance with legal requirements.

J Spencer/ V Squibb

11

-

Further develop professionalism and capacity of Procurement Section

Continue with existing training and development initiatives for staff within section.

 

 

Section becomes widely recognised as a creditable corporate resource, possessing the necessary focus and expertise to help deliver genuine improvements in the Council’s procurement performance.

Ongoing.

 

Aim for up to 50% of procurement section staff to be CIPS qualified by December 2005

J Spencer

11

-

Communications

“Library” of procurement good practice guidance and information established and maintained.

 

 

 

 

 

 

 

“Purchasing News” to be revamped to cover wider procurement issues. To be published every quarter.

Procurement intranet pages developed as a source of highly useful information regularly accessed by staff in all Council departments.

 

 

To be developed progressively.

Usefulness of established content to be identified by questionnaire to users in November 2004.

 

 

Annual readership survey confirms at least 70% of recipients consider it worthwhile in terms of content being relevant, useful and interesting

J Spencer/ V Squibb/ A Johnson

11

-

Contract management

 

 

 

 

 

The section’s designated portfolio of corporate contracts continues to be managed effectively and

re-tendered in a timely manner

Contracts providing high standards of user satisfaction and good overall value for money

New office cleaning contract awarded by October 2004.

 

New food supplies contract to be awarded by June 2004.

J Spencer/

L Hebditch

 

 

A Johnson/ L Hebditch/ Consortium for Purchasing & Distribution

 

11

-

Measure the Council’s spend in the local economy

Calculate the % of the Council’s total procurement expenditure that is currently spent with local suppliers and contractors.

Establish baseline position (ref. Procurement Strategy)

Analyse data from Creditors system to provide baseline figure by June 2004

J Spencer/ A Johnson

11

 

Wider availability of procurement training

 

Suitable procurement training courses/ initiatives available to relevant staff across the authority

Well-targeted “free to users” procurement training made available

At least three pilot procurement courses for Council staff run by July 2004.

J Spencer

11

 

Contribute to e-procurement project

Actively participate as member of project team

Development of more efficient procurement processes.

Appropriate solution(s) identified and implementation progressing incrementally.

E Brown/

J Spencer/

Project Board

11

-

To develop quality benefits services for our customers

Carry out survey

Service improvements to meet expressed needs

Year on year basis

Principal Revenues officer/All staff

1,8

 

To meet the Benefit Performance standards in all areas

Draw up an action plan

Improved claim processing times

2004/5 year

Managers/staff

1,8

Yes

To maintain high levels of tax collection

 

Collection levels in the upper quartile

All years

Principal Revenues Officer

1,8

 

To develop partnerships to increase benefit take-up

Agree a strategy

Full anti poverty strategy

Increased number of claims by

Oct 2004

RSL’s and welfare groups

1,8

 

To utilise modern technology to improve communication and access to services

Review current needs and analyse options

Meeting targets for electronic service delivery

Paperless direct debit April 2004,

e-billing by 2005

Principal System Officer/Billing staff

1,8

Yes

Improve benefit processing times

Review procedures taking into account BFI report

Introduce revised procedures

DWP Standards

Principal Revenue Officer and Principal Benefit Officer

1,8

 

Re   Reduced waiting times for customers

Survey to establish needs via best value review

Quality service that meets claimants expectations

To provide resources on the basis of need

Principal Revenue Office/

Customer staff

1,8

 

Better performance monitoring

Extend to all areas

Improved management information

BFI action plan

Revs and Benefits Manager

1,8

 

I      To improve the administration of benefit overpayments

Increase resources and investigate new methods of recovery

Improved recovery rate

Better BVPI

Principal Revenue Officer

1,8

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

4b Service Improvement Plan 2004/5, 2005/6, 2006/7 (to section1 –summary)

 

 

Objective

Action

Outcome

Target

Key Officer/Partner

Linked to Corporate Objective

Bid

Enhancing the Organisation’s capacity to prioritise resources

· Completion of prioritisation process

· Budget links to best value, risk management, procurement

· Prudential code implement-ation

Medium term budget driven by service planning process

Improved link between objectives and resource allocation by March 2004

CFO

8,11

 

Better informed decision making

· Training

· Improved access to information

Improved financial management skills across the organisation

All budget managers and members offered training and consulted on reporting needs by March 2005

SRF

8,11

 

Improved CPA rating for Internal Audit Function

· Improve capacity to deliver plan

· Productivity raised to peer group average

· Risk based audit approach

Audit element of ‘Use of Resources’ scored as ‘good’

Compliance with CPA ‘3’ by  December 2003

GR

8,11

 

Improving risk management capacity and techniques

· Management of strategic risk register

· Links to service plans

· Service risk registers

Risk management techniques embedded within the organisation and scored as ‘good’ under CPA ‘Use of Resources’

Compliance with CPA ‘3’ by March 2004

CS

8,11

 

Development of good procurement practice throughout the Organisation

· Policy for high risk/strategic procurements

· Roll out of procurement strategy

Compliance with National Procurement Strategy

March 2005

JS

8,11

 

Improving the benefits service

· Close performance management

· Restructuring

· New hardware

· Staff training and development

Compliance with DWP performance standards

Compliance by March 2005

MT

8,12

 

Business continuity

· Risk management

· Staff capacity

· Performance planning

· ICT replacement

Securing continuation of existing service delivery

Full action plan by September 2004

SRF

8,11

 

Improved benefit take up

· Closer working with welfare groups

· Full anti-poverty strategy

· Links with Housing and other partners

Claims from those currently entitled but not claiming

Strategy and partnerships in place by September 2004

MT

8,12

 

Support for e-agenda

· Positive contribution to corporate agenda

· Effective exploitation of ICT

Service improvements from GAGS, e-Government and process re-engineering

Browser enabled systems, electronic transfer, on-line input, DIP, back office split

SMT

8

 

Productivity & capacity

· Absence management

· Stress audit

· Training & development review

· Systems documentation

· Succession planning

· Modern apprenticeships

· Business planning

· Exploitation of ICT

· H & S training

Enhanced ability to cope with sickness, staff changes and retireements  or other potential disruptions to service delivery

All processes in place or complete by March 2005

SMT

8

 

To increase our services available electronically by ….% by (date)

 

 

100% Compliance by December 2005

 

 

8

 

 


4c Critical Success Factor Table (to section 1- summary )

 

Critical Success Factor

Outcome

Key Actions

Key Dates

Enhancing the Organisation’s capacity to prioritise resources

Medium term budget driven by service planning process

· Completion of prioritisation process

· Budget links to best value, risk management, procurement

· Prudential code implementation

Full implementation by March 2004

Better informed decision making

Improved financial management skills across the organisation

· Training

· Improved access to information

Rolled out between July 2003 and March 2005

Improved CPA rating for Internal Audit Function

Audit element of ‘Use of Resources’ scored as ‘good’

· Improve capacity to deliver plan

· Risk based audit approach

Full implementation by December 2003

Improving risk management capacity and techniques

Risk management techniques embedded within the organisation and scored as ‘good’ under CPA ‘Use of Resources’

· Management of strategic risk register

· Links to service plans

· Service risk registers

Framework fully developed by March 2004

Development of good procurement practice throughout the Organisation

Compliance with National Procurement Strategy

· Policy for high risk/strategic procurements

· Roll out of procurement strategy

Rolled out by March 2005

Improving the benefits service

Compliance with DWP performance standards

· Close performance management

· Restructuring

· New hardware

· Staff training and development

Full compliance by March 2005

Business continuity

Securing continuation of existing service delivery

· Risk management

· Staff capacity

· Performance planning

· ICT replacement

Full action plan by September 2004

Improved benefit take up

Claims from those currently entitled but not claiming

· Closer working with welfare groups

· Full anti-poverty strategy

· Links with Housing and other partners

Strategy and partnerships in place by September 2004

Support for e-agenda

Service improvements from GAGS, e-Government and process re-engineering

· Positive contribution to corporate agenda

· Effective exploitation of ICT

e-Government target date is 2005

 


 

5. Key Performance Measures and Targets 2004/05

 

5a Targets for the Annual Action Statement 2004/05

 

Target Description

Target 2003/04

If app.

Target 2004/05

Benchmark figure and year if app.

Source

Days to process new benefit claims

36

30

36

Government target

Housing benefit claims paid within 14 days

65

90

87

Upper quartile

Process a benefits change of circumstances

9

7

9

Government target

 

 

5b Mandatory targets 2004/05

 

Performance Indicator and source

Target

2002/3

Actual

2002/3

Target

2003/4

Target 2004/5

Bench-mark Figure

Source

Invoices paid in 30 days (%)

 

93

94

95

91

86

91

SCUBG

Unitaries

NUB (UQ)

Council Tax collected (%)

97.7

98.86

97.8

98

 

 

Non-domestic rates collected

98.2

98.2

98.3

98.4

 

 

Days to process new benefit claims

45

64.9

36

30

36

Government target

Days to process changes of circumstance

35

11.96

9

7

9

Government target

Percentage of benefit overpayments recovered

55

55.75

58

60

 

 

Accuracy of benefit processing

 

98.2

98.5

98.8

 

 

% of services transactions received, processed electronically

Subject

To ICT

resource

+ GAGS

progress

 

 

 

 

 

 

 

 

 

5c Other key targets 2004/05

 

 

Performance Indicator and source

Target

2002/3

Actual

2002/3

Target

2003/4

Target 2004/5

Benchmark Figure

Source

Sundry debtor recovery rate (%)

97.14

97

98

98.14

 

 

Home help debtor recovery rate (%)

94.14

95

95.14

96

 

 

Cost per customer invoice (£)

 

7.36

7.75

7.95

8.89

CIPFA Unitaries

Insurance claims processed with 16 days (%)

80

76

85

85

 

 

Payroll cost per employment (£)

38.04

31.95

39.37

40.55

48.52

52.80

SCUBG

Unitaries

Cost per supplier invoice (£)

1.15

1.04

1.19

1.23

1.26

1.55

SCUBG

Unitaries

Payment of retirement benefits in 5 days (%)

95

97

97.5

98

95.4

LGPC

Weekly incorrect benefit

116,106

118,602

106,424

 

106,424

DWP target

 


6a Consultation 2003/04

 

Subject for Consultation

Dates and Contact

Consultation with whom

Key Results of Consultation

Actions taken/

cross ref to Key Objectives/

Improvement Plan

Various management and staffing issues

May 2003

All staff

Problem areas identified within individual sections

Each topic will be dealt with by Service Management Team on a monthly cycle

Supplier challenge days

June 2003

Suppliers & contractors

Views on Council/supplier interface

Still being analysed

Procurement skills

June 2003

Staff involved in procurement

Gap analysis of procurement skills

Reflected in procurement training bid

 

6b Future consultation 2004/05, 2005/06, 2006/7

 

Subject for consultation

Dates and contact

Consultation with whom

Service standards

All services by March 2004

Benefits - June 04

Key service users (questionnaires, user groups or one-to-one as appropriate)

Insurance & risk management gap analysis

Sep 03

Identify current position and target gap with training/information

Service perceptions

August 03 & Jan 04

Benefit claimants

Benefits service (for best value review)

Oct/Nov 03

Service users

Benefit service telephone response times

Sept 04

Service users

Benefits service quality

July 04

Registered Social Landlords

Usefulness of procurement intranet site

Nov 04

All council departments

User friendliness of tender invitation documentation

March 05

Recent bidding contractors

Payroll focus group and PIPS user group

Regular meetings

Users

Payroll and creditor services

April 04

Schools

Debtors user group

Sep/Oct 2003

Users

Audit plan

Nov 03 – Jan 04

Managers, members and District Audit

Audit service user forum

Oct 03

Users

Funding issues

Regular meetings

Schools

Accountancy focus group

2003

Users

 


 

7. Resource Bids Summary

 

Reference Number

Description

Financial Implications

 

 

2004/5 £000

2005/6 £000

2006/7 £000

FB1

Benefit overpayments

21.5

20.5

21.0

FB2

E-billing

TBA

TBA

TBA

FB3

Wider provision of procurement training

8

6

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

Resource Bid

 

Reference number: FB1           (Benefit overpayments)

 

Service Area:  Revenues and Benefits

 

1. Nature of service

The calculation and payment of Housing Benefit

 

2. Key objectives delivered

The provision of support to meet rental payments for clients with limited financial means thus allowing them access to housing accommodation. Objectives met are:

·        Social Inclusion

·        Improving health and quality of life

·        Growing and sustaining the economy

·        Improving access to services

 

3. Current resource use

 

Gross

£000

Income

£000

Net

£000

Benefits

1,165,990

897,689

268,301

 

4. Service volumes and outputs

Benefit Claims processed per annum

 

 

9200

Benefit Reviews processed per annum

 

 

16000

Benefit paid per annum

 

 

£36m

 

5. Key performance indicators

 

IWC

Current

IWC target

Bench-mark

Comments

Overpayments recovered

55.75%

58%

65.26%

NUB Group 2002/3

 

6. Benchmarking data

 

 

 

 

 

 

7. Service development proposal

To increase the resources available to recover benefit overpayments by recruiting an additional member of staff. The will enable us to meet the benefit performance standard for this area and to respond to the concerns raised in the inspection by the Benefit Fraud Inspectorate

 

 

8. Additional resources required (if any)

 

2004-5

£000

2005-06

£000

2006-07

£000

One full time member of staff

 

           17

 

          18

 

            18.5

Office equipment

          

             2

         

            1

 

              1

Total

           19

          19

            19.5

 

9. Training and Development requirements (if any)

 

2004-05

£000

2005-06

£000

2006-07

£000

Benefits Legislation

 

              2

 

1

 

1

Debt Recovery

 

              .5

 

.5

 

.5

Total

             2.5

1.5

1.5

 

10. Linkages to partners, other services, corporate values

Links to the anti-poverty strategy and the recovery of council tax, also to the Department of Works and Pensions (Benefit Performance Standards) and landlords

 

11. Impact on key performance indicators – measure of success

The proposal will improve the collection levels reported in BVPI’s and will help to raise awareness of the requirements on both claimants and landlords to ensure changes of circumstance are reported promptly.

 

 

12. Key corporate objectives delivered by the bid

An increase in the amount of overpayments recovered thus improving the Council’s financial management

 

 

 

 


Resource Bid

 

Reference number: FB2                    (Electronic Billing)

 

Service Area:  Revenues and Benefits

 

1. Nature of service

The collection of Council Tax and Business rates

 

2. Key objectives delivered

The provision of support to meet rental payments for clients with limited financial means thus allowing them access to housing accommodation. Objectives met are:

·        Social Inclusion

·        Improving health and quality of life

·        Growing and sustaining the economy

·        Improving access to services

 

3. Current resource use

 

Gross

£000

Income

£000

Net

£000

Council Tax

588,173

135,960

452,213

Business rates

144,688

255,621

110,933cr

 

4. Service volumes and outputs

Number of council taxpayers

63,039

 

 

Amount Collected

        £55m

 

 

Number of  ratepayers

5797

 

 

Amount Collected

        £22m

 

 

 

5. Key performance indicators

 

IWC

Current

IWC target

Bench-mark

Comments

Council Tax collected

97.7%

98.86%

96.95

Nub Group

Non domestic rates collected

98.2%

98.2%

98.3%

Nub Group

 

 

 

 

 

 

6. Benchmarking data

 

 

 

 

 

 

7. Service development proposal

To implement the e-billing legislation for both council tax and business rates in 2004/5 which will require additional software

 

-

8. Additional resources required (if any)

 

2004-5

£000

2005-06

£000

2006-07

£000

Salary costs for set up work

 

     8.5

 

 

Software purchase

 

 TBA

 

  

 

Annual support and maintenance

 

 TBA

 

        TBA

 

            TBA

Total

 

 

 

 

9. Training and Development requirements (if any)

 

2004-05

£000

2005-06

£000

2006-07

£000

System Training

 

           2

 

 

 

10. Linkages to partners, other services, corporate values

Legislative requirement and the ability to meet e-government target as well as offering   improved access to services.

 

11. Impact on key performance indicators – measure of success

Enable us to maintain cost effective and efficient collection systems which are reflected in the Performance Indicators for collection of local taxes

 

 

 

12. Key corporate objectives delivered by the bid

This meets all of the objectives through the improved access to services.


Resource Bid

 

Reference number: FB3                    (Wider provision of procurement training)

 

Service Area: Prucurement

 

1. Nature of service

Co-ordinating and helping to facilitate improvements in procurement activity across the Council. 

 

2. Key objectives delivered

Strategically driven excellence in service delivery.

Organisational improvement and staff development.

 

 

 

3. Current resource use

 

Gross

£000

Income

£000

Net

£000

Controllable expenditure 2003-4

87

9

78

Recharges

2

1

1

Total

89

10

79

 

 

 

 

Manpower (full time equivalent)

5.1

 

 

 

 

Accommodation

Room 320 County Hall -  30 sq. metres

 

4. Service volumes and outputs

Managing a number of corporate framework contracts including:-

Mobile phones £100k pa (700+ users)

Office stationery £160k pa (230 customer delivery codes)

Photocopiers £214k pa (200 copiers)

Food supplies £140k pa

Fire extinguisher servicing £23k pa (280 sites)

Office cleaning £160k pa (49 sites)

 

 

 

 

 

 

 

 

5. Key performance indicators

 

IWC

Current

IWC target

Bench-mark

Comments

 

 

 

 

 

 

 

6. Benchmarking data

N/A

 

 

 

 

7. Service development proposal

Procurement is a highly devolved activity within the Council, with many staff in all Directorates being involved to various degrees and with differing levels of expertise. There is increasing recognition, both by Government and local authorities in general, that more needs to be done to increase procurement skills capacity and thus help drive improvements in procurement performance. The Council’s own Procurement Strategy recognises this need, although it is not necessarily the highest priority on individual service units’ plans. Accordingly this proposal is for a provisional sum to “pump prime” improvements in procurement know how across the Council through the provision of some suitably targeted short courses run by an appropriate external training provider on a pilot basis. This would effectively make such training “free at the point of delivery” to a wider group of staff and will add further momentum to the Council’s drive to secure further procurement improvements. The specific course content has yet to be determined, although the recent procurement skills self-assessment exercise will help inform the process.

 

 

 

 

8. Additional resources required (if any)

 

2004-5

£000

2005-06

£000

2006-07

£000

Training

8

6

5

 

 

 

 

Total

8

6

5

 

9. Training and Development requirements (if any)

 

2004-05

£000

2005-06

£000

2006-07

£000

 

 

 

 

Total

 

 

 

 

10. Linkages to partners, other services, corporate values

Procurement is identified as an important corporate governance issue and one that features in the CPA improvement plan.

 

11. Impact on key performance indicators – measure of success

It is difficult to measure the impact of this proposal in finite terms; however it would clearly help stimulate an increased awareness and understanding of important procurement issues within the Council and thus contribute to raising standards generally. Tentatively this initiative could cover approximately 100 staff.   

 

12. Key corporate objectives delivered by the bid

8 (Strategically driven excellence in Service delivery)

10 (Organisational improvement and staff development)