PAPER B2
ISLE OF WIGHT COUNCIL DEVELOPMENT CONTROL COMMITTEE –
TUESDAY 27 AUGUST 2002
REPORT OF THE STRATEGIC DIRECTOR OF CORPORATE AND ENVIRONMENT SERVICES
|
TCP/03886/P P/01782/01 Demolition of garage workshops & stores; erection of 9 houses in 2 terraces with parking & access off Binstead Hill (revised siting) (readvertised application) land adjacent, forming part of Binstead Auto Centre, Binstead Road, Ryde, PO33 |
This application was initially considered by the Development Control Committee at the meeting held on 16 July 2002 when it was decided to visit the site before making a decision.
The site visit took place on 26 July 2002 when Members decided to defer consideration in order to enable negotiations to take place about the proposed development, about a number of issues including the possible future use of neighbouring land and the overall access to the site which is shared by a neighbouring motor repair facility (Binstead Auto Centre).
As a result of this decision the Development Control Manager sent a detailed letter (Appendix A) to the applicant's agent outlining comprehensively the concerns expressed by this Committee and asking him and his client to consider possible amendments to the overall scheme. The response (Appendix B) has come from the applicant, as opposed to his agent, setting out his position and views on the matter and requesting that the application should be determined in its presently submitted form.
The following report is identical to the report submitted to the Development Control Committee (Site Visits) on 26 July 2002 with appropriate amendments detailing the outcome of the unsuccessful attempt to initiate negotiations on this application.
Representations
With regard to originally submitted scheme six letters have been received from local residents objecting to proposal on following grounds:
Loss of trees.
Potential problems relating to drainage of site.
Potential land stability problems adjoining stream and excessive water flow.
Overdevelopment of site.
Inaccuracy in respect of boundary identification.
Proximity of new development to existing residential property to north west.
Inappropriate increase in traffic movement onto and from busy road.
Discrepancy in respect of parking allocation.
Following readvertisement two further letters were received again repeating original objections with one writer requesting that site be visited by Members prior to making decision.
Southern Water advise that the point and details of proposed connection to public sewer will require their formal approval. There are no public surface water sewers in the vicinity of site. No surface water should be discharged into public foul sewer as this could cause flooding to downstream properties. Their records show a number of sewerage incidents in the area but they were all blockages mainly on private drainage. This would not indicate a lack of capacity in the area.
Contaminated Land Officer advises that it will be satisfactory to undertake investigations regarding contamination after issue of planning consent. He therefore recommends appropriate conditions should be attached to any consent requiring site investigation report and remediation where necessary prior to development commencing on site.
Environment Agency raises no objection in principle to proposal but recommends condition requiring appropriate investigation to assess degree of contamination of site and determine water pollution potential. They recommend further condition that foul drainage from development shall connect to mains foul sewer.
Council's Tree and Landscape Officer has inspected site and advises that there is one tree worth retaining in south western corner of site.
Following substantial consultation with Highway Engineer further detail recently submitted with application has enabled Highway Engineer to support application subject to imposition of standard conditions.
Evaluation
Application relates to part of former garage workshop associated with Binstead Garage which itself is situated on northern side of Binstead Hill approximately midway between junctions with Pitts Lane and Brookfield Gardens. North western corner of application site is bounded by a stream and access is gained over existing forecourt area which is shared with garage and a residential property rear of garage premises.
Whilst site itself is not allocated for any specific purpose within UDP, site does lie within development envelope for Ryde and there is therefore no objection in principle to residential redevelopment of this brownfield site.
Application seeks consent to demolish part two part single storey workshop premises (now vacant) situated to side (north west) of existing Binstead Garage complex.
Development would comprise nine dwellings in two terraces with each dwelling having main orientation facing north east - south west. Development proposes five, three bedroom units and four, four bedroom units with parking for some nine vehicles indicated alongside entrance to site.
Turning to more detailed aspects of proposal, whilst two end terrace dwellings are located close to western boundary of site where it adjoins the stream orientation of these properties is such as to prevent any direct overlooking, presenting gable ends to existing development in the Old Forge Close. Distances to remaining properties fronting Binstead Hill and rear of garage are considered sufficient to enable proposed development to be built without having undue adverse impact on surrounding residential occupiers.
Given previous industrial use of site comments of both Environment Agency and Council's Contaminated Land Officer are appreciated and imposition of conditions can satisfactorily overcome this particular constraint. Provision of nine off street parking spaces complies with adopted zonal parking policy for this location.
Whilst existing workshop complex is surrounded by trees/shrubs such specimens are not considered worthy of retention apart from one sycamore in south western corner of site.
It is expected that development will connect to foul sewer system whilst in terms of surface water runoff point should be made that previous impervious surface area of development is significantly less than is currently the case in respect of the industrial workshops and hard surfacing areas. Therefore, surface water runoff from the site should be reduced to reflect the reduction in impervious surfaces. This will drain to the existing stream and in view of the reduced flow from the site no objection can be raised on this particular issue.
Members should appreciate that on land to immediate north of application site application seeking outline consent for eleven dwellings on land adjacent "Pintiles" was refused under delegated powers in May of this year (see attached map for site details). This application (TCP/3886N) sought to utilise the same access point as the current application, however, Highway Engineer was unable to support application on grounds of inadequacy of existing access. At time of this application he advised that application for eight dwellings on site was refused by direction of the Highway Authority in 1985. Approval for two units was subsequently given but it is felt that they represented the limits of what should be allowed with access from the main road at this point. Although garage has lost its fuel pumps probably decreasing vehicle movements in and out, traffic flows on A3054 have increased in past 15 years and circumstances have not materially changed in any other respect. In particular, visibility to west is sub-standard across frontage of Bank Cottages. In accordance with his recommendation application was refused under delegated powers on grounds of increased use of existing access adding unduly to hazards of highway users, unsatisfactory access by reason of unacceptable visibility and fact that proposal made no provision for affordable housing.
Clearly, Highway Engineer maintains his objection to any new development served off the existing access and whilst such access is sub-standard in terms of visibility no reasonable objection can be raised on highway grounds to replacement of industrial workshops with residential as it is likely that vehicle movements would be similar or indeed less than most recent previous use which could recommence at any time.
With regards highway matters agent advises that when active workshops were creating approximately 50 vehicle movements a day with staff, deliveries and vehicle testing and it is unlikely that proposed development of nine houses will significantly impact on that previous situation. Following substantial negotiation with Highway Engineers Department revised plans have been submitted which satisfy Highway Engineer. This information covers issues of kerbs, gradient, surface treatments and surface drainage and Highway Engineer recommends appropriate conditions to cover these matters.
Development represents opportunity in seeking to remove non-conforming user which, given usage involved, had potential to impact on surrounding residential occupiers and whilst agent indicates that some five members of staff were previously employed loss of relatively small scale employment user is not considered to be sufficiently significant to raise a policy objection in respect of seeking to retain employment land.
The various points to be debated, covered in detail in the letter from the Development Control Manager, can be summarised in the following terms:
• No objection to loss of buildings previously used for employment purposes in favour of residential redevelopment.
• Overall density and arrangement of proposed units on a limited site area where there are a number of semi-mature trees.
• Delineation of access/parking area from neighbouring use as a motor repair facility.
• Possibility of a more comprehensive development by utilising land presently forming part of the curtilage of Pintiles.
Having read the letter from the Development Control Manager Members will have their own views on the response from the applicant who is clearly indicating that with support from the Highway Engineer and the Planning Officer he is unable to see sufficient justification for further amendments to the submitted scheme and, on that basis, declines the opportunity to negotiate on any of the issues.
Members will have to decide whether the concerns they have raised, if not addressed, should or could amount to sufficient justification for withholding permission. While it is appreciated that the presently submitted scheme may not amount to Members preferred solution for this particular site, there is some difficulty with sustaining a decision to refuse permission when the development is in accordance with the objectives and policies contained in the new PPG3 (Housing) which is consistent with a number of policies contained in the Unitary Development Plan. Consequently, with some reservations, the recommendation to grant conditional approval is maintained.
Reason for Recommendation
Having given due regard and appropriate weight to all the material considerations described in the Evaluation section of this report the redevelopment of this urban brown field site is considered appropriate and consistent with UDP policy concerning housing, access and design policies D1, D2 and TR7.
Recommendation - Approval (Revised Plans)
Conditions/Reasons:
1 |
Time limit - full - A10 |
2 |
Construction of the buildings hereby permitted shall not commence until a schedule of all materials and finishes to be used for the external roofing and walls of the same has been submitted to and approved in writing by the Local Planning Authority. Thereafter only such approved materials and finishes shall be used in carrying out the development. Reason: To safeguard the amenities of the locality and to comply with Policy D1 (Standards of Design) of the IW Unitary Development Plan. |
3 |
Withdrawn PD right for windows/dormers - R03 |
4 |
No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before (before the building(s) is/are occupied). Development shall be carried out thereafter in accordance with the approved plans. Reason: In the interests of maintaining the amenity value of the area to comply with Policy D1 (Standards of Design) of the IW Unitary Development Plan. |
5 |
The existing visibility splays shall be maintained. Reason: In the interests of highway safety. |
6 |
No structure or erection or natural growth, plants, shrubs etc shall be placed or permitted within the area that allows the existing maximum visibility splay. Reason: n the interests of highway safety. |
7 |
Details of roads, etc, design and constr - J01 |
8 |
Before the development hereby permitted is commenced details of the width, alignment, construction, gradient and drainage of all roads shall be submitted to and approved by the Local Planning Authority. Reason: To ensure an adequate standard of highway and access for the proposed dwellings and to comply with Policy TR7 (Highway Considerations) of the IW Unitary Development Plan. |
9 |
Provision (loading, unloading & parking - K01 |
10 |
Turning space - K41 |
11 |
No development shall take place until the developer has carried out adequate investigation to assess the degree of contamination of the site and to determine its water pollution potential. The methods and extent of the investigation shall be agreed with the Planning Authority before any work commences. Details of appropriate measures to prevent pollution of ground water and surface water, including provisions for monitoring, shall then be submitted to and approved in writing by the Planning Authority. Reason: To prevent pollution of the water environment as the site may be contaminated due to the previous use. |
12 |
Foul drainage from the development hereby approved shall be to the mains foul sewer. Reason: To prevent pollution of the water environment. |
13 |
No part of the development hereby permitted shall commence until:
a) a methodology for investigations and assessments has been agreed in writing by the Local Planning Authority prior to site investigations and assessments having been carried out by appropriately qualified personnel. The investigations and assessments shall be in accordance with British Standard 10175:2001 "Investigation of potentially contaminated sites - Code of practice". The laboratories used for analysis of samples shall be registered to the ISO 17025:2000 quality standard. The investigations and assessments shall be in accordance with current Government and Environment Agency guidance and shall identify the types, nature and extent of contamination present, risks to receptors and potential for migration within and beyond the site boundary.
b) a remediation scheme to deal with any contaminants identified has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include an implementation timetable, monitoring proposals and a remediation verification methodology. The verification methodology shall include a sampling and analysis programme to confirm the adequacy of decontamination and an appropriately qualified person shall oversee the implementation of all remediation.
The construction of buildings shall not commence until the investigator has provided a report, which shall include confirmation that all remediation measures have been carried out fully in accordance with the scheme. The report shall also include results of the verification programme of post-remediation sampling and monitoring in order to demonstrate that the required remediation has been fully met. Future monitoring proposals and reporting shall also be detailed in the report.
Reason: To protect the environment and prevent harm to human health by ensuring that where necessary, the land is remediated to an appropriate standard in order to comply with Part IIA of the Environmental Protection Act 1990. |
14 |
Before the development commences a landscaping and tree planting scheme and details of other hard surfacing shall be submitted to, and approved in writing by, the Local Planning Authority. Such scheme shall specify the position, species and size of trees to be planted, the phasing and timing of such planting and shall include provision for its maintenance during the first 5 years from the date of planting. Reason: To ensure that the appearance of the development is satisfactory and to comply with Policy D3 (Landscaping) of the IW Unitary Development Plan. |
M J A FISHER
Strategic Director