SOUTH CENTRAL CONNEXIONS PARTNERSHIP

 

ISLE OF WIGHT CONNEXIONS

LOCAL MANAGEMENT COMMITTEE

 

DRAFT DELIVERY PLAN 2002 - 2003

 

 

For Discussion at Stakeholder Meeting 17 April 2002 and

Ratification by Local Management Committee

 

 

 

 

 


CONTENTS

PAGE                          

3                      Executive Summary

The Vision        

4                      The Principles

5                        Engaging Young People

                        Strategic Objectives

6                                             Structure, Delivery and Management

7                                             Structure Diagram

8                      Delivery

9                      Management

10                      Needs Assessment

12                     Performance Indicators and Targets

13                     Funding and Resources

Human Resource Strategy

14                     Working with Schools and Colleges

                        Working with other Key Partners

15                     Performance Management and Continuous Improvement

                        Information Sharing

                        Equal Opportunities

                        Health and Safety

16                     Communications Marketing and Branding

                        Management Information

17                      Strategic Objectives and the Key Delivery Tasks

                          Introduction

18                     Strategic Objectives

23                      Timescales, Costs and Responsibilities

Planning Objectives and Key Delivery Tasks

32                     Recommended Model for Delivery

33                     The Isle of Wight Connexions Service Model – In Schools and IoW College

35                     The Isle of Wight Connexions Service Model – Not In Education, Employment or Training

36                     Resourcing the Delivery Models

37-38                                Estimated Resources and Potential Costs

 

ANNEXES

 

THE ISLE OF WIGHT CONNEXIONS LMC - DELIVERY PLAN 2002-2003

 

 

EXECUTIVE SUMMARY

 

The Local Management Committee (LMC) of the South Central Connexions Partnership (SCCP) for the Isle of Wight have developed this Delivery Plan to link in with the Business Plan developed by the SCCP for the Partnership Area, which includes Hampshire, Portsmouth, Southampton and the Isle of Wight.

 

The format and headings used are consistent with those in the SCCP Business Plan and a précis of the main plan is included under each of the headings. Additional information, and a copy of the Business Plan are available if required.

 

 

1.THE VISION:

 

1.1 All young people between the ages of 13 years and 19 years (and up to 25 years for those with special needs) will have access to services that ensure they gain the information, advice, guidance and support necessary to reach their potential and make the successful transition into further education, training and/or employment.

 


2.THE VALUES:

 

2.1 The Isle of Wight Connexions Service has been instigated on the following values:

 

 

 

 

 

2.2 The principles underpin a delivery plan that extends opportunities for equal access to all young people through:

 

·         Transparent and inclusive processes involving all partners but actively recognises the role that young people have as active contributors

 

·         The constant pursuit of new developments to reflect agreed vision and values

 

·         An implementation of the Service in a transitional but phased approach that builds on good practice and current research

 

·         The continuing reflection upon the lessons learned from the Isle of Wight Pilot 2001/2002   

 

·         The sharing of critical information with all partners through agreed protocols

 

·         New resources that will only be deployed against specified criteria

 

·         Training, support and quality standards that strive to reflect “best value”

 

·         Continuous mapping and a sharing of management information

 


3.ENGAGING YOUNG PEOPLE:

 

3.1 In continuing to develop the Connexions Service across the partnership we have followed the strategic policy made by the SCCP Board to engage young people in the design and delivery of the Connexions Service.

 

3.2 Support for this policy has resulted in young people being involved on appropriate “interview panels”; the LMC Youth sub-group; in the establishment of the Transforming Youth Work Development Fund position within the Youth Service; and through the development of a Young Peoples Charter that outlines the rights and expectations of the new Connexions Service.

 

3.3 Support for the policy has also resulted in a shared value statement under which the Isle of Wight Connexions Service has endorsed:

 

“Joining together to promote opportunities for achievement & success”.

 

3.4 We will, through consultation with the Youth Forum, continue with these policies to ensure that all young people can contribute to the delivery of the Connexions Services, can highlight their own barriers to learning, and can adequately express and help themselves to raise their aspirations.

 

3.5 A copy of the Young Peoples Charter is attached as an annex to this document for reference.

 

 

4. STRATEGIC OBJECTIVES

 

 

We support the strategic objectives set across the whole SCCP area. These are:

 

4.1   To raise aspirations, participation and challenging goals for the achievement levels of all young people

 

 

4.2   To provide all young people outside of learning with the support they need to fulfil their potential

 

 

4.3   To provide an integrated support service for young people and their carers to assist in engaging effectively with learning and employment

 

 

4.4   To influence and improve learning provision and other services for all young people

 

 

4.5   To To operate all Connexions Services with an equality of opportunity and open access for all by providing a dedicated personal adviser service to all young people

 

 

 

4.6   To develop the capacity of the partnership to deliver the objectives above

 

These Strategic Objectives link to the Key Tasks and Stakeholder Targets and are discussed and detailed in Section 17 onwards

 

 

 

 

5. STRUCTURE DELIVERY AND MANAGEMENT

 

5.1 Structure:

 

5.11 The Local Management Committee with representatives from the contributors and stakeholders involved in the Isle of Wight Connexions Service, was developed at an early stage as a robust structure that can oversee, influence, manage and quality control the local Service and its funding.

 

5.12 Links to the SCCP Board have been maintained, as the Chair of the LMC is an SCCP Board Member. Additionally the Isle of Wight Director for Social Services and Housing also sits as an SCCP Board member. The Chief Executive of the SCCP will also attend Local Management Committee meetings on a regular basis and provide direct line management for the appointed Isle of Wight Connexions Manager.

 

5.13 The LMC have agreed to the formation of a smaller LMC Steering Group as part of the Local Management Committee. This group acts on behalf of the LMC and takes an early response on policy, probity and good practice but at the same time defers to the LMC and is finally guided by that broader membership.

 

5.14 Identified Sub Committees will be created to oversee Contracts Quality and Performance, working to clear terms of reference, as well as steering identified issues for young people.

 

5.15 An all Island wide Stakeholders Group will be regularly consulted at least annually on Connexions Service matters and invited to contribute as and when appropriate.

 

5.16 Young people play a major role in all the above groups but also have their own dedicated Youth Forum that will in future meet under the direction of a member of the LMC and the Transforming Youth Work Development Fund (TYWDF) worker. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STRUCTURE DIAGRAM

 

 

 

 


  >>>>>>>>>>>>>>                                                                                         >>>>

^   <<<<<<<

^   v                                                                                                              

^   v                                                                                                                   

Connexions Manager

 

 

 

Isle of Wight Connexions LMC

 
 


   >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

   <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<

Text Box: S
T
A
K
E
H
O
L
D
E
R
S
 


   <<<<<<                                                                                                      ^

Isle of Wight Connexions Information Officer/Support staff

 
   >>>>>>                                                                                                      ^

 

^   v                                                                    <<<<

^   v

^   v                                                                                              

Isle of Wight Connexions
Young Peoples Forum

 

Isle of Wight Connexions
Personal Advisors

 
                                                                                                                                                                                   

 

 <<<<

 

 

 

Isle of Wight Connexions
Transforming Youth Work Development Fund Worker

 

Commissioned Personal Advisers & additional services

 
 

 


 <<<<

 

 

 

 

 

Text Box: Young People 13-19 Year olds
 

 

 

 


5.2 Delivery:

 

5.21 The implementation of the Isle of Wight Connexions Service will be delivered through the support of Stakeholders, and the direct resource of Connexions Personal Advisers placed within professional teams; and a small team of trained young people known as “Connexors” as a link between service users and service providers.     

 

5.22 The principal contributors are the Island’s Education and Community Development Directorate, the Local Education Authority, Schools, the Youth Justice Service, HealthCare, Social Services and Housing Directorate, the Isle of Wight College and the local Southern Careers Service Company. Significant input and resources in kind will also come from self-funded voluntary agencies including the Youth Trust, the Hampton Trust, the Girls Friendly Society, Platform One and others.

 

5.23 The Annexes include a Tabular format of the linkages within the Connexions Service in relation to Young People, Schools and Colleges and Other Key Partners.  

 

5.24 All of the contributors are critical to the Isle of Wight Connexions Service. In seeking funds from South Central Connexions Partnership they will deliver the Isle of Wight Connexions Services by collaborating under a contracted framework, which includes quality standards and information management.

 

 

 

 

 

 

 

 

 

 

 


5.3 Management:

 

5.31 The Isle of Wight LMC will have a key role in identifying the needs for local provision, identifying gaps and developing local plans. The members will work closely with the SCCP Board in the ongoing development of area plans and how resources might be most effectively deployed. The LMC will also be responsible for identifying local service needs and ensuring that quality is monitored.

 

5.32 The Isle of Wight Connexions Local Management Committee Steering Group will promote and prepare policies, advise on probity and recommend good practice. At the same time this group will be required to defer to the LMC and be guided by that broader membership. The Chair of the LMC is also a member of the SCCP Board. He will be supported by personnel identified by the LMC and with expertise drawn in from stakeholders.

 

5.33 The Isle of Wight Connexions Manager will be employed directly by the Isle of Wight Council. They will be accountable to the Chief Executive of SCCP but will work closely with the Chair and LMC Members to manage the effective local delivery.

 

5.34 To assist the work of the Isle of Wight Connexions Manager, the Service will require Connexions Administration staff and a Connexions Information & Data Controller. The first of these support staff is already in place assisting the current Connexions (IOW) Co-ordination Manager and will continue in this role when the Connexions Manager is appointed.  The remaining posts will be appointed prior to the live date.

 

5.35 The Connexions Personal Advisers (PA’s) will be employed by contract and work within partner organisations and stakeholder teams. The PA’s will assist in the building of a multi-skilled and talented delivery team capable of crossing professional boundaries.

 

5.36 All PA’s working at Level 1 (as described in Section 22 below) will undertake accreditation through the Connexions Diploma. Those working with Levels 2 and 3 will undertake the Understanding Connexions 10-day Course and be encouraged to undertake the Connexions Diploma. The PA’s will be brought together by the Connexions Manager to share good practice and to help in the communications link with the LMC.

 

5.37 In delivering the Connexions Service PA’s may operate from Schools, the Isle of Wight College, One Stop Shops, Youth Offending Teams, Leaving Care Teams as well as Youth Clubs, and local (ward level) Voluntary, Community or Neighbourhood Organisations.

 

5.38 Other staff offering Personal Advice will be considered as PA’s, even where they have yet to take on the ten-day Understanding Connexions training. Where they have been nominated by the Schools, the Isle of Wight College, or from any of the key partners, they will carry the name of Connexions Personal Adviser.

 


 

 

6. NEEDS ASSESSMENT:

 

6.1 Mapping

 

6.12 In June 2001, SCCP commissioned the Youth Affairs Unit De Montfort University to provide consulting support for a mapping exercise. A purpose of the mapping was to gather baseline data for the strategic planning of the Connexions Service on the Isle of Wight.

 

6.13 Research has been undertaken of the views of the young people on the Island through the Education Resource Information Centre (E.R.I.C.). This surveyed 1160 young people from across the island with the survey carried out by their peers. The full report is available by request.

 

6.14 Some of the main issues brought out through E.R.I.C. was the current view of support offered to young people. To the question “Think about the help you have needed over the past year. If you have needed help, advice or support in these areas was there someone to help you?” The main emphasis of the responses received is shown in the following table:

 

 

Education Help & Advice

Health help & advice

Help with relationships

 

Schoolwork

Careers

Jobs

Mental

Alcohol/drugs

Pregnancy

Family

Bullying

Teachers

Yes

67%

43%

28%

14%

16%

12%

22%

19%

12%

No

33%

57%

72%

86%

84%

88%

78%

81%

88%

No of respondents

739

482

316

150

173

130

240

209

138

 

6.15 A separate question asked, “ What difference would having a Connexions person to help you, have on your life?” Young people were asked to rate this on a scale of 1 0 to 10 with 0= none and 10 = a lot. The responses are shown below:

 

 

0

1

2

3

4

5

6

7

8

9

10

Rating

157

55

73

81

77

257

91

91

73

19

74

 

 

6.16 The mapping exercise has shown that the Island has key issues in specific areas:


6.2 The Involvement of Young People

 

6.21 Through E.R.I.C. and such rotes as Focus Groups, extensive consultation has already been undertaken with young people. In addition the LMC Youth sub committee and the SCCP Board have ratified the Youth Charter.

 

6.22 As a result of consultation, an Isle of Wight Youth Forum will be developed by the TYWDF worker in collaboration with Wight 2B Heard. Continuing feedback from the Isle of Wight Youth Forum and the SCCP Young People’s Forum will be essential to monitor the quality and impact of the Service from young people.

      

6.3 Developing The Needs Assessment

 

6.31 We recognise that whilst the information gained from the mapping has highlighted many key areas, more needs to be done in the first year of delivery to establish sound baselines, issue targets for achievement and log appropriate milestones. In this regard, we will ensure that:

 

·         A repeat exercise is undertaken that identifies the needs of young people, and of services and activities available on the Island, the user-friendliness of the Connexions Service (its’ locations, hours and services), and also to confirm the correct contact routes for the many specialist services such as housing and the support for drugs related issues.

 

6.32 The Connexions Service will continue to contribute a youth perspective to the Island’s Community Strategy; have a voice on the Local Learning Partnership; and contribute to the Children and Young People Partnership Board and the Children’s’ Fund

 

6.4 Partners Plans

 

6.41 In its first year, and then annually, the Isle of Wight Connexions Service will improve its needs assessment by collaborating and consulting with key partners over their plans where they involve services to young people.

 

6.42 Some of the plans being shared include Education Development Plans, Children and Young People’s Strategic Plans, Behavioual Support Plans, Children’s Service Plans, Community Safety Partnership Action Plans, Youth Service Plans, Education-Business Link Plans, Local Learning Plans, Single Regeneration Bid Plans, Substance Misuse Plans (Drug Action Teams), Teenage Pregnancy Strategies, Youth Justice Plans, Housing Strategies, Homelessness and Health Plans.

 

6.43 Sub-regional plans such as those held by South East England Development Agency (SEEDA,) Government Office for the South East (GOSE) and The Hampshire and IOW Learning & Skills Council will also be consulted, as will the more local plans held by the Lifelong Learning Partnership.

 


7. PERFORMANCE INDICATORS AND TARGETS

 

7.1 We will take a local lead in setting and contributing to Connexions Service targets but will need to be mindful that any resulting performance indicators and targets have to be agreed by the Board of SCCP with Connexions Service National Unit (CNSU). This agreement will cover:

·         Performance indicators that measure “year on year” progress

·         Cross cutting targets that are owned by individual partners but contributed to by all

·         Partnership targets that relate to specific areas of the Connexions Service

 

7.2 The Isle of Wight Connexions Service considers that it has a contribution to make to the achievement of targets held by the various partners. To facilitate this, regular exchanges will take place between all contributors and stakeholders so that information and techniques can be shared and appropriate support offered.

 

7.3 Performance indicators

 

7.31 Three key performance indicators will be monitored-

·         The year on year progress of the proportion of 16-19 yr olds in employment, education and training.

·         The year on year progress of the proportion of the cohort taking part in personal development,

·         The number of young people receiving support through a Connexions intervention.

                                                                       

7.4 Cross-cutting targets

 

7.41 These targets, owned by individual key agencies, will, through planning processes be linked together to avoid duplication and to provide realistic local Isle of Wight Connexions Service targets. The targets will concentrate upon increasing the achievement levels for 16 yr olds, increasing NVQ achievements for 19 yr olds, increasing school attendance and reducing the under 18 conception rate.

 

7.5 Partnership targets:

 

7.51 Local targets, specific to the Connexions agenda, will include reducing the number of young people leaving education and training to become Not in Education, Employment or Training (NEET), and a number of shared targets with the Health Services, Youth Justices, Drug Action Teams, and those in the Voluntary Sector working to the Connexions agenda.

 


8. FUNDING AND RESOURCES

 

8.1 The Isle of Wight Connexions LMC will have a role in working to join up local services for all young people aged 13-19 as well as delivering (through contracted arrangements) some of the Connexions Service. In 2002-3 the Isle of Wight Connexions Service will receive notional funding of £263,000

 

8.2 The funding is based upon a number of weighting factors, around population size in the target groups, and young people’s needs such as GCSE results; numbers of young people not in education; those unemployed, and those claiming income support. Overall the per capita payment for the Isle of Wight Connexions Service is above the average for SCCP and reflects the specific issues faced on the Island. 

 

8.3 The notional monies awarded to the Isle of Wight Connexions Service do not reflect the substantial commitment of resources by voluntary and publicly funded partners who will continue to provide a significant “in-kind” contribution towards the local delivery of the Service.

 

8.4 The Local Management Committee will approve contracts but will not be contractors nor be the holders of monies, however will work with SCCP to recommend suitable contract holders and then help put financial systems in place with them that enables those appointed contractors to record and advise all transactions between themselves and the South Central Connexions Partnership Board.

 

8.5 Isle of Wight Connexions will submit to SCCP the detailed delivery plan that recommends where local costs for the delivery of the Service should be allocated and which reflects CSNU recommendations that 40% of monies should be spent on work with the 13 -16 yr age group, 35% on work with the 16-19 yr age group and the balance to support the direct employment of Personal Advisers and other delivery staff.

 

 

9. HUMAN RESOURCE STRATEGY

 

9.1 Isle of Wight LMC will submit recommendations to the SCCP Board for the level of Personal Advisers and support staff required to deliver its local service. With support from the key contributors and stakeholders we will prepare a Human Resources planning strategy. This strategy will identify and describe the details of the numbers of staff to be deployed to deliver a total Service reflecting the needs of the Island’s young people.

 

9.2 This strategy will also identify future retention and recruitment needs & training and development needs.

 

 

 

 

 


10. WORKING WITH SCHOOLS & COLLEGES

 

10.1 We clearly recognise that the link to individual school and the Isle of Wight College priorities is vital to meet with student needs. It is essential that school and college management be engaged in planning and delivery and with full representation on the LMC.

 

10.2 In the Schools and the Isle of Wight College, Connexions will provide universal support, advice and guidance to all students and more intensive support to students needing specific help to progress. This is set out in a tabular format in the Annexes.

 

10.3 Every school and the Isle of Wight College will negotiate its own Partnership Agreement that will include Careers advice and guidance and access to additional support. The Agreement will also address issues such as the resources that the Service can offer, give clarification on the roles, responsibilities and the management of the school/College nominated Personal Adviser, advise how students with particular needs will be helped, and clarify how data will be expected to be collected and shared.

 

 

11. WORKING WITH OTHER KEY PARTNERS

 

11.1 The Isle of Wight Connexions Service aims to bring together the services working with young people and to implement a strategy that supports and directs collaborative working. Key partners include the voluntary and community sectors, statutory services, training providers, educational institutions and employers.

 

11.2 There will be an early agreement with all key partners on the principles for joint working so that the Isle of Wight LMC and the Youth Forum are working towards building on, rather than duplicating the work of existing agencies. To be effective the Isle of Wight Service will work with these partners to identify

·         How and where they operate,

·         How to best work together,

·         Where Personal Adviser roles already exist,

·         How to join together all partners to share their work, their vision, planning, training and use of premises.

Through this joint approach the Service will encourage the most appropriate worker to take on the role of the young person’s Personal Adviser and to take a lead case management role in order to broker and co-ordinate support from other agencies.

 

11.3 The Key Partners will provide an open route for local employers and training providers in order to present them with up to-date information, advice and guidance about local labour markets and support for associated learning and employment opportunities.

 

 


12. PERFORMANCE MANAGEMENT AND CONTINUOUS IMPROVEMENT

 

12.1 The CSNU is developing a performance management and contracting framework that will cover both qualitative and quantitative measures in-order to provide an integrated basis for accountability and continuous improvement.

 

12.2 The SCCP Board will be required to undertake an annual self-assessment of their performance, and GOSE, as managers of the Connexions Contract, will hold quarterly reviews with the SCCP Board. The CSNU will be responsible for reporting to Ministers on progress with the delivery of Connexions nationally. OFSTED has the responsibility for inspecting the Connexions Service and every Connexions Partnership is required to carry out a Best Value review.

 

13. INFORMATION SHARING AND SYSTEMS

 

13.1 The CSNU is developing a comprehensive information system database, to monitor the status and needs of all 13-19 year olds and enable young people who move between Connexions Partnership areas to be supported more easily.

 

13.2 The key component to the system will be the feeding of information from Personal Advisers, local agencies and others to the national system via the SCCP system and in doing so, making that information compatible to other collection systems such as those used by the Learning and Skills Council, Schools, Colleges and others.

 

13.3 There will be an early need for local data sharing agreements and suitable training for Connexions staff to help understand and implement them in line with the Data Protection Act 1998. It is the intention that all Isle of Wight Connexions Service partners and key stakeholders support the SCCP Board in their information sharing and systems strategies.

 

 

14. EQUAL OPPORTUNITIES

 

14.1 In delivering any Connexions Service, all key partners and stakeholders will have to demonstrate that their services offer appropriate forms of access and delivery for all, and is able to support the SCCP Board equal opportunities strategy.

 

 

15. HEALTH AND SAFETY

 

15.1 Isle of Wight Connexions Service will inform the SCCP Board how services will be organised to minimise the risk to health and safety to all young people benefiting from its provision.

 

15.2 Isle of Wight Connexions will request all partners and key stakeholders to comply with relevant legislation, ensure that front line delivery staff have been suitably trained and informed of the risks involved and have adequate supervisory arrangements in place particularly where Personal Advisers are working with young people with multiple problems, ensuring support for the SCCP Board health and safety strategies.

 

 

16. COMMUNICATIONS MARKETING AND BRANDING

 

16.1 From the first day of operation, and guided by the SCCP Board, Isle of Wight Connexions Service will contribute to the development and the understanding of how, with its key partners and stakeholders, the process for using the Connexions name, the corporate identity and the branding of the Service will operate locally. This will include the promotion of the Connexions Card and its’ locally negotiated discounts.

 

17. MANAGEMENT INFORMATION

 

17.1 Isle of Wight Connexions Service will collect and report management information as guided by the SCCP Board but it is likely to include information based around narrative reports, planning data, expenditure, and statistics.

 

 

18. NOTES

 

 


19. STRATEGIC OBJECTIVES AND THE KEY DELIVERY TASKS

 

19.1 INTRODUCTION

 

19.2 The Isle of Wight Connexions Delivery Plan sets out milestones for 2002-2003 for the first year of the Service’s activity and mirrors the Business Plan by setting key delivery tasks against the SCCP strategic objectives and then cross referring those tasks to the relevant section of the Isle of Wight Connexions Delivery Plan and key targets for stakeholders

 

19.2 In respect of timeframes, it is, at the time of writing anticipated that South Central Connexions Partnership will “go live” on 1st September 2002. In the plan, the annotation “by 31st August 2002” means therefore that an Implementation Activity Phase will be funded and operated from 1st April 2002 to 31st August 2002. Should a decision be made by CSNU that South Central Connexions Partnership will only “go live” from 1 April 2003, then a new funded arrangement will be identified for Implementation Activity Phase funding between 1st September 2002 – 31st March 2003.

 

 

19.3 Stakeholders will be eligible to tender for contracts for the delivery of the Connexions Agenda.

 

19.4, The Careers Service Contract will be offered direct to Careers Management by SCCP but that does not prevent Isle of Wight’s Southern Careers working in any of the other contracts or bidding for further contract work in their own right.

 

19.5 This rule also applies to any agency or partner.

 


                                     

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to Key Targets and responsibilities

 

1. To raise aspirations, participation and set challenging goals for the achievement levels of all young people

 

1. Work with schools, colleges and training providers and other organisations to screen all young people for risk of underachievement

 

2. Provide help to review each young person’s strengths and weaknesses, understand their situation, recognise their potential and set goals

 

3. Provide advice to each young person on planning to achieve their educational and life goals, including impartial careers information, advice and guidance

 

4. Provide information and advice to each young person where required on health, lifestyle, financial support and other practical issues to assist them in achieving their goals

 

5. Provide each young person with information and access to personal development opportunities to broaden horizons and develop talents, including volunteering, community service activities, sports arts and recreational activities

 

6. Provide programmes of education to young people and carers on local risk factors associated with underachievement such as drugs, crime, bullying, pregnancy and gambling

 

7. Provide equal access to the above regardless of race, gender, disability, sexuality, and other potential discrimination

 

8. Work with schools, colleges and training providers and other organisations to improve attendance

 

 

3, 5, 6, 7, 8, 10, 11, 13, 14,

 

1.       All Stakeholders

 

 

 

2.       Schools/ IW College

Training Providers

Careers Service

 

3.       Careers Service

Schools/IW College

Training Providers

 

4.       All Stakeholders

 

 

 

5.       Voluntary/Community Sector

Isle of Wight Council

Private Sector

 

 

6.       Youth Offending Team, Drug Action Team, Teenage Pregnancy Unit

Schools/IW College, Youth Service

 

 

7.       All Stakeholders

 

 

 

8.       Schools/IW College, Police, Training Providers

 

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to Key Targets and Responsibilities

 

2. To provide all young people outside of learning with the support they need to fulfil their potential

 

1. Work with partners and other organisations to identify and provide support to young people pre and post 16 who are outside of learning or otherwise at risk of under-achieving* to enable them access and benefit from appropriate learning opportunities and/or employment

 

*This definition includes all young people from or with, minority ethnic groups, disabilities, health problems, language difficulties, literacy and numeracy needs, learning difficulties, pregnant teenagers and teenage parents, substance misuse, homeless or looked after, Learning Gateway, young offenders, neighbourhoods with lower participation rates and those who are re-entering the labour market

 

2. Arrange for the assessment and referral of young people to appropriate services according to their needs

 

 

3, 5, 6, 9, 10, 11, 13, 14,

 

 

 

1.       All Stakeholders

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.       All Stakeholders, Connexions personal Advisers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to key targets and responsibilities

 

 

3. To provide an integrated support service for young people and their carers to assist in engaging effectively with learning and employment

 

1. Provide co-ordinated access to specialist advice and services to all young people who need them, to remove barriers to learning such as difficulties accessing financial support, difficulties with housing and behaviour problems

 

2. Agree arrangements with partners for pooling staff and other resources where appropriate

 

3. Agree protocols to share relevant information on young people and services with partners

 

4. Agree protocols with youth offending teams for the assessment of all supervised young offenders, their referral to education, training and progression to employment and the provision of other support according to their needs

 

5. Collaborate in government initiatives to improve participation and achievement levels

 

6. Work towards joint targets with partners for reducing the incidence of youth offending, substance misuse and teenage conceptions

 

 

3, 5, 7, 8, 9, 10, 11, 12, 13, 14,

 

1.       Social Services, Voluntary & Community Sector, Benefits Agency, Education Department

 

 

2.       All Stakeholders

 

 

3.       All Stakeholders, CSNU

 

 

4.       Youth Offending team

 

 

 

 

5.       All Stakeholders

 

 

6.       Youth Offending Team, Drug Action Team, Teenage Pregnancy Unit

 

 

 

 

 

 

 

 

 

 

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to Key Targets and responsibilities

 

 

4. To influence and improve learning provision and other services for young people

 

1. Deliver the young persons charter

 

2. Monitor effectively the views of young people and stakeholders about learning provision, development opportunities and support services for young people

 

3. Identify shortfalls in the range, capacity and quality of all learning provision, development opportunities and support services for young people

 

4. Act as an advocate for individuals or groups of young people to ensure that they have access to appropriate learning opportunities and support services

 

 

 

3, 5, 6, 13, 14, 17

 

1.       All Stakeholders

 

2.       Youth Forum

 

 

 

3.       All Stakeholders

 

 

 

4.       All Stakeholders, Connexions Personal Advisers

 

 

 

 

 

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to key targets and responsibilities

 

5. To operate all connexions services with an equality of opportunity and open access for all

 

1. To communicate to all partners the need to have extending opportunity and equality of opportunity as part of their organisations culture and core practice

 

2. To monitor and ensure good practice exists across the whole service

 

 

3, 5, 6, 13, 14, 17

 

1.       All Stakeholders

 

 

 

2.       All Stakeholders

 

 

 

 

 

Strategic Objective

 

Key Tasks

Business Plan Section References

Link to key targets and responsibilities

 

6. To develop the capacity of the partnership to deliver the objectives above

 

To contribute to the South Central Connexions Partnership aims of:

 

1. Developing an effective customer information service

 

2. Putting in place effective arrangements to ensure the ongoing involvement of young people in the design, delivery and evaluation of the service

 

3. Recruiting, training and deploying a sufficient workforce of personal advisers and other staff to ensure that all young people can access the personal adviser and other services

 

4. Marketing, communications and branding of the service

 

5. Ensuring that the service and supporting activities meet the relevant national standards

 

6. Meeting the requirements of the grant terms and conditions as stated in the Financial Memorandum

 

 

3, 5, 8, 9, 10, 11, 12, 13, 15, 16, 17

 

 

 

 

1.       All Stakeholders

 

2.       All Stakeholders

 

 

 

3.       All Stakeholders

 

 

 

4.       All Stakeholders

 

5.       All Stakeholders

 

 

6.       All Stakeholders

 

 


 

 

 

 

 

 

 

 

 

 

 

 

20.  TIMESCALES, COSTS AND RESPONSIBILITIES

 

20.1 Subject to the above recommendations for the Isle of Wight Connexions Service having been ratified by the LMC following consultation with stakeholders, the recommendation in the Delivery Plan will be set against the relevant sections of the SCCP Business Plan with identified timeframes, costs and responsibilities.

20.2 In respect of timeframes, it is anticipated at the time of that South Central Connexions Partnership will “go live” on 1st September 2002. In the plan, the annotation by 31st August 2002 means therefore that an Implementation Activity Phase will be funded and operated from 1st April 2002 to 31st August 2002. Should a decision be made by CSNU that South Central Connexions Partnership will only “go live” from 1 April 2003, then a new funded arrangement will be identified for Implementation Activity Phase funding between 1st September 2002 – 31st March 2003.

 

 

21. PLANNING OBJECTIVES AND THE KEY DELIVERY TASKS:

 

21.1 Tasks have been identified and linked to the relevant section of the SCCP Business Plan. Timescales and responsibilities have been detailed with costs as appropriate. 

 

 

 

SCCP Business Plan - Section 3 Engaging Young People

 

DP1:           Regularly review the membership of the Youth Forum, its’ role and or contribution to Isle of Wight LMC Youth sub committee, and to the South Central Connexions Partnership

 

  • Quarterly
  • Transforming Youth Work Development Fund (TYWDF) worker, LMC and Young “Connexors”
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 5 Structure Delivery and Management

 

DP1:           With guiding terms of reference in place, agree the structures and reporting mechanisms of the LMC, the LMC Steering Group, LMC Sub Groups, Isle of Wight Youth Forum including clarifying the roles and contributions required by the LMC Chair, Local Connexions Manager and any other appropriate supporting staff

 

  • By August 31st 2002
  • LMC Chair and Connexions Manager
  • £

 

DP2:           Agree the framework by which stakeholders will join together to effectively deliver the Isle of Wight Connexions Service and identify lead bodies within each contract

 

  • By August 31st 2002
  • LMC
  • £

 

DP3:           Agree individual roles and responsibilities for all those who contribute to the Isle of Wight Connexions Service including the LMC, LMC Steering Group, Connexions Manager, Administrators, Information & Data Controller, TYWDF Worker, Personal Advisers from Schools, Isle of Wight College, Social Services, Youth Service, Voluntary Services, Youth Justice Service and Connexions Personal Advisers

 

  • By August 31st 2002
  • Connexions Manager with reference to SCCP
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 6 Needs Assessment

 

DP1:           Undertake further mapping of needs assessment to inform local and SCCP business planning that also includes the involvement of young people themselves

 

  • By August 31st 2002
  • LMC
  • £

 

DP2:           Identify the methodology that incorporates a requirement within contracts to supply ongoing needs assessment information, how young people are consulted, and how changes in need will affect changes in service

 

  • By August 31st 2002
  • Connexions Manager, LMC
  • £

 

DP 3:          Investigate the need to have a one-stop shop and/or information access points particularly in rural areas

 

  • By August 31st 2002
  • Connexions Manager with stakeholders
  • £

 

DP4:           Agree the methodology that will lead to an improvement in the understanding of needs by encouraging all key partners to collaborate and share their plans where they involve young people

 

  • By August 31st 2002
  • Connexions Manager with stakeholders
  • £

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 7 Performance Indicators and Targets

 

DP1:           The LMC will identify and agree the local contribution to the requirements placed upon SCCP to identify, collect and implement work towards the CSNU Performance Indicators, the key partners Cross Cutting Targets and the local Partnership Targets

 

  • By August 31st 2002
  • Connexions Manager with Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 8 Funding and Resources

 

DP1:           With SCCP Financial Accountant, prepare appropriate systems that will record and report back to SCCP the budgets and spend associated with the notional monies allocated to Isle of Wight Connexions Service

 

  • By August 31st 2002
  • Connexions Manager, Stakeholders and SCCP
  • £

 

DP2:           Involve all appropriate stakeholders in the planning required by Isle of Wight Connexions Service to implement contracts

 

  • By August 31st 2002
  • Connexions Manager, Stakeholders and SCCP
  • £

 

DP3:           Identify other sources of funding

 

  • By August 31st 2002 and Ongoing
  • Connexions Manager, and Stakeholders
  • £

 

DP4:           Establish “in-kind” contributions

 

  • By August 31st 2002
  • LMC, Connexions Manager and Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 9 Human Resources

 

DP1:           Prepare a human resource planning strategy to identify and describe for SCCP the implications and the details of numbers of staff to be deployed to deliver the Isle of Wight Connexions Service

  • By August 31st 2002
  • LMC, Connexions Manager
  • £

 

DP2:           Establish “in-kind” contributions to the human resources plan

  • By August 31st 2002
  • LMC, Connexions Manager and Stakeholders
  • £

 

DP3:           Establish a network of Personal Advisers and other delivery staff

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager and Stakeholders
  • £

 

DP4:           Contribute to a SCCP staff development and training programme that includes the Understanding Connexions and Individual Training for APIR programmes along with implementing other locally identified “needs training”

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager and Stakeholders
  • £

 

DP4:           Research the potential for a “peer group” training programme for young people wishing to progress to Personal Advisers through the establishment of a team of “Connexors”

  • After August 31st 2002 and then Ongoing
  • LMC, Connexions Manager and Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 10 Working with Schools and Colleges

 

DP1:           Introduce to all schools and the Isle of Wight the (CSNU based) School & College (Post 16) Delivery Model alongside minimum standards for the school and college partnership agreement

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager, LEA, Schools, Isle of Wight College and PA’s
  • £

 

      DP2:           Wherever possible, and using pilots and/or staggered delivery, plan and implement with schools and Isle of Wight College strategies that integrate careers education, personal and social health education, citizenship, and pastoral support

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager, LEA, Schools, Isle of Wight College and PA’s
  • £

 

DP3:           In support of DP2, plan and implement with schools and Isle of Wight College strategies that join together the delivery of the many agencies including educational welfare, behaviour support, special education needs as well as the key external agencies including youth service and education business links

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager, LEA, Schools, Isle of Wight College, Stakeholders and PA’s
  • £

 

DP4:           Identify and work with those young people for whom the current support is either failing, is not appropriate or for whom attention to social, emotional, behavioural or learning needs are a priority

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager, LEA, Schools, Isle of Wight College, Stakeholders and PA’s at Level 1
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 11 Working with Key Partners

 

DP1:         Establish a joint working protocol that builds upon the multi-agency work already existing on the Island to be able to provide joint planning for the collaborative delivery of the Service to young people

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager and Stakeholders
  • £

 

DP2:           Identify particular ways of working, collaborating and planning with the voluntary and community agencies across its entire sector

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager and Stakeholders
  • £

 

DP3:           Identify particular ways of working, collaborating and planning with the Learning and Skills Council using the Memorandum of Understanding model

 

  • By August 31st 2002 and then Ongoing
  • LMC, Connexions Manager
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 12 Performance Management

 

DP1:           To set up an LMC Sub-group with the aim of identifying and agreeing a local contribution to the requirements placed upon SCCP to demonstrate performance management and continuous improvement activities across every LMC and be mindful of future needs re OFSTED and Best Value Reviews

 

  • By August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 13 Information Sharing and Systems

 

DP1: Identify, and if required, design or modify the method by which the Isle of Wight Connexions Service can contribute to the SCCP information system requirements whilst at all times being aware of the Data Protection Act

 

  • From August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 14 Equal Opportunities

 

DP1: Identify, and if required, design or modify the method by which the Isle of Wight Connexions Service can contribute to the SCCP equal opportunities strategy and the Isle of Wight Council equal opportunities policy

 

  • From August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 15 Health and Safety

 

DP1: Identify, and if required, design or modify the method by which the Isle of Wight Connexions Service can contribute to the SCCP health and safety strategy and the Isle of Wight Council Health and Safety policy

 

  • From August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £

 

 
 

 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 16 Marketing Communications and Branding

 

DP1: Identify, and if required, design or modify the method by which the Isle of Wight Connexions Service can contribute to the SCCP marketing communications and branding strategy

 

  • From August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £

 

 
 

 

 

 

 

 

 

 

 

 

 

SCCP Business Plan - Section 17 Management Information

 

DP1: Identify, and if required, design or modify the method by which the Isle of Wight Connexions Service can contribute to the SCCP management information strategy

 

  • From August 31st 2002 and Ongoing
  • Connexions Manager with Stakeholders
  • £

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 


22. RECOMMENDED MODEL FOR DELIVERY

 

22.1 The recommended Isle of Wight Connexions Service delivery model has been adapted from that proposed by the CSNU July 2001 guidance set out in “Connexions for All” and from the discussions with stakeholders and the LMC.

 

22.2 The established assumption running through the Isle of Wight Connexions Service delivery model is that apart from the ever present statutory involvement with young people in schools or the Isle of Wight College, with the education authority and careers service, Isle of Wight Connexions will also promote out-of-school or college personal development work that involves the Youth Service, the Voluntary Community Organisations and other key stakeholders in the community.

 

22.3 Isle of Wight Connexions will give priority to Personal Advisers in their aims to help all young people gain access to services and to ensuring that those same young people feel involved and empowered in the decisions being made about them

 

22.4 Isle of Wight Connexions will enhance the staffing levels of some stakeholders by the provision of intensively working Personal Advisers working with young people at Level 1.

 

 

 


           

APIR – Assessment, Planning, Implementation and Review tool completed by Personal Adviser in consolation with young people and their parents/carers. 

 
                                                                                                                                                                                                                       

                                                                                                PA 1

Multi-agency intensive and co-ordinated support using APIR

 
                                   

                                                                                                1                                   LEVELS

 

 

 


One to one support with APIR

 
          PA 2

Isle of Wight Connexions Service will offer a universal service and thus the pyramid only describes the level of support available to a young person, it is not segmented to identify how “multiple problems” might be tackled. A young person may, and can quite legitimately access the higher levels of support, before returning once more to the lower level.

 
                                               

                                                                                                                                                                        2

Standard support, information advice and guidance

 
 

 

 


                                                                                                                                           PA3

3                             3                                                                                     

4                              

5                              

           AGE 13-19                                                                                 

 

22.5 A brief overview and description of the adopted operational model follows but first some assumptions have been made:

·         “A Principle Agreement” will be annexed to any SCCP contract operating between themselves and any Isle of Wight Connexions nominated Contractor, stipulating how service level agreements with individual educational institutions involved in Connexions will operate. This agreement would elaborate on the need for various conditions ranging from Multi Agency Panels, Data Protection needs, Information Exchange/Reporting requirements, Marketing and Branding and the Connexions qualifications held by staff.

 

 

23 The Isle of Wight Connexions Service Model – In Schools and Colleges

 

23.1 In School Model, Year 8

 

Month 1

In School introductions to the Connexions Service for young people aged 13

Month 2/3

Senior Management Team (SMT), working with the Children and Young People’s Services (CYPS) and a School based Connexions Personal Adviser (PA) undertake a review of pupil needs to identify and agree any additional support

Month 4/12

Implement and allocate “caseworkers” with identified students

Month 10/11

SMT, CYPS, PA and caseworkers undertake end of year review, plan year 9

Month 11/12

Connexions Partnership Agreement negotiated and signed for Year 9

 

23.2 In School Model Year 9

 

Month 1

SMT, CYPS, PA and caseworkers identify young people “likely to be at risk” in post 16 transition, initial caseload identified for PA

Month 2/3

Introduce statutory careers advice inform young people & parents post 16 options

Month 4/12

Implement individual case conferences, and allocate “caseworkers” with identified students, tracking and outreach work starts, involvement of multi agencies

Month 10/11

Education careers programme starts and dependent upon SAT’s identify any further young people needing support. KS 4 Planning

Month 11/12

Disapplication of National Curriculum, PA’s work with Education Business Links and others to identify alternative curriculum

23.3 In School Model Year 10

 

Month 1

SMT, CYPS, PA and caseworkers review progress following the potential for having involved other agencies and worked with many young people in the Summer Break

Month 2/3

Health Check on subject courses

Month 4/12

Implement individual case conferences, and allocate “caseworkers” with identified students, tracking and outreach work starts, involvement of multi agencies. Involve agencies in preparation and choices of work placements, mentoring and pastoral care. PA now proactive in tracking all “at risk” pupils and manages referrals accordingly. Liaise with Learning and Skills Council for needs of all pupils for post 16 planning

Month 10/11

Individual progress files updated SMT, CYPS, PA aware of young peoples needs

Month 11/12

Visit and monitor work experience

Year End

Conference that allows all partners to contribute to the reassessment of needs, including identifying young people transferring to pre 16 college courses, requiring one to one support, or requiring specialist support. Tracking and other data information shared

 

23.4 In School Model Year 11

 

Month 1

Year Start Review that allows all partners to re-confirm and contribute to the reassessment of needs, including identifying young people transferring to pre 16 college courses, requiring one to one support, or requiring specialist support. Tracking and other data information shared

Month 1/12

Delivery of careers guidance interviews and follow up employment and training in placement support from Southern Careers. Early identification through guidance interviews of young people deemed to be “at risk” when moving onto further education or training

Month 2

SMT, CYPS, PA and caseworkers review progress following the potential for having involved other agencies and worked with many young people in the Summer Break

Month 2/3

Issue Connexions and national insurance cards. PA allocated to work with groups of young people to identify continuing need for advocacy, mentoring and/or referrals to Learning Gateway/Youth Service/CYPS 

Month 4/12

Implement individual case conferences, and allocate “caseworkers” with identified students, tracking and outreach work starts, involvement of multi agencies. Involve agencies in mentoring and pastoral care. PA now proactive in tracking all “at risk” pupils and manages referrals accordingly. Liaise with Learning and Skills Council for needs of all pupils for post 16 planning. Identify students eligible for Summer Activities For 16 Years Olds programme

Month 10/11

Individual progress files updated SMT, CYPS, PA aware of young peoples destinations and future needs logged

Month 11/12

Summer activities, Link Courses and other “learning opportunities” identified with partners, planned and communicated by PA. Year End Review.

 

 

 

 

 

24.5 In Further or Continuing Education Year 12 & 13

 

Month 1

Year Start Review. Partnership agreements to be signed with Colleges, Training Providers, and Voluntary Organisations that allow all partners to contribute to the reassessment of young people’s needs, including one to one support or specialist support. Tracking and other data information shared. Pastoral support in Further Education for identified students

Month 1/12

Operate a college wide system to anticipate students that may be at risk of becoming early leavers and then with potential “early leavers” to introduce career and learning opportunities and labour market information. Publicise Connexions

Month 5/9

Pro-active outreach, identify those at risk, destination survey, work with LSC

Month 10/12

Implement individual case conferences, and allocate “caseworkers” with identified students, involve the multi agencies in mentoring and pastoral care. Yr End Review

 

24 The Isle of Wight Service Model – Young People Not In Education, Employment or Training (NEET)

 

24.1 Isle of Wight Connexions will introduce a one-stop-shop and information point concept

 

24.2 With support from the dedicated services provided by Hampton Trust, Com-ment Community Mentoring, Learning Partnership and the many stakeholders offering access or outreach services, Connexions has identified a principal base for a Connexions “one-stop-shop” and, where there are similar outreach offices Connexions “information access points” within schools and the Isle of Wight College

 

24.3 Pending the outcome of the SRB commissioned feasibility study, in business planning terms the one-stop-shop concept will secure the market, albeit with the co-operation of other agencies that have young people “referred” to them; Youth Service, Southern Careers, Social Services, Housing Services, Employment Services, Youth Offending Team, Probation, Pupil Support Services, Education Welfare, and the many purely voluntary organisations

 

24.4 With the one-stop shop concept, Isle of Wight Connexions Service will be able to match specialised clients with specialised staff, be able to work to the highest quality standards and with continued management and expert support from both the statutory and voluntary agencies be able to expand to meet the future demands on the service that local “mapping” has highlighted.

 

 

 

 

 

 

 

 

 

25 RESOURCING THE DELIVERY MODELS:

 

25.1 The principal contributors on the Island have been identified as the Education and Community Development Directorate (incorporating the Youth Service, Tuition and Behavioural Support and Educational Psychology); Social Services and Housing Directorate (incorporating Social Work teams, Family Solutions Teams, Independence Support project and Children’s Disability Team); Schools; the Isle of Wight College; the Youth Justice Service; the Police; Health; Social and Housing Services and Southern Careers - the local careers service company.

 

25.2 Significant input and resources in kind will come from self-funded voluntary agencies including Hampton Trust, Com-ment Community Mentoring, Youth Trust, Girls Friendly Society, Platform One, Mencap, Health and other stakeholders.

 

25.3 Key contributors too are representatives from Learning and Employment, the Sixth Forms and the Isle of Wight College, the Benefits Agency, Jobcentre Plus, the Education Business Partnership; the Lifelong Learning Partnership; the Hampshire and IOW Learning and Skills Council and Employers.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26. ESTIMATED RESOURCES AND POTENTIAL COSTS:

 

n.b. The status quo will continue for the current Careers Contract with individual stakeholder Service Level Agreements.

 

Contract

Route

 

Assessment of Need

Estimated

Current versus Estimated Required

PA Resource

PA1/ PA2/ PA3

 

Comments

 

 

 

Estimated

Income required including on-costs

 

 

Careers Company

 

6,500 (13-16)

@

Levels1/2/3

 

 

Current – Southern Careers staff

 

Reqd – additional 3 staff PA1/PA2/ PA3

 

1 PA -Special Needs to purchase from across all contracts

 

1 PA – Learning Gateway

 

1 PA – Further/Higher Education advice

 

 

3 x

 

=£70,000

 

Isle of Wight Council Social Services Directorate 

 

 

17 Care leavers

(13-19) @

Levels 1/2/3

 

Current – ISP Staff

 

Reqd – 1 additional PA1

 

To provide an intensively working PA with a caseload ratio of 1:8 with most complex Level 1 clients

 

Case referrals via manager of ISP only

 

1 x £25,000

 

= £25,000

 

Health Trust

 

Adolescents with mental Health issues

 

Current – CAMHS

 

Reqd – 1 Additional PA1

 

To provide an intensively working PA with a caseload ratio of 1:8 with most complex Level 1 clients

 

Case referrals via manager of Adolescent Mental Health Services only

 

1 x £25,000

 

= £25,000

 

Youth Offending Team

 

 

 

 

young people

(16-19)

@

Levels 1/2/3

 

 

Current – multi-agency team

 

Reqd – 1 additional PA1

 

To provide an intensively working PA with a case load ratio of 1:8 with most complex Level 1 clients

 

Case referrals via Manager of Youth Offending Team only

 

 

1 x £25,000

 

= £25,000

 

Com-ment Community Mentoring

 

 

 

Current project funded by SRB and New Start. New Start funding accessed by SCCP

 

Building on New Start budget to continue to provide a Community Mentoring Scheme accessible by all Stakeholders 

 

 

£25,000 This figure may be drawn from a separate funding stream

 

Compact Club 2000

 

11 clubs operational

 

Staffing provided by stakeholder organisations according to need

 

To provide external support to Schools by local co-ordination and additional supply staff as modelled by New Start: Round 2

 

£30,000

 

IW Connexions Manager

 “Connexors IW”

 

10,700 young people@

Levels 1/2/3

 

No current provision

 

To provide a team of 3 trained young people to act as an interface and support between service providers and service users

 

3 x £9,000

 

= £27,000

 

Isle of Wight Connexions and Steering Group

 

10,700 young people @

Levels 1/2/3

 

No current provision

 

Self-help Grant scheme for pro-active citizenship projects

 

£10,000

 

Development Officer

 

 

10,700 young people @

Levels 1/2/3

 

No current provision

 

To develop aspects of Connexions service as demand arises and identify and secure additional funding opportunities

 

£25,000

 

Competitive Tendering

 

 

 

 

 

Independent Housing Advice Service

 

Independent Counselling Service

 

Research Projects to inform local Strategy and Service

 

One Stop Shop Information centre (Newport) development

 

Information Centres in Schools/ IW College

 

Training Opportunities for Stakeholders

 

Personal Development Opportunities for young people

 

Citizenship Projects for young people

 

£10-12,000

 

£6,000

 

£6,000

 

£5,000

 

£10,000

 

£5,000

 

£10,000

 

£10,000

 

Isle of Wight stakeholders will have an estimated £263,000 to create additional resources for young people.

The funding may NOT be used for statutory service delivery.

Stakeholders are requested to indicate their preference fro spending on the enclosed pro-forma.