PAPER C
Purpose : for Decision
REPORT TO THE EXECUTIVE
Date : 25 FEBRUARY 2004
Title : 3RD QUARTERLY
PERFORMANCE MANAGEMENT REPORT
REPORT OF THE DEPUTY LEADER
IMPLEMENTATION DATE : 10th March 2004
1. The third Quarterly Performance Management Report for the period 1st October to 31st December 2003 is attached (Appendix 1) which allows the Executive to monitor and review key aspects of the Council’s performance against it’s objectives and to take corrective actions that are necessary.
BACKGROUND
2.
This is the third
Performance Management Report submitted to the Council’s Executive, the first
that is in a different format to the previous two. At Members’ request, information
is now presented by Portfolio with the exception of the revenue budget and
capital information. Update on progress of the Annual Action Statement and
District Auditors Letter plan 2001/02 will be included in the final Performance
Management Report for this financial year (May 2004)
3.
The Isle of Wight
Economic Partnership’s quarterly performance management update is reported
separately at this meeting.
4.
The performance
management report by portfolio will be submitted to all Select Committees for the
first time within the next two months.
5.
Establishing an
effective performance management framework is essential to realise the overall
vision as set out in the Council’s Corporate Plan for 2002/05- ‘Improving
Island Life’. The framework is a means to ensure that the Council has the
monitoring, service planning and decision-making mechanisms in place to deliver
its priorities and targets. set out the strategic context of the proposed
decision.
6.
In this report,
Members are requested to focus on the Summary of performance across the Council
as detailed in Section 1 together with the Areas to Watch under each Portfolio,
(Sections 2.1-2.8) and agree the actions being taken to improve performance.
CONSULTATION
7.
Heads of Service
and their staff have supplied the information within this report with Directors
being fully consulted on the content. External consultation has not been
necessary for this report since it is concerned with internal management
arrangements.
FINANCIAL/BUDGET IMPLICATIONS
8.
The report itself
does not have any budget implications. However, if Members make any decisions
regarding services identified in the report, these may have financial
implications.
LEGAL IMPLICATIONS
9.
It is a requirement
of the Local Government Act 1999 to deliver best value in service delivery of
which an effective performance management system is an essential part.
OPTIONS
10.
Option 1-That the
third Quarterly Performance Management Report is approved subject to any
amendments or comments by the Executive.
Option2-To agree the actions being taken for
Areas to Watch for the third quarter as detailed in Section 1 and within
Portfolio holder responsibility from Sections 2.1 to 2.8.
11.
The report is
long, reflecting the Council’s wide-ranging responsibilities. The main risk
associated with the above option is that if quarterly reporting fails to
achieve ownership amongst Members and staff, progressing performance management
will fail to be recognised as the way to improve services and achieve our
Corporate Objectives.
RECOMMENDATIONS 12.
To approve
Options 1 and 2 |
BACKGROUND PAPERS
13.
Annual Action
Statement 2003/04
CPA Improvement Plan
Public Service Agreement
Quarterly Performance Management Reports 1and 2
ADDITIONAL INFORMATION
14.
The following
appendix is attached to the report:
Appendix 1 Quarterly Performance
Management Report 3
Contact Point : Heidi Marshall, Principal Policy
Officer, Corporate Policy and Communications. Tel 823250 email
[email protected]
J BENTLEY Head of Policy and Communications |
P HARRIS Deputy Leader |
APPENDIX 1
ISLE OF
WIGHT COUNCIL
QUARTERLY
PERFORMANCE MANAGEMENT REPORT
THIRD
QUARTER – 1ST OCTOBER TO 31ST DECEMBER 2003
Quarterly Performance Management
Report
Quarter 3 October – December 2003
Contents
Section 1 : Summary
1.1 Key
achievements (from section 2.1-2.8)
1.2 Key
areas to watch & action to be taken (from section 2.1-2.8)
1.3 Priority
Improvement Areas
1.4 Best
Value Reviews
1.5 Financial
Performance Summary
·
Key Achievements for the Quarter
·
Areas to Watch and action to be taken
·
Updates on Areas to Watch reported in Q1 & Q2
·
Performance Management information on – Key Performance Indicators
& PSA targets
·
Summary Revenue Budget to the end of December 2003
2.1 Social Services & Housing - Improving health, housing &
quality of life for all
2.2
Economic Development, UK & EU Regional Issues - Encouraging job
creation & economic prosperity
2.3
Education & Community Development - Raising education standards
& promoting life long learning
2.4
Fire, Emergency Planning & Consumer Protection - Creating safe
& crime-free communities
2.5
Transport - Improving public transport & the highways
infrastructure
2.6
Sustainable Development, Environment & Planning Policy - Protecting
the Island’s physical environment.
2.7
Tourism & Leisure
2.8
Resources – Making It Happen
3.1 Executive Capital Report by Committee for
December 2003
SECTION 1 : Summary - Quarterly Performance Management
Report 3 (October to December 2003)
1.1 Key Achievements (drawn from section 2.1-2.8)
Key Achievements |
|
Successful
bid for £2.5million for Pan Estate under the Government’s Neighbourhood
Management programme |
Income collected via the
e-payments system exceeded £1m for the first time in 2003-04. |
Lifting of Health & Safety notice in
respect of the management of Health & Safety Training |
Zero
delayed transfers of care (delayed discharges) for several weeks within this
period. Only 1 delayed transfer in the last 2 months. |
Payroll Service to schools scored second in
the whole of England & Wales (151 LEA’s) in the most recent OFSTED
inspection. |
|
1.2 Areas to Watch & Action Taken/To Be Taken (drawn from
section 2.1-2.8)
Key areas to watch |
Action taken / to be taken |
PSA
Target 11 – Unemployment: increase employment rates in the over 50’s age
group. Help 120 long-term workless
people (by March 2005) to obtain employment via the Isle of Wight Economic
Partnership |
Close
monitoring of the Project and a request for a report on the project from the
Isle of Wight Economic Partnership. This PSA target
represents 1/12 of the overall PSA target and agreement and could ultimately
mean a failure to gain £277,000 for the Council. (Further
details are to be found on Page 15 – PSA Target) |
Various
significant budget pressures set out in the budget summary 1.5 and full
budget review for the period in section 3 |
Close
monitoring of both revenue and capital budgets by directors and service heads
to ensure that cash limits are adhered to. |
Wight Leisure future
service delivery and externalisation |
Review and await the findings
of the Executive Meeting (28 January 2004) Resolved at Executive –
that a project group be established. |
The percentage of major applications determined
within national standards (KPI24): Q1 – 60%, Q2 – 80%, Q3 – 37.5% |
The
Development Control team is to be reorganised to create a team dealing
exclusively with major applications, and the training on Section 106
Agreements should speed up this part of the process. |
Key
benefits performance indicators below Government targets |
Close performance monitoring, improved ICT
capacity, review of structures, implementation of Best Value Review and
Benefit Fraud Inspection recommendations (when received) Further
slippage in ICT upgrade - now expected to be complete in January 2004. |
The
Directorate is expected to reduce the number of placements made in
residential and nursing homes and support people at home with intensive home
care. The difficulty is the current lack of home care provision. |
The
hourly rate we pay for providers for home care has been increased to try and
push up the wages and attract more people to this area of work. Still an area of concern and
plans for managing this are moving forward. Revised commissioning strategy
agreed with the PCT. Tendering process for block locality contracts to start
in May 2004. |
Through the CPA process last year, there were a number of service areas that were highlighted as areas for improvement. To progress these areas for improvement and identify support needed from across the Council a framework has been devised beginning with initial briefing sessions to help scope the area for support and improvement. Action Plan summaries will then be produced, monitoring of which will be through this section in the Quarterly Performance Management Report.
The four areas highlighted for support and improvements are:
· Engineering Services - Highways
Quarter 3 update:
1.
Accommodation changes have been
finalised and building improvements/staff moves programmed for February/March
2004.
2.
A case has been made for an
increase in revenue budget and a decision is being awaited within the 2004/5
budget round.
3.
PFI is now being progressed with
a scoping exercise planned for February. After this an “Expression of Interest”
letter will be sent to Government for their comments.
·
Homelessness
Quarter 3 - Significant progress has been made in Homelessness. The number in bed and breakfast accommodation
has reduced; continued funding from the Bed and Breakfast Unit has enabled
further investment in staff in partnership with the IHAC. Additional staff will also be forthcoming
following the Service Planning process, which will enable a consolidation of
current progress and a further development of homelessness prevention
initiatives.
· Housing Benefits
Quarter 3
·
Further problems with ICT
upgrade – now expected to be completed by January 2004
·
New post appointment was
awarded, this has subsequently been declined and the post is being
re-advertised
·
Slight improvement in key PIs
despite lack of ICT upgrade
·
BFI consultancy arranged for
Overpayments, to be followed by performance
· Links with Housing and Social Services being developed
·
Planning
Quarter 3 - All
Best Value Performance Indicators continue to show promising improvements, with
the exception of KPI-24 Number of major applications processed within the
National Standards. The Best Value
Improvement Plan was approved by the Executive and will guide future change to
2007. Inspection will take place in May
2004.
The review work is finished, and the report has been
approved by the Executive. The improvement plan is now being implemented, and
the service will be inspected during May 2004.
Most of the review work is complete. The improvement
plan is now being compiled, integrating the findings from the Best Value
research with the recommendations from the IDeA fitness check and those arising
from the recently issued National Procurement Strategy.
Most of the evidence gathering is complete, and work
is now beginning on the improvement plan. Close liaison with the Benefit Fraud
Inspector continues, with whom a joint development plan will be produced.
1.5 Financial Performance Summary
Revenue
Expenditure:
A summary revenue budget monitor is displayed by Portfolio in Sections 2.1 to 2.8. Revenue spending to date is still largely in line with budget expectations. However, particular budget pressure areas have been identified, some of which also represent possible budget problems for future years:
·
Withdrawals from School Balances are at unprecedented
levels, indeed in certain cases the school will have applied the entire balance
available to them in order to fund ‘in year’ expenditure. Unless this situation
is redressed for the future pressure will be significant for many schools
budgets. Government proposals to guarantee minimum funding levels for next
year, and additional transitional arrangements, will help the situation for
those schools facing financial difficulty
·
Home to School Transport budgets continue to increase
above the level of inflation allowed in the budget and advice from the
Association of Transport Co-ordinating Officers is that LEA’s will require an
average increase of 7% in budget from April 2004 to maintain school bus
services at existing levels
·
Community Development and Leisure Services have a
number of areas where budget problems are apparent, including the Library
Service, Theatres, Technical Services Unit and Dinosaur Isle. The most
significant of these are Dinosaur Isle where income is likely to be down by
£35,000, and Shanklin Theatre where the operational deficit in the current year
is estimated to be in excess of £50,000
·
ICT have a number of ongoing projects, particularly
related to E-government, which are funded partly from grants and reserves – the
ongoing implications of these projects need to be regularly evaluated to ensure
budgets are in place to allow their continuation at an appropriate level. There
is also a major problem with the existing power supply to County Hall for which
a solution needs to be identifies and implemented
·
Engineering Services have a predicted overspend of
£153,000 on the concessionary fares budget which requires an ongoing solution.
In addition, recent adverse weather conditions have required emergency works
and safety initiatives to be undertaken, resulting in potential overspends of
£285,000 on highway maintenance, £10-15,000 on the rights of way and cycleway
networks, and £45-50,000 for cliff instability in coastal areas
·
Social Services have identified a number of potential
budget problem areas – these presently include the effects of the loss of the
Promoting Independence grant last year,
important in reducing bed blocking; and the level of residential care client
contributions where the full impact of a change in allowances last October will
not be wholly evident until later in the financial year
·
Housing Services have a potential overspend of £97,000,
mainly within the Homelessness budget – this is as a result of expenditure on
leasing properties which should in turn reduce B&B spending thereby
reducing the amount of overspend by the year end.
A
list of capital spending against budget on a summarised basis is shown at
Section 3.1. This is displayed by Service budget and shows that at the end of
December some 61.5% of the budget for the year is spent or committed, mainly in
the Environment and Transport and Education and Community Development budgets.
The over-commitment on Resources budgets is in respect of expenditure of
£675,000 on the approved Accommodation Review programme which is self-financing
over time as capital receipts are realised
However,
if all approved budgets were to be spent there would be a current
over-commitment of £0.6 million, assuming that £2.1 million of previously
anticipated capital receipts can be realised in this financial year. Any
anticipated receipts which cannot be realised (including those related to the
Accommodation Review mentioned above) will add to the over-commitment position.
The situation is being monitored by Directors on an ongoing basis, including
the identification of slippage (natural and planned) which could be used to
cover any approved capital receipts which cannot be realised in this financial
year.
Major
changes in the budget since the report for the last quarter are the inclusion
of gross expenditure budgets for Seaview Duver (£3.3m) and Castlehaven (£2.5m)
coast protection schemes. Large engineering projects at the Military Road, Newport
to Cowes Strategic Corridor, Newport to East Cowes Strategic Corridor, Newport
to Sandown Cycle Route and Ventnor Haven are all now complete and operational.
Several sections of the Island’s highways network suffered extensive shrinkage
cracking and deformation as a result of drought conditions earlier in the year,
which required a budget of £600,000 to be redirected to allow structural repair
works to be undertaken.
For
Education and Community Development, the most significant developments have
been made at Watergate School (£1.1m) and Medina House. Other major investments
have been made at Middle Schools, principally Kitbridge extension and Ventnor
staff room. In terms of Children’s Services the main investment project is the
Respite Care Home (£1.0m).
This section of the report shows the progress
and achievements that have been made in each of the Portfolio’s of the
Council. The report records and
demonstrates:
Please note that the following
indicators are not collected in Quarter 3.
These are reported bi-annually in the second and final quarters:
How are targets judged?
On
Target for Year End’:
- will be ‘yes’ if progress of 75% or greater
has been made by Q3 between the 02/03 baseline and the 03/04 target, or if the year end target has
already been met. (This applies to most targets, some work differently).
The
comments box can be used by services to explain data. Some targets compare
themselves with the same quarter a year ago to eliminate effects of
seasonality.
Level
of performance against previous quarter:
-
will be ‘higher’ if the level of performance is 10% or more
higher than previous quarter ì
-
will be ‘no change’ if the level of performance is within 10%
either way of previous quarter è
-
will be ‘lower’ if the level of performance is 10% or more lower
than previous quarter î
KEY
ACHIEVEMENTS QUARTER 3
Portfolio - Social Services & Housing Corporate Objective - Improving health, housing & quality of life |
|
1. The replacement of the Council’s
Electronic Social Care Record database has proceeded to the point at which
the project board has agreed the installation of equipment and the training
of the 400 system users. The project has reached this point on time and
within budget. |
5. The service has played a significant role
in the renewal of the Investors in People accreditation for the Social
Services and Housing Directorate. |
2. Detailed preparatory work for the
Children’s Services Inspection completed on time. This included the compilation of the required position
statement, files audit and selection of files, revision of Practice Handbook
for staff and staff training provided, publication of new leaflets for users
and negotiation with users and stakeholder agencies to participate in the
inspection programme. The Inspection will take place 14-30 January 2004. |
6. Completed workforce planning pilot in
conjunction with the Employer’s Organisation and organised a multi-agency
‘Futures Workshop’ to plan future steps in workforce planning. Both activities are integral to developing
the work of the Children’s Services Recruitment & Retention Task Group. |
3. Accepted the transfer of Wightcare (the
Council Home Care and out of hours service) into the Housing Services Division
– re-branded as Housing and Community Support Services |
7. Significant reduction in number of
households with children in bed and breakfast – down at end of the quarter to
11 |
4. Zero delayed transfers of care (delayed
discharges) for several weeks within this period. Only 1 delayed transfer in
the last 2 months. |
8. The Directorate maintained its two star
rating with improvement noted in Adult Services. |
QUARTER 3 -
AREAS TO WATCH
Portfolio -Social Services & Housing Corporate Objective - Improving health, housing & quality of
life |
|
Areas to Watch |
Action taken / to be
taken |
Change Management following the Executive
decision to take forward the ‘integration’ agenda for Children’s Services and
Education. |
It has already been recognised that there
is a need to ensure effective communication and consultation with staff in
both Directorates to facilitate a smooth transition. The planned change process will take
account of the recent re-structuring of Children’s Services in terms of
timetabling and desired outcomes for service users in bringing about an
integrated service. |
Educational Performance of Looked After
Children |
Work is in hand to enhance performance in
this regard through the Looked After Children Education Service; introduction
of School Liaison Officer; focus on ensuring Personal Education Plans in
place for all children and targeting support to individual children,
especially at a younger age. There will be an ongoing review of
performance in this area through the Development and Improvement Statement
and the LPSA agreement. |
Integrated
Community Equipment Service |
Need
for integrated community equipment service by April 2004. Some way to go until Department of Health
requirements fully met. Need for
urgent procurement of IT system. |
Meals
on Wheels |
The
current Meals on Wheels service urgently requiring overhauling. Service put out
to tender but original responses too expensive. Further negotiations with
prospective providers are promising but there is a short timescale and a need
for more resources. Negotiations and plans to proceed for new improved
service in 2004/05 |
AREAS TO
WATCH – UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
|
Portfolio - Social
Services & Housing Corporate Objective -
Improving health, housing & quality of life |
||||
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
|
Q1 Q2 |
Care
Partnership Forum & partners to work closely to ensure agreements
reached asap to establish resources needed for 2004/05. |
Possible
costs associated with repayments for clients charged for services under
Section 117 of the Mental Health Act - estimated at possibly £400,000 as a
one-off for which there is no provision. |
The
directorate and the commissioning body, the IW Primary Care Trust, are
monitoring the situation. |
The
council and the joint commissioning partner
(The IW NHS Primary Care Trust) are preparing a commissioning
strategy which will address future care provision and procurement, and the
resources that will be required. |
|
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
|
Q1 Q2 |
There
is currently a dispute with some residential homeowners who are not willing
to agree the purchase price that has been agreed with the majority of homes. |
This
is being pursued through the legal system and the effect on the placement of
clients is being closely monitored by a joint Health and Social Services
panel. |
The
Court process has started. This
continues to be a major issue and is now the subject of a court case with
the Council defending it’s position on the purchase price offered. |
District
court has agreed for case to be transferred to the High Court. Head of
Service and Deputy Director of Commissioning to meet homeowners on an
individual basis over the next month. |
|
Q1 Q2 |
Placement
Choice for Looked After Children – being able to ensure range of foster care
placements with appropriate educational, Children & Adolescence Mental
Health Service and social care support continues to be a significant issue
for the Council. There is also a
diminishing pool of specialist residential provision within the region with
the capacity to appropriately and safely accommodate young people with
particular needs. |
Q1: The development of foster care support
has been a particular interest of the Social Services & Housing Select
Committee. The committee continues
to monitor progress in this regard and some additional resources have been
made available over the last two years.
Authorities in the South East Region are also considering how to
develop a more co-ordinated approach to ‘managing the market’ in terms of
independent providers. There will be
a continuing need to review the resource needs of this service area which is
directly related to the Council’s ‘Corporate Parenting’ responsibilities. Q2: Ongoing work to implement and develop the
Foster Care Support package based on budgetary uplift for 2003-04 |
Ongoing
work to implement and improve foster care support package and maintain
recruitment and retention levels. |
Whilst
there has been some improvement in the recruitment of new foster carers on
the Island, there is still a heavy reliance on independent fostering
agencies. The developing support
strategy to retain existing carers and ongoing efforts to recruit new carers
remain essential activities for the Fostering and Adoption Service, |
|
Q1 Q2 Q3 |
The
Directorate is expected to reduce the number of placements made in
residential and nursing homes and support people at home with intensive home
care. The difficulty is the current lack of home care provision. |
The
hourly rate we pay for providers for home care has been increased to try and
push up the wages and attract more people to this area of work. |
Difficulty
with home care provision continues and is our major headache. There is a
plan drawn up for tackling this and work has begun on implementation.
Increasing the home care fees and moving towards block contracts are a major
part of the plan. |
Still an area of concern and
plans for managing this are moving forward. Revised commissioning
strategy agreed with the PCT. Tendering process for block locality contracts
to start in May 2004. |
PERFORMANCE MANAGEMENT
INFORMATION – KEY PERFORMANCE INDICATORS
Portfolio - Social Services & Housing Corporate Objective : Improving Health, Housing, and quality of life
for all. |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 3 |
Q1 Apr-Jun 03 |
Q2 July-Aug 03 |
Q3 Sept-Dec 03 |
Q4 Dec-Mar 04 |
Target for 2003 / 04 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Protecting
and providing for vulnerable adults & children |
1. The
number of looked after children per 10,000 less than 18yrs at end of quarter |
56.7 |
57.6 |
60.9 |
58.4 |
|
55 |
No |
è |
|
Cutting
deprivation & social exclusion |
2. Benefits -
average calendar days this quarter to process a new housing benefits claim |
64.9 |
78.6 |
75.73 |
69.9 days |
|
36 |
No |
è |
New computer system is not yet
installed which is affecting processing performance. Installation completed
on 19 January 2004 |
3. Benefits - %
of renewal housing benefit claims this quarter processed on time |
78.53% |
67.96% |
71.13% |
71.8% |
|
83% |
No |
è |
New computer system is not yet
installed which is affecting processing performance. Installation completed
on 19 January 2004 |
|
4. Benefits - %
of new housing benefit claims this quarter determined within 14 days of
receipt of all necessary information |
N/a |
59.04% |
58.37% |
61.8% |
|
64% |
- |
è |
New computer system is not yet
installed which is affecting processing performance. Installation completed
on 19 January 2004 |
|
Improving
the availability of affordable housing |
6. % of affordable housing
approved on qualified sites this quarter |
12.9% |
0% |
13.9% |
0% |
|
20% |
No |
î |
No qualifying sites in this
quarter |
PROGRESS TOWARDS PSA TARGETS |
||||||||||||||
Corporate Objective |
PSA Target |
PSA Target Summary |
Q1 Data |
Q2 Data |
Q3 Data |
Q4 Data |
On Target For The Year End? |
|||||||
Improving health, housing & quality of life for all |
|
Reduce the number of families with children & other households in
B&B accommodation |
56 |
58 |
38 |
|
Yes |
|||||||
5. Social Services |
Rehabilitation care for the older people & a reduction in delay of
discharges from hospital |
D41- 37.56 C28 – 5.8 C26 – 67.3 |
D41-12 C28-7.9 C26-144 |
D41 –12.69 C28 – 8.9 C26 - 113 |
|
D41 = Delayed transfers of care from hospital C28 = Intensive Home Care C26 = Admission of supported residents aged 65 years or over, to
residential care/nursing care |
||||||||
7. Social Services |
Increase the number of young people who are getting treatment for drug
or alcohol dependency (Drug Action Team) |
Information not provided |
440 persons = total Q1&Q2 |
201 persons |
|
Yes - 641 young people have received treatment The project has achieved 75% of its PSA lifetime target |
||||||||
Raising Education Standards & Promoting Lifelong Learning |
6. Social Services |
Improving the education, training and employment outcomes of care
leavers aged 19 |
A4– 64.7% QP8 - 18.8% |
A4 – 65% QP8 -14% |
A4–53% QP8– 0% |
|
Yes
- as far as can be predicted. The
actual results are confirmed in August with the LEA exam results
|
2.2 PORTFOLIO: ECONOMIC
DEVELOPMENT, UK & EU REGIONAL ISSUES
CORPORATE OBJECTIVE: Encouraging job creation & economic
prosperity
KEY
ACHIEVEMENTS QUARTER 3
Portfolio -Economic Development, UK & EU Regional Issues Corporate Objective – Encouraging Job Creation & Economic Prosperity |
|
1.
Successful bid for £2.5million for Pan Estate under the Government’s
Neighbourhood Management programme |
2. A
regeneration strategy for the Sandown Bay area, has been received through
extensive stakeholder and public consultation. |
QUARTER 3 - AREAS TO WATCH
Portfolio - Economic Development, UK &
EU Regional Issues Corporate Objective – Encouraging Job
Creation & Economic Prosperity |
|
Areas to Watch |
Action taken / to be taken |
That
a mechanism for delivering the Sandown Bay regeneration strategy is
identified and implemented such that it can be taken forward. |
Decision
to be made by the Executive in April 2004. |
PSA Target 11 – Unemployment, via the Isle of Economic
Partnership. This programme has
recorded no jobs created in the previous three quarters. |
Close monitoring of the Project and a request for a report on the
project from the Isle of Wight Economic Partnership. This PSA target represents 1/12 of the overall
PSA target and agreement. Failure to
deliver this target could mean a reduction of £277,000 to the Council. (Further details are to be found on Page 15 – PSA Target) |
AREAS TO WATCH – UPDATES FROM THE PREVIOUS QUARTERS
1 & 2
No outstanding Areas to Watch
PERFORMANCE MANAGEMENT
INFORMATION – KEY PERFORMANCE INDICATORS
Portfolio - Economic Development, UK &
EU Regional Issues Corporate Objective 2 of 6: Encouraging Job
Creation & Economic Prosperity |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 3 |
Q1 Apr - Jun 03 |
Q2 July - Aug
03 |
Q3 Sept-Dec 03 |
Q4 Dec-Mar 03 |
Target for 2003/ 04 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Establishing the
Island as one of the fastest growing economies in the region |
The number of new
jobs created via IW Economic Partnership activities this quarter |
100 (298 new
jobs between 1999 and 2002) |
41 (27) |
45 (43) |
54 |
|
133.3 |
Yes |
ì |
The figures for Quarter 1
& Quarter 2 have been revised upwards following contact with new business
to the Island. |
Ensuring all
residents are able to share in improving prosperity |
8. The change in
the average number of claimants (Job Seekers Allowance), this quarter
compared with the same quarter a year ago. |
2187 average
claimants over the year |
238 less
claimants compared with Q1 2002 |
204 less
claimants compared with Q2 2002 |
304 less
claimants compared with Q3 2002 |
|
1997 average
claimants over the year |
Yes |
ì |
Average is currently running at 1863, as opposed
to 2214 for the same period last year.
Indicator shows a decrease meaning fewer claimants due to employment
being found. |
PROGRESS TOWARDS PSA TARGETS |
|||||||
Corporate
Objective |
PSA Target |
PSA Target Summary |
Q1 Data |
Q2 Data |
Q3 Data |
Q4 Data |
On Target For The Year End? |
Encouraging
Job Creation & Economic Prosperity |
|
Create 75 new jobs (via the IW Economic
Partnership) |
41 (27) |
45 (43) |
54 |
|
Yes |
|
11. Unemployment |
Increase employment rates in the over 50’s
age group. Help 120 long-term
workless people to obtain employment (via the IW Economic Partnership) |
0 |
0 |
0 |
|
No
- Work has continued on the ESF bid. Unfortunately resolution of this bid has
been held over into Qtr 4 due to internal problems within SEEDA. The first
course was run in association with B&Q and JobCentre+ was a great
success. 10 clients attended the course and 3 were offered employment with
B&Q. One person has taken this up and the others are in process. As they
will not commence work until January, the results will be reported in Qtr 4.
Also the people assisted throughout the year by other IWEP assisted projects
who are legitimate outputs for this project will be reported then. In the
next quarter it is hoped to progress the ESF bid as well as, following the
success of the initial B&Q course, setting more courses with B&Q and
exploring similar courses with other employers. Details of the pump priming
expenditure for the year will be reported in Qtr 4. This
PSA target represents 1/12 of the overall PSA target and agreement. Failure to deliver this target could mean
a reduction of £277,000 to the Council. |
2.3 PORTFOLIO: Education
& Community Development
CORPORATE OBJECTIVE: Raising education standards & promoting life long
learning
KEY
ACHIEVEMENTS QUARTER 3
Portfolio - Education & Community Development Corporate Objective – Raising education standards & promoting life long learning |
|
1. Completion of Draft Local Preventative
Strategy in partnership with Social Services, Health and other key partners. |
4. Implementation of Community Cluster teams
to support schools. Working in
geographical areas co-ordinating support to Primary, Middle and High Schools
(Heads and Governing Teams) |
2. The successful launch of Workforce
Remodelling processes in four schools |
5. Agreed allocation of
£549,000 of £1.2 million awarded by the New Opportunities Fund towards the
installation of new multi-use games areas at Ventnor Middle and Sandown High
Schools. |
3. The Audit Commission survey of Isle of Wight
schools showed a high level of satisfaction with the central services
provided by the LEA. |
|
QUARTER 3 -
AREAS TO WATCH
Portfolio - Education & Community Development Corporate Objective – Raising education standards & promoting life long learning |
|
Areas to Watch |
Action taken / to be taken |
Key Stage performance data
at Key Stages 1 and 2 |
Select Committee to
consider performance data for 2003 at Feb/March meetings. |
Key Stage performance data
at Key Stages 3 and 4 |
Select Committee to
consider performance data for 2003 at Feb/March meetings. |
The Council’s licence to hold public records is due for renewal,
having previously been renewed on a temporary basis. |
Action is being taken to secure
funding to look at the feasibility of creating new storage facilities. |
Community Development Budget Issues –
Dinosaur Isle & Shanklin Theatre (See Summary Revenue Budget) |
Close management and monitoring |
AREAS TO WATCH
– UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
No
outstanding Areas to Watch
Portfolio - Education & Community
Development Corporate Objective 3 of 6: Raising educational
standards and promoting lifelong learning |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 3 |
Q1 Apr - Jun 03 |
Q2 July- Aug
03 |
Q3 Sept-Dec 03 |
Q4 Dec-Mar 03 |
Target for 2003 / 04 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Raising
achievement levels |
9. Percentage of 15 year
old pupils in schools maintained by the local education authority achieving five
or more GCSEs at grades A*- C or equivalent. |
44% |
- |
45.7% |
45.7% |
- |
51% |
- |
N/A |
|
10. Percentage of half
days missed this quarter due to total absence in secondary schools maintained
by the local education authority. |
8.58% |
7.74% |
6.73% |
6.77% |
|
8.6% |
Yes |
è |
The
figure for Q3 may need to be revised downward as one High School has had
problems with the software used to record absence. This would be even better
news |
|
Promoting
community learning |
11. The number of physical
visits per 1,000 population to public library premises. |
6,506 |
1,602 |
1,737 |
1,638 |
|
7,000 |
No |
î |
Seasonal fluctuations
explain the fall in library visits.
Service is confident of achieving end of year target |
Promoting learning that is
accessible to all |
12. Number of learners
this term in IWC supported provision (IW College, Family Learning Centres
etc.). |
2130 |
381 |
435 |
914 |
|
2106 |
Yes |
ì |
|
Corporate
Objective |
PSA Target |
PSA Target Summary |
Q1 Data |
Q2 Data |
Q3 Data |
Q4 Data |
On Target For The Year
End? |
Raising Education Standards & Promoting Lifelong
Learning |
|
Key
Stage 3 – raise achievement levels by 2% above target in Development Plan by
2006 |
|
English 65% Maths 68% Science 69% ICT 72% |
English 65% Maths 68% Science 69% ICT 72% |
|
These
are Annual figures Q2 data were target figures. These have now been confirmed and all meet or exceed EDP
targets for 2003. |
2. Education |
Raise
achievement of 7 & 11 year olds by 2% in schools of significant
disadvantage by providing family literacy support and improving adults basic
skills |
|
Adults participating 148 Adults gaining skills 83 |
Adults Participating 148 Adults gaining skills 83 |
|
These
are Annual figures Adults participating and gaining qualifications, these are
above the 2005 required target. Key
Stage 2 reading/writing gap reduction 4% |
2.4 PORTFOLIO:
Fire,
Emergency Planning & Consumer Protection
CORPORATE
OBJECTIVES: Creating Safe &
Crime-Free Communities
KEY
ACHIEVEMENTS QUARTER 3
Portfolio – Fire, Emergency Planning & Consumer Protection Corporate Objectives – Creating Safe & Crime Free Communities |
|
1. The production of our Fire Authority
Integrated Risk Management Plan. |
2. Number of working days lost to sickness by
whole-time staff. (target improving) |
QUARTER 3 - AREAS
TO WATCH
See first Area to Watch
Update Below |
AREAS TO
WATCH – UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
|
Portfolio - Fire, Emergency Planning & Consumer
Protection
Corporate Objectives - Creating Safe & Crime-Free Communities |
|||
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
Q1 Q2 Q3 |
Number
of days lost due to reportable accidents under Reporting of Injuries,
Diseases and Dangerous Occurrences Regulations (RIDDOR) |
The
RIDDOR reportable injury figure is high, due to some ongoing injury
absence. Of eight personnel who had
reportable injuries either ongoing or commencing after 1 April 2003, five
have now ended their current period of absence. Every accident is investigated and lessons learned are
implemented to avoid a repeat in the future. |
Ongoing
work with Occupational Health/Medical staff is addressing this and work
within the Council’s Attendance Policy. |
Three
persons remain sick with RIDDOR reportable injuries. The accidents are investigated to see if
systems of work need to be changed.
The persons are monitored as per the Welfare Policy. |
Q2 |
Retention
of Retained personnel |
Recruitment
drive started 10 October 2003.
Consideration being given to implementing Whole time/Retained duty
system. |
|
Retained
recruits course starts on 12 January 2004.
Further retained recruitment starts 23 January 2004. |
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
Q1 Q2 |
Recruitment
issues and long-term sickness absences have adversely affected recent crewing
levels. |
Recruitment
issues are being tackled with 3 new whole time fire fighters being employed
and work is in hand with Occupational Health to resolve the long-term
sickness issues. |
New
whole time fire fighters have now joined their watches. Retained recruitment campaign has
commenced. Further whole time
recruitment is in hand. |
Whole
time recruitment is under way with 5 recruits starting training on 4 May 2003. Further
vacancies will be identified in a 3 year Training Needs Analysis. |
PERFORMANCE MANAGEMENT
INFORMATION – KEY PERFORMANCE INDICATORS
Portfolio
- Fire, Emergency Planning & Consumer Protection Corporate
Objective 4 of 6: Creating safe & crime-free communities |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 3 |
Q1 Apr
–Jun 2003 |
Q2 July–Aug
2003 |
Q3 Sept-Dec 2003 |
Q4 Jan-Mar 2004 |
Target for 2003 / 4 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Cutting crime, disorder,
and fear of crime |
Domestic
burglaries this quarter per 1000 households |
9.7 |
1.9 |
1.4 |
1.7 |
|
9.5 |
Yes |
è |
|
Supporting a locally
controlled fire service |
13. % of incidents where
the number of appliances met standards of fire cover. |
98.8% |
99% |
99.5% |
99.5% |
|
99% |
Yes |
è |
Slight change to Q2 data
due to a review of the incident data |
14. % of incidents where
the number of riders met standards of fire cover. |
98.7% |
97.8% |
98.6% |
98.3% |
|
99% |
No |
è |
Slight change to Q1 &
Q2 data, due to a review of the incident data |
|
15. % of incidents where attendance
times met the standards of fire cover |
93.5% |
92.4% |
90.8% |
92.0% |
|
98% |
No |
è |
Slight change to Q1 &
Q2 data, due to a review of the incident data Underlying reasons are
under review |
|
Safeguarding public welfare
through our consumer protection services |
16. Score against
a checklist of enforcement best practice for environmental health (a) & trading standards (b) |
a) 81.6% b) 66.3% |
a) 81.6% b) 66.3% |
a) 81.6% b) 66.3% |
a) 85% b) 76.3% |
a)
85% b)
|
a) 83% b) 70% |
No No |
è |
|
17. Bereavement Services: Number of cremations in the
quarter |
1480 |
361 |
362 |
392 |
|
1455 |
Yes |
è |
|
PROGRESS TOWARDS PSA
TARGETS |
|||||||
Corporate Objective |
PSA
Target |
PSA
Target Summary |
Q1
Data |
Q2
Data |
Q3
Data |
Q4
Data |
On
Target For The Year End? |
Creating Safe & Crime
Free Communities |
8. Crime Reduction |
Reduce the number of domestic burglaries |
95 |
158 |
107 |
|
|
9. Fire Safety |
Reduce the number of accidental fires and casualties from them |
Calls
26 Deaths
0 Injuries
3 |
Calls
25 Deaths
0 Injuries
0 |
Calls
28 Deaths
0 Injuries
2 |
|
Yes target = 31 per quarter Yes target = 0 per quarter Yes target = 2.8 per quarter |
2.5 PORTFOLIO:
Transport
CORPORATE OBJECTIVE: Improving
public transport & the highways infrastructure
KEY
ACHIEVEMENTS QUARTER 3
Portfolio – Transport Corporate Objective –
Improving public transport & the highways infrastructure |
|
1. Local Transport Plan Settlement of £6.305
million for 2004/05. Additional funding allocated for major schemes,
provisionally accepted subject to the completion of the relevant statutory
procedures – Ryde Interchange £1.668 million 2004/05 – A3055 Undercliffe
Drive £4.510 million 2004/05 (£12.88 million over two years towards the cost) |
2. Substantial completion of Newport Town
Centre Traffic Management Scheme with minimal disruption to highway users. |
QUARTER 3 -
AREAS TO WATCH
Portfolio
– Transport
Corporate
Objectives – Improving public transport & the highways infrastructure
|
|
Areas to Watch |
Action taken / to be taken |
Under achievements on
highway inspections. |
Additional inspection
staff required to meet the agreed inspection regime |
Completion of Quality
Management System Audits prior to assessment by BSI for compliance with
ISO9001. |
Allocate 50% of audits to
QMS consultant. |
AREAS TO WATCH
– UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
|
Portfolio
- Transport
Corporate
Objective - Improving public transport & the highways infrastructure
|
|||
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
Q1 Q2 |
Completion
of bridge inspections within the prescribed time scale. |
Consideration
should be given to a revenue budget increase so additional resources can be
employed. |
Still
some concerns |
No
increase in budget within the present financial year so concerns remain. |
Q2 |
Insufficient
highway maintenance revenue budget. Particular concerns regarding repairs due
to summer clay shrinkage |
An
increase in budget |
|
Lack
of budget is causing a noticeable decline in the condition of the highway
network. Capital monies have been transferred to cover cost of repairing
heat-damaged roads. |
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
Q1 Q2 |
Meeting
of Local Transport Plan Targets for bus patronage. |
At
present continue to monitor head counts. |
Last
quarter has shown a significant increase in bus patronage compared to the
same quarter last year. |
Slight
decrease in patronage (-0.5%) compared to same quarter last year. However
there is still a possibility that end of year target will be met. |
Portfolio - Transport Corporate Objective 5 of 6: Improving
public transport and the Island’s infrastructure |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 03 |
Q1 Apr - Jun 03 |
Q2 July-Aug 03 |
Q3 Sept-Dec 03 |
Q4 Dec-Mar 03 |
Target for 2003 / 04 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Maintaining the highways
infrastructure |
18. % of incidents of reported dangerous
damage to roads & pavements this quarter made safe within 24 hours |
97% |
100% |
100% |
100% |
|
98% |
Yes |
è |
|
Encouraging travel by
sustainable means |
19. On Road -
Change in the no. of cyclists counted this quarter against same quarter last
year on 5 main Newport approach roads on 1 weekday per month |
872 |
- 118 |
-47 |
|
1510 |
No |
ì |
Comparisons of this quarter with the same quarter
last year show a slight increase in the number of on-road cyclists (2.3%) and
a large increase in the number of off-road cyclists (23.6%). This could be attributed to the completion
of the Newport to Sandown cycle way and the subsequent switch of cyclists
from on-road to off-road routes. |
|
20. Off-road -
Change in the no. of cyclists counted this quarter against same quarter last
year on 2 days per month (1 weekday & 1 weekend day) at 4 off road
monitoring points |
9430 |
- 587 |
1051 |
397 |
|
16,331 |
No |
î |
||
Promoting public transport |
21. Passenger journeys on
Local bus services (data 1 quarter in
arrears) |
5,54 million |
1.20 million (Jan to march 03). |
1,4 million |
1,719,487 (July to Sept 03) |
|
5.66 million journeys |
Yes |
ì |
The number of bus journeys has slightly decreased
compared to the same quarter last year (-0.5%: 1.73m to 1.72m). This is better than many other areas of
the country and reflects the local situation where the numbers of bus
journeys made are heavily influenced by the Island’s tourism trade. |
PROGRESS TOWARDS PSA
TARGETS |
Corporate Objective |
PSA
Target |
PSA
Target Summary |
Q1
Data |
Q2
Data |
Q3
Data |
Q4
Data |
On
Target For The Year End? |
Transport |
10.
Transport |
Increase the number of Cycling Trips |
50,667
trips this quarter |
73,672
trips this quarter |
32,732
trips this quarter |
|
The Cycle Promotion Officer job vacancy was
advertised nationally in Local Transport Today on 26/11/03 and locally in the
Isle of Wight County Press on 28/11/03.
The closing date for application forms was 12/12/03 and interviews are
due to be held on 15/01/04. The cycle
count methodology has now been agreed with the DfT. |
2.6 PORTFOLIO: Sustainable Development, Environment &
Planning Policy
CORPORATE OBJECTIVE: Protecting the Island’s physical
environment
KEY
ACHIEVEMENTS QUARTER 3
Portfolio - Sustainable
Development, Environment & Planning Policy Corporate Objective -
Protecting the Island’s physical environment |
|
1. Initial agreement with GOSE on timetable
for production of Local Development Framework |
2. Successful incorporation of new graduate planners
into Development Control team |
QUARTER 3 -
AREAS TO WATCH
Portfolio
- Sustainable Development, Environment & Planning Policy
Corporate
Objective - Protecting the Island’s physical environment
|
|
Areas to Watch |
Action taken / to be taken |
The percentage of major applications determined
within national standards (KPI24): Q1 – 60%, Q2 – 80%, Q3 – 37.5% |
The
Service is on target for meeting the Government Standard (50%) in 2003/04,
however: Changes
in staffing levels has impacted upon performance. Continual re-organisation within the Service should reduce the
impact on this Indicator. |
The
number of applications being submitted |
Q3
saw a significant increase in the submission of applications over and above the
numbers normally submitted in previous years (in Q3). This has had a significant impact on the
Service’s ability to register these applications in 3 days of their receipt. |
AREAS TO
WATCH – UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
|
Portfolio
- Sustainable Development, Environment & Planning Policy
Corporate Objective -
Protecting the Island’s physical environment |
|||
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
Quarter
3 UPDATE |
Q1 Q2 |
Relatively
low yield of affordable housing on qualified sites (KPI 6). |
Detailed
meeting with Head of Housing Services.
Section 106 training organised for 14 July 2003. Masterplan consultants now appointed for
Pan. |
A further meeting will be organised on affordable
housing field with Chief Executives of Housing Associations in November 2003. |
The meeting with
Chief Executives of Housing Executives was held in December 2003. Agreement was reached on how to
proceed. Further work is ongoing to
produce Supplementary Planning Guidance linking to the revised Housing Needs
Study. |
Q1 Q2 |
No. of major applications determined within national standards (KPI
24) |
Q1:
A Government standard of 50% needs to be achieved in 2003/04. The last quarter included only a small
statistical sample. The Development
Control team is to be reorganised to create a team dealing exclusively with
major applications, and the training on Section 106 Agreements should speed
up this part of the process. Q2: The momentum needs to be maintained
throughout the ‘standards’ year (2003/04). The organisational changes in Development Control
may produce a minor ‘one-off’ fall in performance in Q3. |
Q2 figures continue to show improvement |
There is now a backlog
of applications following the receipt of a significant number of applications
in Q3. This will affect performance
when determined. Changs in staffing levels has impacted upon
performance. Continual
re-organisation within the Service should reduce the impact on this Indicator |
Portfolio - Sustainable
Development, Environment & Planning Policy Corporate Objective 6 of 6:
Protecting the Island’s Natural Environment |
||||||||||
Corporate Priority (from Corporate Plan 2002 to 2005) |
KPI Description |
Actual 2002 / 3 |
Q1 Apr -
Jun 03 |
Q2 July- Aug 03 |
Q3 Sept
- Dec 03 |
Q4 Dec- Mar 03 |
Target for 2003 / 04 |
On Target for year-end? |
Level of Performance against previous quarter |
Comments |
Promoting sustainable service delivery |
22. Number of businesses enrolled on Island
Green Awards Scheme |
21 |
24 |
36 |
51 |
|
55 |
Yes |
ì |
|
Protecting the natural,
built, and historic environment |
23. % of new houses built on previously
developed land |
86% |
32% |
97.7% |
70% |
|
78% |
Yes |
î |
Based upon an estimate. However overall it is above the Government
Requirements |
24. Planning - % of major planning
applications determined within national standards (13 Weeks) |
42.5% |
60% |
80% |
37.5% |
|
50% |
Yes |
î |
Changes in staffing levels have impacted upon
performance. Continual
re-organisation within the Service should reduce the impact on this Indicator |
|
47.8% |
50.2% |
50.9% |
47.91% |
|
52% |
Yes |
è |
Seasonal - due to the
nature of waste collected at this time of year, Q3 is typically a poor
quarter for diversion from landfill. |
|
PERFORMANCE MANAGEMENT INFORMATION – PSA TARGETS
Not applicable for this Portfolio
2.7 PORTFOLIO:
TOURISM
& LEISURE
CORPORATE OBJECTIVE: Improving Health & the Quality of Life For
All
Encouraging
Job Creation & Economic Prosperity
KEY
ACHIEVEMENTS QUARTER 3
None recorded for this Quarter Report
QUARTER 3 -
AREAS TO WATCH
Portfolio - Tourism & Leisure Corporate Objectives - |
|
Areas to Watch |
Action taken / to be taken |
Isle of Wight Festival – Project Management |
Review and learn from the lessons of the previous Festival in 2003 |
Wight Leisure future service delivery and externalisation |
Review and await the findings of the Executive Meeting (28 January
2004) Resolved at Executive – that a project group be established. |
AREAS TO
WATCH – UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
No
outstanding Areas to Watch
PERFORMANCE MANAGEMENT INFORMATION – PSA TARGETS
Not applicable for this Portfolio
Portfolio – Tourism & Leisure Corporate Objective 1 : Improving Health
& The Quality Of Life For All Corporate Objective 2 : Encouraging Job
Creation & Economic Prosperity |
||||||||||
Corporate
Priority (from
Corporate Plan 2002 to 2005) |
KPI
Description |
Actual 2002 / 3 |
Q1 Apr - Jun 03 |
Q2 July- Aug
03 |
Q3 Sept - Dec 03 |
Q4 Dec- Mar 03 |
Target for 2003 / 04 |
On Target
for year-end? |
Level of
Performance against previous quarter |
Comments |
Promoting
healthy living |
5. Number of
Visits this quarter to IWC funded and / or managed Sports & Leisure
Facilities |
1,480,947 |
340,457 |
425,546 |
370,035 |
|
1,439,273 |
Yes |
î |
Seasonal fluctuations |
Supporting
tourism development |
7. Visits to
Tourist Information Centres this quarter compared with same quarter a year
ago |
382,629 |
16,232 more
visits this quarter |
11,338 6% more
visits this quarter |
3692 less visits
than this quarter a year ago |
|
390,000 |
Yes |
î |
Relocation of Ventnor TIC
from the High Street to the Coastal Visitor Centre reduced visits by 66%
(Sept-Aug 2003). Sandown TIC was
closed from 15-24 Dec for refurbishment |
2.8 PORTFOLIO:
Resources
CORPORATE OBJECTIVES: Making it Happen
KEY
ACHIEVEMENTS QUARTER 3
Portfolio – Performance Management & Resources Corporate
Objectives - Making it Happen |
|
1. Developed/undertaken a Benefits Best Value
Review in close cooperation with the Benefit Fraud Inspectorate. |
6. Arranged, and facilitated full
consultation with stakeholders and the public on the Healthfit Plans to
review the delivery of NHS services on the IoW. |
2. DIP project approved and funded. System
installed and configured. Basic training carried out. |
7. Income collected via the e-payments system
exceeded £1m for the first time. |
3. Delivery of successful Phase 1 diversity
training programme |
8. Lifting of Health & Safety Improvement
Notice in respect of the management of Health & Safety Training |
4. 15 call of contracts for legal services
let following national tendering exercise – predominantly let to Island based
firms – and ensuring high quality, cost effective supplement to the in house
legal provision. |
9. Delivery of high profile local democracy
week involving well over 200 young people and electing a new Youth Council
and Island Young MP and attracting significant positive local media coverage. |
5. Development of on-line financial
information |
10.
Payroll Service to schools scored second in the whole of England &
Wales (151 LEA’s) in the most recent OFSTED inspection. |
QUARTER 3 -
AREAS TO WATCH
Portfolio
- Resources Corporate Objectives - Making it Happen |
|
Areas to Watch |
Action taken / to be
taken |
Health Scrutiny continues
to take up a lot of officer time and resource. |
The team must finalize
the findings of the comprehensive consultation exercise for the Social
Services Select Committee on 19/2/04. |
Major power supply issues
to the County Hall site identified.
Which if not responded to will prevent the ICT Department from
completing current and future projects |
An urgent capital bid
(c£300-£350k) will be submitted as soon as the full scope of the problem and
solution is known. |
Demand on the ICT
Department currently exceeds capacity in the areas of - Database Management, Risk Management, Staff
Training, Information Management and Project Support |
Directors / Executive to
be aware and to take into account during decision making processes The ICT Department is
balancing its workload as best it can within the resources available. |
Risk of qualification /
amendment of significant number of BVPI’s next year |
Internal quality
assurance exercise to be undertaken. |
Property
Services Budget -last quarter spend |
Monitoring
budget spend – to end year within budget. |
Completion
of land transactions |
Pressure
to meet capital disposal target. |
Staff
capacity constraints, in the Corporate Policy Team is limiting the ability
to tackle key corporate issues |
Further
reorganisation proposals to be developed to enhance staff capacity |
Implementation
of the People Management Strategy |
The People
Management Strategy is a key CPA indicator and requires adequate funding to
implement and progress the programme. |
AREAS TO
WATCH – UPDATES FROM THE PREVIOUS QUARTERS 1 & 2
|
Portfolio - Resources Corporate Objectives -
Making it Happen |
||||
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
|
Q2 |
Variable
success in achieving Member commitment to BV Reviews – as measured by attendance
at Appraisal Groups. |
Improve
communication by using the most appropriate method for individual Members,
coupled with an initiative to reduce the number of Members on each Select
Committee, thus freeing up their time |
|
Ongoing issue to benchmark against other local
authorities |
|
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
|
Q1 Q2 Q3 |
Key
benefits performance indicators below Government targets |
Close performance monitoring, improved ICT capacity,
review of structures, implementation of Best Value Review and Benefit Fraud
Inspection recommendations (when received) |
Slippage
in planned ICT upgrade timetable – now expected up and running in November |
Further
slippage in ICT upgrade – now expected up and running in January |
|
Q2 |
The
competing views about the way in which the GAGS objectives should be met,
together with the competing demands for resources, are undermining the way in
which the project is implemented. This is likely to prevent the organisation
from meeting the 2005 e-government targets. |
Identified
as an issue with the Programme Board, Executive, Resources Select Committee
and Chief Executive. Strategic
priority to be determined by Full Council at its meeting on the 15th
October. |
|
Position
clarified. GAGS project reshaped on the back of the DIP project and work in
progress to implement in Planning. An
E-Government Manager is being appointed and work is being re-prioritised to address
the e-government target via on-line services rather than the intended
re-engineering approach |
|
Q2 |
Delays
in funding the Land and Property Gazetteer and the CRM project will mean that
these projects miss their planned implementation dates. |
Full
Council to take into account at its meeting on the 15th October. |
|
CRM
project has been downsized as an interim solution following Full Council decision
not to fund the full project at present |
|
Q1 |
Closure
of accounts needs to be speeded up to meet future statutory deadlines |
Techniques
and action plan being developed |
Developed
Closure of Accounts Working Party to progress action plan. By 2006 closure
& approval will be completed by 30th June and each year after |
Target
approval date for 2004 is July, ie. One year ahead of statutory requirement |
|
Q1 |
Regulation
of water quality in council buildings |
Management
monitoring & control of water quality in council buildings |
|
Most
surveys complete –some upgrading works in progress |
|
Q1 |
Crime
& Disorder – in relation to vandalism to council buildings |
Crime
& Disorder task group co-ordinating a multi agency approach to crime
& disorder |
Continue
to monitor the impact of vandalism on resources and liase with task group |
Monitor
trends & liase with task groups & police |
|
|
AREA TO WATCH |
ACTION TAKEN |
QUARTER 2 UPDATE |
QUARTER 3 UPDATE |
|
Q1 Q2 Q3 |
The
number of staff absences due to sickness |
Monitoring
of data and application of Council policies and procedures in respect of
attendance management |
Slight
decrease in number of days lost per employee but line managers need to
improve their attendance management of staff. HR staff to identify ‘hot
spots’ and advise Directorate Management Teams accordingly |
New
regime being put in place to monitor managers’ performance in terms of
absence reporting procedure in an attempt to improve the speed of information
update. Also widening managers’ on-line access to sickness reports. This
quarters figures up on last two as would be expected as historically November
and December have higher levels of absence. |
|
Q2 |
Lack
of women in top 5% of earners |
Although
steadily improving BVPI figure is below comparators. Regular monitoring to
continue. Focus
group of women managers to be convened to discuss issue |
|
BPVI
now at 33%, which is just below upper quartile (34%) for Unitary Authorities. |
|
Q1 |
Crime
& Disorder – in relation to vandalism to council buildings |
Crime
& Disorder task group co-ordinating a multi agency approach to crime
& disorder |
Continue
to monitor the impact of vandalism on resources and liase with task group |
Monitor
trends & liase with task groups & police |
|
Q1 |
Regulation
of water quality in council buildings |
Management
monitoring & control of water quality in council buildings |
|
Most
surveys complete –some upgrading works in progress |
Corporate Health KPI Description |
Actual 2002 / 03 |
Q1 Apr - Jun 03 |
Q2 July-Aug 03 |
Q3 Sept - Dec 03 |
Q4 Dec -Mar 03 |
Target for 2003 / 04 |
On Target for year-end? |
Direction of Performance against previous quarter |
Comments |
29. The number of members undertaking one or
more training activities this quarter (out of all 48 members). |
37 (77%) |
31 (64.6%) |
17 (35%) |
32 (66.67%) |
|
38 (80%) |
Yes |
ì |
|
30.
The number of types of
interactions that are enabled for electronic delivery as a percentage of the
types of interactions that are legally permissible for electronic delivery. |
16.37% |
17% |
17% |
20% |
|
40% |
Yes |
è |
Progress expected to be more rapid during 2004 as
funding has been provided to try and meet the 2005 deadlines of 100% of
services on-line. |
31. The total operating cost (TOC) of IWC
property per employee. |
£930 per employee |
£312.71 |
£210.37 |
£180.64 |
|
£275 per quarter |
Yes |
ì |
Some of the energy bills
maybe estimated lower than they actually should be. The 3rd Quarter includes part of the summer period
with lower energy invoices. Housekeeping
has been improved. Because of these
factors this downward trend is unlikely to continue. |
Corporate Health KPI Description |
Actual 2002 / 03 |
Q1 Apr - Jun 03 |
Q2 July-Aug 03 |
Q3 Sept
- Dec 03 |
Q4 Dec -Mar 03 |
Target for 2003 / 04 |
On Target for year-end? |
Direction of Performance against previous quarter |
Comments |
26. Number
of working days/shifts per employee (full time equivalent) lost to due to
sickness absence this quarter |
9 |
1.41 |
1.14 |
1.87 |
|
7.25 |
Yes |
î |
This quarters figures were produced on 15
January. This is before all data
regarding December will be in, so this figure will no doubt be light on the
final figure. It already shows an increase on the last quarters as would be
expected as it covers two of the heaviest months, November and December. |
27. Number of Complaints across the Authority |
Not available |
48 |
67 |
59 |
|
192 complaints or less per year (48 or less per quarter) |
Yes |
î |
The
total remains low because individual services vary in
their definition of a complaint. What
is recorded as a complaint and the final numbers that are passed to the
Corporate Policy Unit |
28. The number of
staff undertaking one or more training activities this quarter (via IWC
training Services) as a % of the total workforce |
45% |
24.3% |
23.4% |
20.44% |
|
47% |
Yes |
è |
|
PROGRESS TOWARDS PSA TARGETS
Corporate
Objective |
PSA Target |
PSA Target Summary |
Q1 Data |
Q2 Data |
Q3 Data |
Q4 Data |
On Target For The Year
End? |
Making It Happen |
12. Cost Effectiveness |
To
improve the cost-effectiveness Council-wide. 7.5% cost efficiency savings by
2006 |
Data
not available as a quarterly indicator, a year end return will be provided
and recorded against Q4 |
|
SECTION 3.1 : FINANCE REPORT – Revenue
Budget Monitor to the end of December
Social Services & Housing
|
|
Social Services |
Cost pressures include
£148,000 from the loss of Promoting Independence grant last year which is
still an issue. The Independent
Living Resources Centres are important in reducing bed blocking and promoting
independence. A savings requirement
of £194,000 is yet to be formally identified. However, at present it is envisaged that a net service
overspend of £26,000 will be contained within the existing cash limit. The largest unknown item at present is the
level of residential care client contributions due to changes in the benefit
system from October 03 relating to Pension Credit and Residential Allowance
which has resulted in financial assessments being undertaken for affected
clients. It is anticipated that the
full impact of this on the budget for residential care will not be fully
evident until later in the financial year. |
Housing |
Current net projected
overspend of £97,000 mainly within Homelessness budget. This is mainly due to
spending on leasing which should result in lower B&B spending and reduce
this overspend by the end of the financial year. |
Housing Benefits |
Housing Benefit
expenditure is currently in line with budget expectations for the year.
Income in the form of a Government subsidy is received monthly on account, and
is based on previous year’s figures until the external audit is complete. The
final settlement is received after the year end, but the appropriate
adjustments are taken into account in closing the accounts for the year |
Economic Development, UK and EU, Regional
Issues
|
|
Economic Development |
Currently on target. |
Education & Community Development
|
|
Education |
Net expenditure is in
large part in line with forecast with the exception of Home to School
Transport where both demand and pay & price increases exceed that
provided for in 2003-2004 original budget. Additional costs of some £88,000
are anticipated. Such increases are likely to be repeated in 2004 – 2005. It should also be noted
that withdrawals from School Balances are at unprecedented levels. In some
instances schools will have applied the whole of the balance available to
them to fund expenditure ‘In Year’. This will put subsequent years budgets
under pressure. Government proposals to guarantee minimum funding levels for
2004-2005 and the prospect of Transitional Funding of some £700,000+ will go
some way to alleviating the adverse position that would otherwise result for
schools that would be facing the greatest financial difficulty. |
Community Development |
Net expenditure largely
conforms with anticipated spending levels for the majority of services.
Income at Dinosaur Isle is anticipated to be down by £35,000. Previously
identified budget pressure areas are being managed by a combination of
one-off savings and short term cutbacks to contain net expenditure within the
cash limit – however the continuation of such measures may not be possible in
future years. In addition to the above, there is a new budget issue at
Shanklin Theatre where the operational deficit in the current financial year
is estimated to be in excess of £50,000. |
Fire, Emergency Planning and Consumer Protection |
|
Fire & Rescue |
On target. Audit
Commission currently carrying out a verification process to assess progress
against the modernisation agenda linked to the national pay award. |
Emergency Planning |
Currently on target. |
Consumer Protection |
Currently projecting an
underspend of up to £100,000 at the year end due to staff turnover and
inability to appoint appropriately qualified replacements. Part of this will
be used on a one-off basis to offset the likely overspend in bereavement
services. |
Bereavement Services |
Three specific budget pressure
areas for this service – the first is a likely under-recovery of income of
£15-20,000 arising from new burial charging arrangements; the second is an
issue within the grounds maintenance contract where increased costs of
£20,000 pa are being incurred and for which an ongoing solution needs to be
identified. Management control of the Coroner’s budget has now transferred to
this area – as before it requires continual monitoring to ensure adequate
resources are available for delivery of the service. Past trends indicate an
overspend at the year end of £20,000 may not be unlikely. |
Crime
& Disorder |
|
Transport |
|
Highways |
Budget pressure areas
are principally within highway maintenance where the combination of a reduced
budget and adverse weather conditions presently being experienced are
anticipated to result in an overspend of up to £285,000 – budget requires
close monitoring in the remainder of the year, particularly if weather
conditions do not improve. Non-essential works have largely ceased, but where
emergency measures are necessary or safety is an issue then there is a need
to continue with remedial works. |
Walking/Cycling |
The adverse weather
conditions are having an impact on the Rights of Way and cycling networks
where serious flooding has led to emergency repairs being necessary or
temporary closure in some cases. Estimated overspend is currently £10 –
15,000. |
Public Transport |
Overspend of £153,000
currently predicted in the concessionary fares budget, arising as a result of
a change in legislation related to
age equalisation. |
Cowes Floating Bridge |
Shorter maintenance
period has enabled an extra six weeks income generation which is equivalent
to £24,000. |
Transport Fleet |
Budget currently on
target. |
Car Parking |
At this stage of the
year, car parking income seems likely to produce a small surplus which can be
used to offset some of the highways and transport related overspends outlined
above if required. |
Sustainable Development, Environment and Planning
Policy |
|
Environmental
Initiatives including Local Agenda 21 |
Both the Local Agenda
21 budget and the Environmental Initiatives budget are on target at present –
the budgets now include environmental projects where external financial
assistance has been approved to augment existing services (e.g. LIFE
Response, Green Awards). |
Planning Policy,
Countryside & Planning Management |
Currently on target,
Planning Delivery Grant of £166,588 received this year to aid service
improvement, further (increased) sums due to be received in future years
assuming service improvement is achieved. |
Development Control |
Income likely to exceed
expectations by up to £60,000 if current trend continues. However, year end
surplus is likely to be significantly less due to additional administrative
costs related to increased workload. |
Building Control |
Income likely to
provide a surplus at the year end of up to £40,000 if present trend
continues. |
Coastal Management |
On target at present –
increased maintenance budget requirement being absorbed this year, but was
reintroduced into the service planning process for future years – hence it is
still an area which requires an ongoing solution. As is the case for the
highway maintenance budget, the effects of adverse weather conditions are
having an impact on cliff stability, with a current requirement for emergency
remedial works of £25,000, plus geotechnical fees of £20,000 to provide a
report on further works which may be necessary as a result of the recent wet
weather. |
Harbours and Seafronts |
Newport Harbour and
foreshore budgets on target at present – possible deficit of £10,000 on the
operational costs of Ventnor Haven due to management fees incurred in a
period when income generation has been low. |
Engineering Contracts |
Main engineering
contracts for street cleansing and public convenience cleansing on target at
present. |
Waste Management |
Waste management
budgets on target at present – green waste contractual dispute with Island Waste
Services now likely to go to full arbitration. Budget pressure area most
likely to be landfill tax – on target at present. |
Tourism and Leisure
|
|
Tourism |
Currently on target.
New Destination Management System (DMS) currently being implemented. However, this is later than expected and
may result in a carry forward being necessary. |
Leisure - Parks and
Beaches and Leisure Facilities |
Identified budget
pressure areas are currently being managed by a combination of one-off savings
and short term cutbacks to contain net expenditure within the service cash
limit – however the continuation of such measures may not be possible in
future years. |
Leisure – Wight Leisure
Operations |
The progress of the
leisure ‘One Card’ scheme continues, with the all-inclusive ‘Option 3’
proving successful, despite capacity issues in gyms at peak times. Casual
income in leisure centres continues to drop in line with card increases, but
is monitored and following expected trends. Income from the 14 seasonal
sites/activities for 2003 was 3% (£15,000) below budget. However, overall the
service areas are expected to perform within budget. |
Resources
|
|
Corporate Services
Directorate |
Responsibility for
Coroner’s budget now transferred to Bereavement Services – remaining budget
on target. |
Legal and Democratic
Services |
The position on Land
Charges income has improved since the previous quarter, but there is still a
potential shortfall in income of £20,000 |
Financial &
Business Services |
Budget currently on
target. |
Information
Communications Technology |
A number of ICT
projects, particularly those related to delivery of E-government, are funded
partly from reserves and Government grants. There are ongoing funding
implications of those projects, and it is essential to ensure that base
budgets are in place to allow the continuing development of the approved
projects; in addition, there are a number of proposed developments for which
funding streams will also have to be identified if further progress is to be
made |
Human Resources &
Training |
The budget for the
Health and Safety training programme for managers is currently only 5% paid
and committed – there is a likelihood that it will be significantly
underspent this year. |
Policy &
Communications |
Currently on target –
however, budget pressures are being funded from one-off resources carried
forward from previous years – the continuation of such measures is unlikely
to available in future years. |
Best Value & Select
Committee Support |
Currently on target. |
Property Services |
Currently on target.
Markets budget staying within plan. |
Building Maintenance |
Currently on target. |
SPEND /
REVISED COMMITMENT
SERVICE BUDGET TO DATE LEFT
Economic Development Tourism Planning and Leisure
TOTAL FOR SERVICE £456,623 £260,358 £196,265
Education and Community Development
TOTAL FOR SERVICE £13,125,574 £6,345,210 £6,780,364
Environment and Transport
TOTAL FOR SERVICE £14,188,981 £9,945,623 £4,243,358
Fire and Public Safety
TOTAL FOR SERVICE £80,586 -£40,468 £121,054
Resources
TOTAL FOR SERVICE £816,048 £1,574,713 -£758,665
TOTAL FOR SERVICE £4,666,995 £2,429,008 £2,237,987
TOTAL FOR REPORT £33,334,807 £20,514,445 £12,820,362
Full Details of
Capital on a project-by-project basis can be found on the Council Intranet or
by clicking on the link below:-
http://wightnet2000.iow.gov.uk/directorates/finance/finance_business_services/images/Septemberreport.pdf
The Capital Report will be available by Portfolio as soon as resources permit.