PAPER E1
Purpose : For Decision
REPORT
TO THE EXECUTIVE
Date :
17 NOVEMBER
2004
Title : SECOND QUARTERLY PERFORMANCE MANAGEMENT REPORT 2004-05
REPORT
OF THE DEPUTY LEADER
IMPLEMENTATION DATE : 29 November 2004
SUMMARY/PURPOSE
1. The Quarterly Performance Management
Report for the second quarter (July-September 2004) is attached as Appendix 1.
It allows the Executive to monitor and review key aspects of the Council’s
performance against its objectives and to take any corrective actions that are
necessary.
BACKGROUND
2. This is the second Performance
Management Report for 2004-05 and covers the period 1st July to the
30th September 2004. The report summarises performance across all of
the Council’s Directorates. The report format has been revised with the Areas
to Watch being modified to identify in one list all of the current Areas to
Watch ranked by risk score. The basket
of key performance indicators has been modified slightly with the inclusion of
three new local indicators for the Portfolio Sustainable Development,
Environment and Planning Policy, these include:
·
Building Control Inspection notices within statutory
time limits
·
Renewable energy sources introduced as part of the
Council’s direct involvement
·
Energy consumption and tonnes of C02 produced from
running the Council buildings (this is an annual performance indicator)
3. Quarterly Target profiles have been
included to monitor the progress of the performance indicators throughout the
year, which are now measured by assessing the actual quarterly performance
against the appropriate targets.
Feedback from the previous Executive Meeting when the first Quarterly
Performance Management Report (QPMR) for 2004-05 was discussed have been taken
on board including:
·
Children’s Services KPI2 (BVPI 45) has now been split
into authorised and unauthorised absence in the comments field of the indicator
·
Dinosaur Isle and Theatres has been included under the
Adult and Community Services Portfolio
·
Additional performance indicators for Economic
Development are being considered in relation to the Economic Strategy for the
Island for inclusion in the quarter 3 report
·
Unfortunately there is limited information on bullying
in schools that can be included in the report at this time
4. It is proposed that the third QPMR will
include the performance summary in the covering Executive Report. This will include the key achievements
(section 1.1), key Areas to Watch (section 1.2), with appendices for the
Corporate Parenting information, Isle of Wight Economic Partnership and budget
information. The full QPMR would be
circulated separately to Executive Members.
5.
At the Executive (Meeting of the 5th May
2004) a report was presented setting out the basket of Corporate Parenting
indicators, it was agreed that the Chief Executive Officer should report
progress bi-monthly to the Executive, but it is appropriate for this
information to be part of the QPMR. The
Corporate Parenting (looked after children) indicators, current results and
benchmarking information have been included and are attached as Appendix 2 to
this report.
6.
There are two
indicators that show improved performance.
·
The number of looked after children who have had three
or more placement moves in the last year (page 1 – Appendix 2)
·
The number of children looked after who have had a
health assessment in the last year – annual indicator (page 1 – Appendix 2)
There are three indicators
identified as showing poor performance.
·
The annual looked after children GCSE results as a
percentage of the year cohort (page 1 – Appendix 2)
·
Numbers of children that are re-registered on the
Child Protection register in the last year (page 2 – Appendix 2)
·
Educational achievement, the percentage of children
leaving care aged 16+ with 1 GCSE (2003) National Target = 75.5% (page 4 –
Appendix 2)
6. A
report has been requested by the Executive (Meeting of the 2nd June
2004) on the previously reported long-term Areas to Watch for 2003-04. Action Plans have been developed with the
Heads of Service for the following issues and included as appendix 3 to this
report:
·
Human Resources –
sickness absence
·
Planning Services –
affordable housing
·
Transport – bridge
safety inspections
·
Property Services –
vandalism to Council buildings and property
7. Appendix
4 covers the activities of the IWEP as reported to the IWEP Board of Director’s
by the Managing Director in September 2004.
On the 3rd December 2003 the Executive resolved to continue
to monitor the work of the Isle of Wight Economic Partnership on a quarterly
basis as part of its contract management role.
The report provides an overview of performance on all of the IWEP
activities and is not restricted to the relatively small proportion of those
activities which are funded by the Council.
STRATEGIC
CONTEXT
8. It is essential to have in place an
effective performance management framework to ensure the Council can deliver
its priorities and targets through measuring and monitoring. The framework is
also required to realise the overall vision as set out in the Council’s
Corporate Plan for 2002/05.
9. In this report, Members are requested to
focus on the Summary of performance across the Council as detailed in Section 1,
this includes key achievements 1.1, the key Areas to Watch section 1.2 and
performance indicators section 1.3.
10. There has been a noticeable increase in
the number of Areas to Watch, there are 20 Areas to Watch with a risk score of
9 or more, 3 of which have been scored at 16 the highest risk score. For the quarter 3 report, the identified
strategic risks listed on the Strategic Risk Register will be included and
monitored within the QPMR report.
11. Significant progress is being made to
improve performance, within the basket of performance indicators (section 1.3),
38 out of 67 (57%) indicators have achieved or exceeded their quarterly
targets. However, 20 out of 67 (30%) of these indicators, are below their
quarterly targets by more than 5%. Of these 20, the following 8 indicators are
identified for particular attention:
·
Section 2.1 (page 12) Adult & Community Services –
KPI-4 The actual number of people on the Island who are using the Direct
Payments Scheme to choose and arrange their own social care services, there
were 23 less people choosing to use the Direct Payments Scheme than had been
forecasted, a shortfall of 30%.
·
Section 2.1 (page 12) Adult & Community Services –
KPI-7 Number of users of the Mobile Library Service, for the second quarter the
target has not been achieved, there were 420 less users than had been
forecasted.
·
Section 2.1 (page 12) Adult & Community Services –
KPI-8a/b/c Museum visits, all three performance indicators for this Service
area have not reached the quarterly targets.
·
Section 2.6 (page 28) Sustainable Development,
Environment & Planning Policy – KPI-4a Affordable Housing, the number of affordable
housing units negotiated on qualifying sites identified in the UDP this
quarter, no units were negotiated on sites this quarter however a sum of
£228,250 was negotiated through the Section 106 agreement.
·
Section 2.6 (page 29) Sustainable Development,
Environment & Planning Policy – KPI-7 Cleanliness of public toilets no more than 12 defaults issued to
the contractor, the service issued 28 defaults 16 more than expected.
·
Section 2.8 (page 37) Resources – KPI 6 – Number of
types of interactions that are enabled for electronic delivery, we are
currently reaching 30% out of a year end target of 60% (this is a BVPI indicator
that will influence our upcoming CPA score).
12. The majority of the 12 Local Public
Service Agreement (PSA) Targets have achieved their quarterly targets 7 out of
the 12 (58%), however there are 2 that have not realised quarterly targets:
·
PSA 6 (page 15) – Children’s Services - Improve the
education and employment outcomes of care leavers, the proportion of looked
after children obtaining 5 GCSE’s at grade A*-C this is 19.5% of the quarterly
target.
·
PSA 11 – Economic Development – Unemployment, increase
the employment rates in the over 50’s age group a nil return has been recorded
·
A separate report on the current performance of the
Local Public Service Agreement Round One Targets and proposed Round Two details
has already been requested and is on the Directors Group agenda and the
Executive forward plan for January 2005.
CONSULTATION
13. Heads of Service and their staff have supplied
the information within this report with Directors being fully consulted on the
content. External consultation has not been necessary for this report since it
is concerned with internal management arrangements.
FINANCIAL/BUDGET
IMPLICATIONS
14. The report itself does not have any budget
implications. However, if Members make any decisions regarding services
identified in the report, these may have financial implications.
LEGAL
IMPLICATIONS
15. It is a requirement of the Local
Government Act 1999 to deliver best value in service delivery of which an
effective performance management system is an essential part.
OPTIONS
16. Option
1 -That the second Quarterly Performance Management Report of 2004-05 including
the appendices, is approved subject to any amendments or comments made by the
Executive.
Option
2 – To agree the actions being taken to address the Areas to Watch as detailed
in the Performance Summary Section 1.2 and within the Portfolio sections
2.1-2.8 and for the long-term Areas to Watch as detailed in Appendix 3.
Option
3 – To request the Portfolio Holders and Select Committees to investigate
the eight performance indicators that have fallen short of their targets as
detailed in paragraph 10 and the two PSA Targets in paragraph 11 and report
back with action plans to the Executive.
EVALUATION/RISK
MANAGEMENT
17. The report is long, reflecting the
Council’s wide-ranging responsibilities. The main risk associated with the
above options is that if quarterly reporting fails to achieve ownership amongst
Members and staff, progressing performance management will fail to be
recognised as the way to improve services and achieve our Corporate Objectives. Improving the performance of the Council is
a key component of the Comprehensive Performance Assessment (CPA) and has been
identified in the recent Peer Review (September 2004)
RECOMMENDATIONS
18. To approve Options 1,2 and 3
BACKGROUND
PAPERS
Annual
Action Statement 2004/05
Public
Service Agreements
Previous
Quarterly Performance Management Reports quarter 1 2004-05 and 2003-04, quarters 1-4
Contact
Point: Heidi Marshall, Principal Policy Officer, Corporate Policy and
Communications. Tel 823250 email [email protected]
JOHN
BENTLEY Head
of Corporate Policy and Communications |
PETER
HARRIS Deputy
Leader |
APPENDIX 1
Quarterly Performance Management Report 2004-05
Quarter 2 Report: July - September 2004
Contents
Section 1 : Summary
1.1 Key achievements (from section 2.1-2.8) Page 2.
1.2 Key areas to watch & action to be taken (from section
2.1-2.8) Page 3-5.
1.3 Performance Summary:
·
Performance Indicators – KPI’s & PSA Targets Page 6
·
Corporate Actions – Annual Action Statement Actions Page 7.
1.4 Priority Improvement Areas Page 8.
1.5 Best Value Reviews Page 8.
1.6 Financial Performance Summary Page 9.
Section 2
: Performance Management & Assessment – By Portfolio
Including information on the following
areas
·
Key Achievements for the Quarter
·
Areas to Watch and action to be taken this quarter
·
Performance Management information on: – Key
Performance Indicators & PSA targets
2.2 Children’s Services Page
14-17.
2.3 Economic Development, UK & EU Regional
Issues Page 18-19.
2.4 Fire, Emergency Planning & Consumer
Protection Page 20-22.
2.5 Transport Page 23-24.
2.6 Sustainable Development, Environment &
Planning Policy. Page 25-27.
2.7 Tourism & Leisure Page 28-30.
2.8 Resources Page 31-36.
Section 3 : Finance Report Page 37-41.
3.1 Executive
Revenue
3.2 Capital
Report
Section 4 : Appendices
Appendix 2 - Corporate Parenting
Indicators
Appendix 3 - Long-term Areas to
Watch
Appendix 4 - Report of the Isle of
Wight Economic Partnership
Section 1 : Summary – Quarterly Performance
Management Report 2004-05 Quarter 2 (July-September)
1.1
Key Achievements (drawn from sections 2.1-2.8)
KEY ACHIEVEMENTS |
The
island has one of the lowest rates of delay to hospital discharge in the
region, sustaining a zero rate for many weeks in the quarter. This low level
is sustainable and due to investment and partnership across the social care
and health economy |
Introduction of new low interest loans scheme to assist
owners maintain their homes |
Significant improvement in 2004 pupil achievement in the
national tests for eleven year olds in English and mathematics. LEA in the
top ten of improved Authorities. Council congratulated by Schools’ Minister
David Milliband. |
All-Party Parliamentary Cycling Group award (2004) for one
of the most improved highway authorities in England at implementing measures
to increase cycling. |
Legal Services Team achieved re-accreditation to the Law
Society Practice Management Standard, Lexcel and is still the only legal
practice on the island so accredited |
Housing Benefit performance now well in to upper quartile
performance in second quarter |
Environment waste collection service has continued to
achieve improving performance in the percentage of household waste recovered
and not sent to landfill and the number of missed waste collections remains
well below the quarterly target |
Inclusion of Operational Manager (Maintenance) in Peer
Review of Waste Management in Welsh Authorities |
The junior sports challenge and children’s activity
programme at Medina Leisure Centre, held over the Summer holidays, had their
best ever levels of attendance, engaging over 2,600 young people in physical
activities |
Implementation of fixed penalty notice scheme for truancy
and absence from school. |
Completion of the first phase of consultation on School
Organisation. 18 meetings presented with key issues for the Education
Service. Consultation feedback summarised in report to the Executive
(06/10/04) |
Island Branding Strategy – Support for Shirley Robertson
and crew under “team Isle of Wight” has reaped a massive return on
investment in terms of promoting the Isle of Wight. |
Draft Licensing Policy agreed and is out for consultation,
it is to be presented to Council in December for approval (new alcohol legislation) |
Commencement
of the West Wight Landscape Partnership Project |
Sales for advertising in both the main Isle of Wight Guide
and Winter Pocket Guide exceeded targets
|
Successful
roll-out of the new meals on wheels service. The new service has overcome
initial difficulties and is now beginning to deliver some of the
flexibilities and benefits planned at inception |
1.2 Areas to
Watch and Proposed Action (drawn from section 2.1-2.8)
This
section of the report has been previously limited to identifying the Areas to
Watch, the proposed action to be taken and then the quarterly updates. However, there are specific risks also
attached to the Areas to Watch. Using
the Councils Risk Management Framework a risk assessment score has now been
applied to each issue. The intention is
to use this information to identify and focus in on the strategic Areas to
Watch for the Council, enable greater debate and dialogue and to better manage
risk and improve the performance of the Council.
Heads of
Service in identifying the Areas to Watch have also assessed the potential risk
attached to the Areas to Watch (new and previously reported) that they supply
to this report. This report presents
the Risk Assessment Score. Risk
Assessment Score = Impact of the Area to Watch happening or continuing x
Likelihood of the Area to Watch happening or continuing. Both the Impact and Likelihood are
individually assessed with a score from 1-4:
Scoring the Impact & Likelihood for each Area to Watch involves
applying a value of between 1 and 4, with four representing the worst possible
case. 1=low impact, 2 medium, 3 high and 4= very high. The highest score should be for those top
level Areas to Watch likely to affect the future CPA score.
For example
– Insufficient Highway Maintenance Budget = Risk Score = 16 (impact =4 x
likelihood=4)
QUARTER
REPORTED |
KEY
AREAS TO WATCH |
PROPOSED
ACTION |
RISK
ASSESSMENT |
Q2/Q3/Q4 2003-04 Q1/Q2 2004-05 |
Insufficient Highway Maintenance budget. |
Private Finance Initiative progressing with ”Expression of
Interest” about to be sent to Government for decision |
Risk
Score = 16 Impact 4
Likelihood 4 |
Q4 2003-04 Q1/Q2 2004-05 |
Retention of Fire Control Staff during transitional
period. |
Awaiting detailed guidance from the Regional Management
Board (before March 2005) |
Risk
Score = 16 Impact 4
Likelihood 4 |
NEW Q2
2004-05 |
Progress on E-Government |
An
updated e-government strategy and action plan is being drafted. The GAGS
programme board has tasked the Head of Organisational Development with
reviewing all of the ODPM targets by the end of November. Actions on the services identified will
feed through in future QPMR reports |
Risk
Score = 16 Impact 4
Likelihood 4 |
Q4 2003-04 Q1/Q2 2004-05 |
The delivery of FAIRMaP within available/required
resources (Fire & Rescue) |
Integrated Personnel Development System Progress Group to
report to Executive November 2004.
Best Value Team to prioritise all other Service Plan bids |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q1/Q2
2004-05 |
Fire Service Pay & Conditions Agreement. Local
verification report phase 2 |
Action Plan approved by Executive 6 October 2004 Update
report to Select Committee 18 October 2004 |
Risk
Score = 12 Impact 4
Likelihood 3 |
NEW Q2 2004-05 |
Impact of Regional Management Board constitutional changes
|
The Regional Management Board will be considering its
constitution on 21 October 2004.
Chief Officers will be reviewing the constitution in light of this
meeting |
Risk
Score = 12 Impact 3
Likelihood 4 |
NEW Q2 2004-05 |
Retained Duty System Conditions of Service – Hours of duty |
Report to Executive in January 2005 Corporate Policy Unit to undertake consultation process |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
The Council’s licence to hold
public records is due for renewal, having previously been renewed on a
temporary basis |
Members
of the Task Group have completed a visioning exercise for the development of
a new storage facility and independent advice received as to how to take
forward the development planning process. |
Risk Score = 12 Impact 4 Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Educational Performance of Looked After Children |
Action ongoing as defined in the DfES/OFSTED LEA and
LEA/Local Learning Skills Council 14-19 Area Review action plans. |
Risk
Score = 12 Impact 4
Likelihood 3 |
Additional member of teaching staff to Looked After
Children Education Service (LACES) appointed. New LACES co-ordinator –
reconfiguration of the team, which will work to actively improve the
performance of targeted, looked after children. |
|||
Support
Social Services Looked After Children Action Plan and implementation of
individual student Personal Education Plans (PEP) |
|||
Specification of LACES being revised, to offer more
targeted support to Yrs 10 & 11.
Additional support to foster carers, to help them with task of
improving educational attainments. |
|||
NEW Q2
2004-05 |
Non achievement of quarterly
targets for Key Performance Indicators and PSA – approximately 30% missed
target |
Investigation into the non achievement of quarterly
targets, in particular the 7 indicators for Adult & Community Services
(50%) the 4 indicators for Resources (28.6%) and 2 for Children’s Services
(28.6%) |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q1/Q2
2004-05 |
Homelessness - Failure to reach target to reduce homeless
presentations by 25% in 2004/5. |
Homelessness acceptances have reduced and stabilised over
the last quarter. This suggests that
the prevention measures currently put in place are starting to work |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
School
performance at Key Stage 2,3 and 4 in Summer 2004 |
The School Cluster Initiative is having a positive impact
and was reported to Children’s Services Select Committee on 21 September
2004. Improvements seen at Key Stage 2 in 2004. Significant work still to do
at Key Stage 4 GCSE. |
Risk Score = 9 Impact 3 Likelihood 3 |
NEW Q2 2004-05 |
Performance of Children & Families Team, in light of
additional responsibilities assumed following review of Referral &
Assessment Team. |
Improved management scrutiny in place and workload
management system revising business processes and systems. Strengthened staffing resources making
team better placed to meet additional core demands. |
Risk Score = 9 Impact 3 Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
Downturn in burial numbers has continued, with
resultant deficit in Bereavement Services income |
Portfolio Holder and Task Group briefed. Grounds maintenance costs to be reduced
e.g. by reducing specification. Above
inflation fee increases likely in 2005/6. Evidence that average life span is
increasing. A modest reduction in
deaths has a major impact on Bereavement Services income |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
An increasing mismatch between the number of planning
applications being received and staff levels. |
Consultants are being sought to offer some degree of
short-term relief to this situation.
Staff elsewhere in the Service are already being used more flexibly to
assist the situation. It is likely that the submission of major applications
will intensify in Q3 and Q4 |
Risk Score = 9 Impact 3 Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Demand on the ICT Department
currently exceeds capacity in the areas of - Database Management, Risk
Management, Staff Training, Information Management and Project Support |
Directors / Executive to be aware and to take into account
during decision making processes Strategic partnering being investigated as a
possible way of increasing capacity.
Outline Business Case due November |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
ICT business continuity / disaster recovery |
Recruitment of ICT Security Manager in Progress. |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q1/Q2/Q3/Q4 2003-04 Q2
2004-05 |
The
number of staff absences due to sickness |
Marginal decrease in absence but need for line managers to
continue regular monitoring and application of policies |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q2
2004-05 |
Need
to consider potential impact changes to pension regulations on ability to
manage ‘rightsizing’, the older worker and careers of younger employees |
Changes to scheme not yet promulgated (laid before
Parliament) but assessment required when changes to Local Government Pension
Scheme are confirmed and Workforce Plan available. |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q2/Q3/Q4 2003-04 Q1/Q2
2004-05 |
Delays in funding the Land and Property Gazetteer and the
CRM project will mean that these projects miss their planned implementation
dates. |
Project on hold due to lack of funding. Alternative
approach being considered by Information Management Group. |
Risk
Score = 9 Impact 3
Likelihood 3 |
1.3
Performance
Summary :– Performance Indicators
The summary provides information for all of the Key
Performance Indicator Targets and Local Public Service Agreement (PSA) Targets
by Portfolio for 2004-05
This table presents a summary of 79 Performance
Indicators by type and by Portfolio, as drawn from the:
PORTFOLIO
|
No. of Indicators |
Target Achieved |
WITHIN 5% TARGET |
Target Not Achieved |
NO
INFO
|
ADULT & COMMUNITY SERVICES |
11 |
3 = (27%) |
1 = (9%) |
7 = (64%) |
0 |
CHILDREN’S SERVICES |
4 |
2 = (50%) |
0 |
1 = (25%) |
1 (25%) Annual
exam results |
ECONOMIC DEVELOPMENT UK & EU
REGIONAL ISSUES |
3 |
2 = (67%) |
0 |
1 = (33%) |
0 |
FIRE, EMERGENCY PLANNING &
CONSUMER PROTECTION |
8 |
5 = (62%) |
1 = (13%) |
2 = (25%) |
0 |
TRANSPORT |
4 |
4 =
(100%) |
0 |
0 |
0 |
SUSTAINABLE DEVELOPMENT,
ENVIRONMENT & PLANNING POLICY |
14 |
8 = (57%) |
0 |
3 =
(21.5%) |
3 =
(21.5%) these
have no targets |
TOURISM & LEISURE |
10 |
7 = (70%) |
0 |
2 = (20%) |
1 = (10%)
no data |
RESOURCES |
13 |
7 =
(54%) |
2 =
(15%) |
4 =
(31%) |
0 |
TOTAL |
67 |
38 (57%) |
4 (6%) |
20 (30%) |
5 (7%) |
PSA Targets by Portfolio – QUARTERLY ACHIEVEMENT OF TARGETS
PORTFOLIO
|
PSA Targets |
Target Achieved |
WITHIN 5% TARGET |
Target Not Achieved |
No
Info
|
ADULT & COMMUNITY SERVICES |
3 |
3 =
(100%) |
0 |
0 |
0 |
CHILDREN’S SERVICES |
3 |
0 |
2 = (67%) |
1 = (33%) |
0 |
ECONOMIC DEVELOPMENT UK & EU
REGIONAL ISSUES |
2 |
1 = (50%) |
0 |
1 = (50%) |
0 |
FIRE, EMERGENCY PLANNING &
CONSUMER PROTECTION |
2 |
2 =
(100%) |
0 |
0 |
0 |
TRANSPORT |
1 |
1 =
(100%) |
0 |
0 |
0 |
SUSTAINABLE DEVELOPMENT,
ENVIRONMENT & PLANNING POLICY |
- |
- |
- |
- |
- |
TOURISM & LEISURE |
- |
- |
- |
- |
- |
RESOURCES |
1 |
0 |
0 |
- |
1 =
(100%) ANNUAL
TARGET |
TOTAL |
12 |
7 (58%) |
2 (17%) |
2 (17%) |
1 (8%) |
1.3.1
Corporate
Actions - Annual
Action Statement Actions – 6 monthly progress on the actions as of the 30
September 2004
|
actions to be achieved by 31st March 2005 |
ACTIONS
Achieved
|
ACTIONS
ON-GOING INTO Q3 & Q4
|
ACTIONS
NOT STARTED
|
NO
INFO
|
Annual Action Statement Actions
|
105 |
19 |
64 |
5 |
17 |
1.4 Priority Improvement Areas
·
Engineering Services – Highways - The
PIA meeting held in September highlighted Service areas where a significant
increase in budget is fundamental to secure improvements in service
delivery. Areas of performance around
road and traffic accidents will be investigated further with support from the
Corporate Policy Unit. The PFI is being
progressed with “Expression of Interest” about to be sent to Government outlining
our initial business case, Council wide support will be necessary for it to be
achieved and successful. A shortfall in
the highway inspection regime is being remedied by reorganisation and
employment of an additional member of staff.
·
Planning Services - The
meeting held in September made useful progress in identifying the role that the
PIA will play in securing corporate support for the service. A report will be submitted to the Executive
shortly on this matter. The Planning
PIA Group has monitored improvements against the Best Value Improvement
Plan. The detailed issue of staffing
levels in Development Control was discussed at the last PIA meeting. Currently there is a mismatch between the
increasing numbers of planning applications and the available staff to process
them.
·
School
Performance - The first meeting of this PIA was held in September
and discussions took place on school performance in respect of pupil
achievement has shown improvement in three out of five areas on the 2004
results, with one area sustaining the significant improvement of KS3. KS4 GCSE
performance remains unsatisfactory with no overall gain on that of 2003 and a
widening gap to our national and statistical neighbour positions. Discussion has taken place with all High School
headteachers on the GCSE performance and targets and an action plan has been
agreed to impact upon and significantly improve performance in 2005 and 2006.
The cohort of pupils in the current GCSE year (Year 11 in High Schools)
achieved the best prior attainment scores for the Authority at all the previous
national tests points. A detailed analysis of school performance will be
presented to Select Committee when the current provisional results are
confirmed. The PIA group has outlined
an Action Plan that includes the presentations of the High School’s initiative
to the next PIA meeting in January 2005.
·
Fire
& Rescue - The
Fire and Rescue Service is working with the Policy Unit to progress a pilot
self-assessment for Corporate Performance Assessment (CPA). This will be subject to Peer Review by
January 2005 and will inform those areas requiring improvement prior to full
CPA in April 2005.
1.5
Best Value Reviews
1.6 Financial Performance Summary
Revenue Expenditure - A summarised list of revenue
expenditure by Portfolio is shown in section 3.1. In addition, summary revenue
budget information is displayed by Portfolio in Sections 2.1 to 2.8. Although
the table in section 3.2 shows that only 41.8% of the budget has actually been
spent by 30 September, the figure does exclude commitments, capital financing
charges, support service recharges and other adjustments. Consequently, after
adjusting for the impact of those, revenue spending in the first half of the
financial year is assessed to be broadly in line with budget expectations.
However, potential budget pressure areas have been identified, some of which
also represent possible budget problems for future years:
·
ICT have a number of ongoing projects, particularly
related to E-government, which are funded partly from grants and reserves – the
ongoing implications of these projects need to be regularly evaluated to ensure
budgets are in place to allow their continuation at an appropriate level.
·
Engineering Services have a predicted under-recovery of
income of £40,000 on Ventnor Haven which requires an ongoing solution. In
addition, income expectations on the car parking budget have been increased to
accommodate additional subsidised bus routes and the increased concessionary
fares budget. However, income recovery to date is estimated to be some £60,000
short of the target for the time of year. There are also potential budget pressures
of £250,000 on highway and pavement maintenance, much of which will be
addressed by charging structural maintenance to capital once contracts have
been finalised.
·
Bereavement Services income is currently lower than
anticipated and seems likely to fall short of the target figure at the year end
by £95,000
·
Budget pressures within Housing Services are currently
anticipated to result in an overspend of £42,600 at the year end. Main area of
concern is homelessness.
·
Adult services budgets, in particular Community Care,
remains an area to be monitored closely, current overspend by the year end
anticipated to be £35,600.
·
Community Development budgets are another area
experiencing problems with income generation, downturns in income expectations
at Dinosaur Isle, Ryde Theatre and in the Libraries budget mean that by the
year end an under-recovery of income of £70,000 is predicted.
·
Wight Leisure operations have seen a reduction in
casual income mirrored by an increase in use of the One Card scheme. However,
as with other budget areas, seasonal income appears to have been reduced due to
the relatively poor weather in the summer months and other changes in the
external operating environment may be having an adverse effect on income
targets.
The most significant areas of activity to date are Schools
Devolved Budgets and Standards Fund (£2,500,000), Primary and Middle Schools
LEA Projects (£1,375,000), Adult Services Client Database System (£630,000) and
Castle Haven Coast Protection Scheme (£1,925,000).
In addition to the above, Engineering Services are making
progress with initial design and other processes necessary to obtain the
statutory approvals for major projects at Undercliff Drive and Ryde
Interchange. It is now anticipated that
works at Undercliff Drive will commence later in this financial year. A project engineer has been appointed to commence
work on the preliminary design stages of the Ryde Interchange project and a
budget identified to allow this work to be taken forward to planning approval
stage. Work on the scheme is
anticipated to commence next financial year.
SECTION 2 : PERFORMANCE
MANAGEMENT & ASSESSMENT – BY PORTFOLIO
2.1 PORTFOLIO:
ADULT
& COMMUNITY SERVICES
CORPORATE
OBJECTIVE Improving
health, housing & the quality of life
Key Achievements Quarter 2 – 2004-05 |
The
island has one of the lowest rates of delay to hospital discharge in the
region, sustaining a zero rate for many weeks in the quarter. This low level
is sustainable and due to investment and partnership across the social care
and health economy. |
Introduction of new low interest loans scheme to assist
owners maintain their homes. |
Ventnor Botanic Garden has attracted £142,000 in external
funding to develop a new herb garden and also a Southern hemisphere garden. |
The junior sports challenge and children’s activity
programme at Medina Leisure Centre, held over the Summer holidays, had their
best ever levels of attendance, engaging over 2,600 young people in physical
activities. |
Areas to Watch –2004-05 |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
The Council’s licence to hold
public records is due for renewal, having previously been renewed on a
temporary basis |
Members
of the Task Group have completed a visioning exercise for the development of
a new storage facility and independent advice received as to how to take
forward the development planning process. |
Risk Score = 12 Impact 4 Likelihood 3 |
Q1/Q2
2004-05 |
Homelessness - Failure to reach target to reduce homeless
presentations by 25% in 2004/5. |
Homelessness acceptances have reduced and stabilised over
the last quarter. This suggests that
the prevention measures currently put in place are starting to work |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
Occupational Therapy Integration - Requirement to sign a
section31 agreement/ pooled budget for Hospital and Social Services-based
Occupational Therapists. Section 31
agreement still needs to be signed off to establish the pooled budgets |
Negotiations are taking place with the Primary Care Trust
and the Hospital Trust. Target date
for signing s31 by the end of the calendar year. |
Risk
Score = 6 Impact 2
Likelihood 3 |
NEW Q2 2004-05 |
The
Adult Protection Co-ordinator post has remained unfilled despite a national
recruitment exercise. The rapidly growing rates of referral involving adult
protection are creating pressures on the staff and services that respond to
adult protection needs. |
Following
analysis by the directorate and HR of the reasons why those expressing an
interest did not apply, the post has been changed and will now be advertised
at Service Manager level. |
Risk Score = 6 Impact 3 Likelihood 2 |
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
NEW Q2 2004-05 |
The
take-up of Direct Payments is a key indicator in the annual assessment of
the functioning of Adult Services. The take-up has been affected by a
‘drop-out’ rate which is higher than expected. This could undermine the
reaching of the councils target for take-up. |
The
directorate is investigating why service users have dropped out of Direct
payments with a view to taking action to limit future drop-out. A
partnership with the Riverside Centre will improve the support of applicants
and those on direct payments. |
Risk Score = 6 Impact 2 Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Community Development Budget
Issues – Dinosaur Isle & Ryde/Shanklin Theatres |
·
Dinosaur Isle income for the period has not
reached expectations and management plans are being developed to reduce
expenditure to compensate. |
Risk
Score = 6 Impact 3
Likelihood 2 |
·
Income at Ryde Theatre is currently below
expectation as the programme was reduced temporarily on account of a number
of noise complaints. These matters
are being addressed & it is hoped that a full winter programme will
recover the current income deficit. |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
|||||
Improving
the availability of affordable housing |
1. Homeless households accepted this quarter – The number
of applicants accepted as priority homeless under the Homelessness Act (Local
Indicator) |
92 |
74 |
|
|
300 |
Homeless
Households - The effects of piloting a new procedure on only accepting court
orders as proof of homelessness have yet to fully take effect. This is due to
the legal processes of the Courts. |
(71) |
(67) |
(76) |
(86) |
||||
î |
è |
|
|
391 |
|||
2. The number of Social Housing properties let
this quarter (Local Indicator) |
105 |
87 |
|
|
450 |
Social Housing - This figure is reliant on
Housing Association properties being relet and does not take into
consideration transfers between properties which have a neutral effect. |
|
(112) |
(113) |
(112) |
(113) |
||||
î |
î |
|
|
NA |
|||
3.
Affordable Housing – the number of affordable housing units built this
quarter (Local Indicator) |
11 |
11 |
|
|
150 (62 actual) |
Development
handover of 20 units will take place one month later than expected and will
be accounted for in the next quarter results. |
|
(11) |
(31) |
(2) |
(18) |
||||
ì |
î |
|
|
81 |
|||
Improving
health, housing & the quality of life for all |
4. The actual number of people on the IOW who are
using the Direct Payments Scheme to choose and arrange their own social care
services (Local Indicator) |
45 |
52 |
|
|
175 |
The
directorate is investigating why service users have dropped out of Direct
payments with a view to taking action to limit future drop-out. A partnership with the Riverside Centre
will improve the support of applicants and those on direct payments. |
(44) |
(75) |
(120) |
(175) |
||||
ì |
î |
|
|
47 |
|||
Promoting
community learning |
5. Number
of physical visits per 1,000 population to public library premises (BVPI 117) |
1,923 |
2,134 |
|
|
7,000 |
Visits have exceeded the target figure, and are currently
on track to rise by over 10% over the year.
People’s Network has contributed to the rise in visitors |
(1,750) |
(1,950) |
(1,450) |
(1,850) |
||||
ì |
ì |
|
|
7,040 |
|||
6. Number
of internet & telephone renewals & reservations this quarter (Local Indicator) |
15,557 |
15,575 |
|
|
62,000 |
Figures for Q1 have been identified retrospectively
because ICT system failures prevented statistics being delivered on time. Q1-25% of all such services are electronic Q2-26.3% of all services are electronic Target is based on Q1 figures, which were the first to be
compiled. |
|
(15,500) |
(15,500) |
(15,500) |
(15,500) |
||||
ì |
ì |
|
|
- |
|||
7. Number
of users of the Mobile Library Service (including housebound service) this
quarter (Local
Indicator) |
3,281 |
3,705 |
|
|
16,500 |
Visitor numbers are down on last year’s figures, primarily
because of unplanned closures.
Because of driver shortage, 25 days service were missed over the first
quarter, and 12 in the second quarter |
|
(4,125) |
(4,125) |
(4,125) |
(4,125) |
||||
î |
î |
|
|
NA |
|||
8a. The
number of visits to, usages of museums per 1,000 population compared with the
same quarter a year ago (BVPI 170a) |
213 |
315 |
|
|
750 |
The actual number of visits/usages in the 2nd
quarter was 41,864, against an anticipated target of 45,850. . |
|
(225) |
(345) |
(112) |
(68) |
||||
è |
î |
|
|
744 |
|||
Promoting
community learning |
8b. The
number of visits to museums that were in person per 1,000 population compared
with the same quarter a year ago
(BVPI 170b) |
191 |
285 |
|
|
625 |
The actual number of visits in the 2nd quarter
was 37,906, against an anticipated target of 41,598. |
(187) |
(313) |
(81) |
(44) |
||||
ì |
î |
|
|
611 |
|||
8c.The
number of pupils visiting museums & galleries in organised school groups
compared with same quarter a year ago
(BVPI 170c) |
7,858 |
2,639 |
|
|
16,000 |
Non-island schools
appear to have been the area of most significant loss. It is difficult to determine the reasons,
given that current marketing strategies have been successful over a long
period. Existing users will be
consulted, to investigate the falling numbers |
|
(7,200) |
(3,680) |
(1,760) |
(2,560) |
||||
ì |
î |
|
|
15,969 |
|||
9. Number
of learners in IWC supported provision this quarter (IW College, Family
Learning Centres etc) Data will refer to previous school term rather than
calendar quarter (Local Indicator) |
732 |
560 |
|
|
1,980 |
Target has been exceeded this quarter. This is partly due to the success of a
pilot project ‘Neighbourhood Learning in Ventnor’ (funded via Learning &
Skills Council). |
|
(495) |
(495) |
(990) |
NIL |
||||
ì |
ì |
|
|
2,445 |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
|||
Improving
the health, housing and quality of life for all |
4.
Housing - Reduce the number of families with children & other households
in B&B accommodation |
5 |
13 |
|
|
13 |
The
target quarterly has been achieved.
The Service does expect fluctuations in the number of families in
B&B accommodation and this is reflected in the outturn figures |
(23) |
(20) |
(17) |
(13) |
||||
ì |
ì |
|
|
21 |
|||
5.
Social Services Rehabilitation
care for older people & a reduction in delay of discharges from hospital |
Nil return |
D41 – 3.9 C28 – 9.1 C26 - 109 |
|
|
D41
– 6 C28
– 10 C26
- 88 |
Quarter
2 – contains a peak demand for residential and nursing care (July). D41 = Delayed transfers of care from
hospital, there were approximately 4 delayed. C28 = Intensive Home Care
Treatment, the quarterly target has been achieved. C26 = Admission of supported residents aged 65yrs or over to
residential or nursing care the actual number has exceeded the target. |
|
(D41 – 6) (C28 – 10) (C26 – 88) |
(D41 – 6) (C28 – 10) (C26 – 88) |
(D41 – 6) (C28 – 10) (C26 – 88) |
(D41 – 6) (C28 – 10) (C26 – 88) |
D41
– 0 C28
– 7.36 C26
- 96 |
|||
|
ì |
|
|
||||
7.
Increase the number of young people who are getting treatment for drug or
alcohol dependency (Drug Action Team) |
24 |
54 |
|
|
852 by 31
March 2006 |
The
project has continued to meet the targets set for the project and has now
achieved 78 young people receiving treatment for the year. 767 over the past two years of the project
(90% of the PSA target) |
|
(852) |
(852) |
(852) |
(852) |
||||
ì |
ì |
|
|
689 total |
2.2 PORTFOLIO: CHILDREN’S
SERVICES
CORPORATE OBJECTIVE: Raising education standards &
promoting life long learning
Key Achievements Quarter 2 – 2004-05 |
Significant improvement in 2004 pupil achievement in the
national tests for eleven year olds in English and mathematics. LEA in the
top ten of improved Authorities. Council congratulated by Schools’ Minister
David Milliband. |
Successful fresh start of Totland Primary School now
Weston Community School. Significant development pupil numbers now rising. |
Implementation of fixed penalty notice scheme for truancy
and absence from school. |
Completion of the first phase of consultation on School
Organisation. 18 meetings presented with key issues for the Education
Service. Consultation feedback summarised in report to the Executive
(06/10/04) |
All students who completed forms correctly and returned
them on time have had their applications for Students Loans processed. This
is against a backdrop of considerable problems in the introduction of a new
National System based on a computerised process that malfunctioned
frequently. |
Successful appointment of Head of Children’s Services and
launch of the new Children’s Services Directorate, involving 223 members of
staff in a comprehensive consultation exercise about future direction. |
Revised and amended remit and business processes of the
Referral & Assessment Team, to ensure a more focused service. This has led to improved timeliness of
assessments, which will improve outcomes for children and families. |
Areas to watch – 2004-05 |
||||||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
|||
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Educational Performance of Looked After Children |
Action ongoing as defined in the DfES/OFSTED LEA and
LEA/Local Learning Skills Council 14-19 Area Review action plans. |
Risk
Score = 12 Impact 4
Likelihood 3 |
|||
Additional member of teaching staff to Looked After
Children Education Strategy (LACES) appointed. New LACES co-ordinator –
reconfiguration of the team, which will work to actively improve the
performance of targeted, looked after children. |
||||||
Support
Social Services Looked After Children Action Plan and implementation of
individual student Personal Education Plans (PEP) |
||||||
Appointed permanent PEP co-ordinator to maintain
improvements in PEP completion & quality. Specification of LACES being revised, to offer more targeted
support to Yrs 10 & 11. Additional support to foster carers, to help them with
task of improving educational attainments.
|
||||||
2004 cohort=18 |
1 or more GCSE (A*-C)
33.3% 5 or more GCSE (A*-C)
11% 1 or more GCSE (A*-G)
55.5% 5 or
more GCSE (A*-G) 39% |
2003 cohort=7 |
1 or more GCSE (A*-C)
42% 5 or more GCSE (A*-C)
14% 1 or more GCSE (A*-G)
42% 5 or more GCSE (A*-G)
42% |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
|||
Q4
2003-04 Q1/Q2
2004-05 |
School
performance at Key Stage 2,3 and 4 in Summer 2004 |
The School Cluster Initiative is having a positive impact
and was reported to Children’s Services Select Committee on 21 September
2004. Improvements seen at Key Stage 2 in 2004. Significant work still to do
at Key Stage 4 GCSE. |
Risk Score = 9 Impact 3 Likelihood 3 |
|||
NEW Q2 2004-05 |
Performance of Children & Families Team, in light of
additional responsibilities assumed following review of Referral &
Assessment Team. |
Improved management scrutiny in place and workload
management system revising business processes and systems. Strengthened staffing resources making
team better placed to meet additional core demands. |
Risk Score = 9 Impact 3 Likelihood 3 |
|||
NEW Q2 2004-05 |
Pupil achievement for fifteen year olds at GCSE Key Stage
4. |
Action ongoing as defined in the DfES/OFSTED LEA and
LEA/LLSC 14-19 Area Review action plans. |
Risk Score = 8 Impact 4 Likelihood 2 |
|||
NEW Q2 2004-05 |
Continued rise in fixed term exclusions – Fixed term
exclusions are periods when children are not allowed on school premises |
Annual report to schools to be sent out, with follow up
work directed at schools with known issues with fixed term exclusions. |
Risk Score = 6 Impact 2 Likelihood 3 |
|||
Q4
2003-04 Q1/Q2
2004-05 |
Dealing with young people with challenging
behaviour including those with Attention Deficit Hyperactivity Disorder |
Children Adolescent Mental Health Service (CAMHS)
consulting & operational body have been set up. Resources have been increased. Audit of need completed & being
analysed. Operational posts
increased. Intensive support service in place. Pilot project for tiers 1 & 2 being designed. |
Risk Score = 6
Impact 3 Likelihood 2 |
|||
PERFORMANCE MANAGEMENT INFORMATION –
KEY PERFORMANCE INDICATORS
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
|
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
||||||
Raising
achievement levels |
1.
Percentage of 15 year old pupils in schools maintained by the local education
authority achieving five or more GCSEs at grades A*-C or equivalent.. (BVPI 38) |
|
51% |
This is
an annual performance indicator. New
results will be published in quarter 3 report. Educational achievement is a
new PIA and an Action Plan will be developed in due course |
||||
44.8% |
||||||||
2.
Percentage of half days missed this quarter due to total absence in secondary
schools maintained by the local education authority (BVPI 45) |
7.66% |
7.5% |
|
|
7% |
Trend
encouraging but problems with two High School systems means that data is
incomplete. New Attendance module being installed in all schools will make
accuracy & completeness much more reliable. Of the total absences 6.17% (6.93%
England average) due to authorised absence and 1.33% (1.14% England average) due
to unauthorised absence |
||
(7%) |
(7%) |
(7%) |
(7%) |
|||||
î |
î |
|
|
7.9% |
||||
Protecting and providing for vulnerable adults &
children |
3. The number of looked after children per 1,000 less than
18yrs at end of quarter (Local
Indicator) |
5.87 |
5.79 |
|
|
5.7 |
Tight
scrutiny of this indicator has led to it staying on target |
|
(6.0) |
(5.9) |
(5.8) |
(5.7) |
|||||
ì |
ì |
|
|
6.05 |
||||
4. The
number of looked after foster care children placed on the mainland excluding
placed for adoption and with family/friends (Local Indicator) |
18 |
18 |
|
|
17 |
On-going
scrutiny has maintained this target at a reasonable level * Please
note that the quarterly targets for this indicator have been increased to set
a more reasonable target and expectation for the Service |
||
(22) |
(20) |
(19) |
(17) |
|||||
ì |
ì |
|
|
22 |
||||
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
||||||||
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
|||||||||||
Raising
Education Standards & Promoting Lifelong Learning |
1. Education - Key Stage 3 – raise achievement
levels by 2% above target in the Development Plan by 2006 |
English N/A Maths 69%
Science 63% ICT N/A (English
72%) (Math 74%) (Science 71%) (ICT 74%) |
English 72% Math 74% Science 71% ICT 74% |
All figures are provisional
for 2004. ICT data is not yet
available from the DfES. English data
is flawed and is currently subject to a national remark. The fall back in
Science is the result of a level mismatch within the national KS3 paper. Math has increased slightly on last year,
but is 5% below target score |
|||||||||||
è |
English 65% Maths 68% Science 69% ICT 72% |
||||||||||||||
2. Education - Number of adults participating in and
obtaining skills to raise achievement of 7 & 11 year olds by 2% in
schools of significant disadvantage by providing family literacy support
& improving adults basic skills |
No.s = 148 Gaining skills = 83 |
No.s = 148 Gaining skills = 83 |
|
|
No.s = 110 Gaining skills 90 |
Numbers participating is above the quarterly target
figure, however the number of adults obtaining skills is just below the
target |
|||||||||
(No.s = 110) (Gaining skills = 90) |
(No.s = 110) (Gaining skills = 90) |
(No.s = 110) (Gaining skills = 90) |
(No.s = 110) (Gaining skills = 90) |
No.s 148 Gaining skills 83 |
|||||||||||
è |
è |
|
|
||||||||||||
6. Improve the education & employment outcomes
of care leavers aged 19yrs |
A4 – 53% QP8 – 0% |
A4 – 61% QP8 – 32.5% |
|
|
A4 – 58% QP8 – 52% |
|
|||||||||
(A4 – 58%) (QP8 – 52%) |
(A4 – 58%) (QP8 – 52%) |
(A4 – 58%) (QP8 – 52%) |
(A4 – 58%) (QP8 – 52%) |
||||||||||||
î |
î |
|
|
|
|||||||||||
2.3 PORTFOLIO
: ECONOMIC
DEVELOPMENT, UK & EU REGIONAL ISSUES
Corporate Objective : Encourage job creation &
economic prosperity
Key Achievements Quarter 2 – 2004-05 |
Island Branding Strategy – Support for Shirley Robertson
and crew under “team Isle of Wight” has reaped a massive return on
investment in terms of promoting the Isle of Wight. |
SRB for Ryde - Delivery Plan for 2004/05 has been agreed
and signed by SEEDA, who have also approved Ryde Town Improvements project
which will encompass the Public Realm Strategy work. |
Area Investment Framework (AIF) – the final copy of the
Performance Plan now submitted to SEEDA and the contract is due for
signing. Draft 3 year funding
proposal for SEEDA’s direct and devolved funding has also been submitted |
Cowes Waterfront – Stage 2 of the East Cowes master-plan
is being completed and public consultation was held in East Cowes Town Hall
on the 17-18 September |
Areas to watch – 2004-05 |
Risk
Assessment |
||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Score =
Impact x Likelihood |
Q1/Q2 2004-05 |
PSA Target 11 (Over 50’s into employment) -
Negotiations are yet to be concluded between the IW Council the Isle
of Wight Economic Partnership and the Office of the Deputy Prime Minister to
determine the future deliverability of this target |
Work on this target has been on
hold while issues concerning the target definitions have been investigated
with the Council and the ODPM. This continues as of today, but, in parallel
to these negotiations, the IWEP is setting up a dedicated team to fully
evaluate this target with a view of identifying a programme of work with a
realistic view on possible outcomes (due by January 2005) |
Risk Score = 4 Impact 2 Likelihood 2 |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- Jun (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004/05 |
Comments |
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
|||||
Ensuring
all residents are able to share in improving prosperity |
1a. The
total number of claimants (Job Seekers Allowance) this quarter (Local
Indicator) |
5,020
|
4,489 |
|
|
5163 per ¼ |
The quarter has seen a continued
fall in the total number of claimants this quarter, 576 less compared with Q2
2003/4 Average = 1,496 per month |
(5,163) |
(5,163) |
(5,163) |
(5,163) |
||||
ì |
ì |
|
|
5,859 per ¼ |
|||
1b. The
total number of youth claimants (Job Seekers Allowance) aged 18-24 years this
quarter (Local Indicator) |
1,313 |
1,145 |
|
|
1296 per ¼ |
The quarterly target has been achieved, 50 less
youth claimants compared with Q2 2003/4 Average 382 youth claimants per month |
|
(1,296) |
(1,296) |
(1,296) |
(1,296) |
||||
è |
ì |
|
|
1,470 per ¼ |
|||
1c. The
total number of long-term claimants (Job Seekers Allowance) this quarter (Local
Indicator) |
853 |
760 |
|
|
681 per ¼ (13.4%) |
16.9% of all claimants are now long term
unemployed. There has been a small fall (7.3%) in the figures
from last year = 60 less long-term claimants compared with Q2 2003/4 |
|
(681) |
(681) |
(681) |
(681) |
||||
î |
î |
|
|
855 per ¼ |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators.
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
|||
Encouraging Job Creation & Economic Prosperity |
3a - Employment Create 400 new jobs over 3 years (1 April 03 -31
March 06) via IW Economic Partnership activities |
25 |
5 |
|
|
400 by
31-03-06 |
30 jobs
have been created for this year. In
total since the 1 April 2003 356 jobs have been created (90% of target). The
outturn figure for quarter one has been adjusted upwards to reflect
additional jobs created. Jobs have
been created at the Cowes Waterfront and the Innovation Centre. PSA Target is
to secure 100 additional jobs for the Island, over the 300 expected by the
IWEP |
(400) |
(400) |
(400) |
(400) |
326 |
|||
ì |
ì |
|
|
||||
3b - Establish 21 new businesses over 3 years (1
April 03 – 31 March 06) via the activities of the IW Economic Partnership |
2 |
1 |
|
|
21 by 31-03-04 |
One business has been established through the
activities of the IWEP. To date the
Partnership has assisted 12 companies since 1 April 2003 (57% of target). PSA Target is to secure 6 additional or
expanding businesses for the Island, over the 15 expected by IWEP |
|
(21) |
(21) |
(21) |
(21) |
||||
ì |
ì |
|
|
9 |
|||
11 Unemployment Increase the employment rates in the over 50’s age
group, 120 people returned to work – who have been unemployed for 6 months or
more (via IW Economic Partnership) |
0 |
0 |
|
|
50 |
Work on
this target has been on hold while issues concerning the target definitions
have been investigated with the Council and the ODPM. This continues as of
today, but, in parallel to these negotiations, the IWEP is setting up a
dedicated team to fully evaluate this target with a view of identifying a
programme of work with a realistic view on possible outcomes. Once this has
been done, a decision on the way forward will be taken. It is anticipated
this review will be completed by the end of October. |
|
(10) |
(15) |
(10) |
(15) |
||||
î |
î |
|
|
14 |
2.4 PORTFOLIO: Fire, Emergency Planning & Consumer
Protection
CORPORATE OBJECTIVES: Creating
Safe & Crime-Free Communities
Key Achievements Quarter 2 – 2004-05 |
Fire and Rescue Service Round Table established with
Members, Officers and Union Representation |
Draft Licensing Policy agreed and is out for
consultation, it is to be presented to Council in December for approval (new alcohol legislation) |
Open day held at the Crematorium in August, well attended
by general public |
Areas to watch – 2004-05 |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
Q4
2003-04 Q1
2004-05 |
Retention of Fire Control Staff during
transitional period. |
Awaiting detailed guidance from the Regional Management
Board (before March 2005) |
Risk
Score = 16 Impact 4
Likelihood 4 |
Q4
2003-04 Q1
2004-05 |
The delivery of FAIRMaP within
available/required resources (Fire & Rescue) |
Integrated Personnel Development System Progress Group to
report to Executive November 2004. Best Value Team to prioritise all other
Service Plan bids |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q1/Q2
2004-05 |
Fire Service Pay & Conditions Agreement. Local
verification report phase 2. |
Action Plan approved by Executive 6 October 2004 Update
report to Select Committee 18 October 2004.
Chief Officers will be reviewing the constitution in light of this
meeting |
Risk
Score = 12 Impact 4
Likelihood 3 |
NEW Q2 2004-05 |
Impact of Regional Management Board constitutional
changes |
The Regional Management Board will be considering its
constitution on 21 October 2004 |
Risk
Score = 12 Impact 3
Likelihood 4 |
NEW Q2 2004-05 |
Retained Duty System Conditions of Service – Hours of
duty |
Report to Executive in January 2005 Corporate Policy Unit to undertake consultation process |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q4 2003-04 Q1 2004-05 |
Downturn in burial numbers has continued,
with resultant deficit in Bereavement Services income |
Portfolio Holder and Task Group briefed. Grounds maintenance costs to be reduced
e.g. by reducing specification.
Above inflation fee increases likely in 2005/6. Evidence that average
life span is increasing. A modest
reduction in deaths has a major impact on Bereavement Services income |
Risk
Score = 9 Impact 3
Likelihood 3 |
NEW Q2 2004-05 |
Draft Licensing Policy must be adopted by Full Council by
7 January 2005. |
Item in Forward Plan to present to December meeting of
Full Council. |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q1 2004-05 |
Need to work with coroner to manage expenditure in
relation to sudden deaths. |
Meeting with Coroner held. Plans for Fire & Public Safety Select Committee to hold
scrutiny session in November.
Proposals being developed to put sudden death transfer arrangements
out to tender. |
Risk
Score = 4 Impact 2
Likelihood 2 |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
|
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
||||||
Cutting crime, disorder, and fear of crime |
1. Domestic
burglaries this quarter per 1000 households (BVPI 126) |
0.97 |
1.17 |
|
|
7.64 |
Due to
the high priority placed on House Burglary by the IoW Burglary Crime Unit the
offenders have been targeted with good results so far, a reduction of 38.7%. |
|
(1.91) |
(1.91) |
(1.91) |
(1.91) |
|||||
ì |
ì |
|
|
7.4 |
||||
Supporting a locally controlled fire service |
2. % of incidents where the number of appliances met
standards of fire cover. (BVPI 145a) |
100% |
100% |
|
|
99% |
Quarterly
target has been achieved 153 instances and the number of appliances was met
in each case. |
|
(99%) |
(99%) |
(99%) |
(99%) |
|||||
ì |
ì |
|
|
99.2% |
||||
3. % of incidents where the number of riders met standards
of fire cover. (BVPI 145b) |
99.3% |
100% |
|
|
99% |
Quarterly
target has been achieved the number of riders was fully achieved in all
instances 153 out
of 153. |
||
(99%) |
(99%) |
(99%) |
(99%) |
|||||
ì |
ì |
|
|
98.6% |
||||
4.
% of incidents where attendance times met the standards of fire cover (BVPI 145c) |
90.4% |
90.3% |
|
|
90% |
The new
database gives more failures due to timing in seconds. Some failures due to
wholetime pump being on exercise/drill and out of position, taking it
slightly longer to attend. This cannot be avoided. |
||
(90%) |
(90%) |
(90%) |
(90%) |
|||||
ì |
ì |
|
|
94.3% |
||||
Safeguarding public welfare through our consumer
protection services |
5a. Score
against a checklist of enforcement best practice for: a)
Environmental
Health (BVPI 166a) |
50% |
50% |
|
|
80% |
Changes introduced to improve indicator (now including
licensing) due to take effect during Q3. |
|
(80%) |
(80%) |
(80%) |
(80%) |
|||||
î |
î |
|
|
83% |
||||
5b. Score
against a checklist of enforcement best practice for: b) Trading
Standards (BVPI 166b) |
76.3% |
76.3% |
|
|
77% |
Performance
broadly on target. |
||
(77%) |
(77%) |
(77%) |
(77%) |
|||||
è |
è |
|
|
71.3% |
||||
6. The number
of Trading Standards Inspections this quarter (Local Indicator) |
65 |
125 |
|
|
475 |
Vacant TSO post now filled (as of 1 June 2004). Target met. |
||
(100) |
(125) |
(125) |
(125) |
|||||
î |
ì |
|
|
458 |
||||
7. The
number of Food Hygiene Inspections this quarter (Local
Indicator) |
283 |
264 |
|
|
1150 |
Performance broadly on target. |
||
(285) |
(285) |
(285) |
(295) |
|||||
è |
î |
|
|
1136 |
||||
PERFORMANCE MANAGEMENT INFORMATION –
LOCAL PUBLIC SERVICE AGREEMENT TARGETS
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
|||
Creating Safe & Crime Free Communities |
8.
Crime Reduction Reduce the number of Domestic burglaries |
67 |
75 |
|
|
450 |
Due to
the high priority placed on House Burglary by the IoW Burglary Crime Unit the
offenders have been targeted with good results so far, a reduction of 38.7%. |
(112.5) |
(112.5) |
(112.5) |
(112.5) |
468 |
|||
ì |
ì |
|
|
||||
9. Fire
Safety Reduce
the number of accidental fires & casualties from them |
Calls – 26 Deaths -0 Injuries -
1 |
Calls – 15 Deaths -0 Injuries -
2 |
|
|
Calls -117.2 Deaths -0 Injuries -10.8 |
The Fire & Rescue Service has continued to meet
the stretch targets. |
|
(Calls
29.3) (Deaths 0) (Injuries
2.7) |
(Calls
29.3) (Deaths 0) (Injuries
2.7) |
(Calls
29.3) (Deaths 0) (Injuries
2.7) |
(Calls
29.3) (Deaths 0) (Injuries
2.7) |
Calls –
112 Deaths – 0 Injuries -
7 |
|||
ì |
ì |
|
|
2.5 PORTFOLIO:
Transport
CORPORATE
OBJECTIVE: Improving public transport
& the highways infrastructure
Key Achievements Quarter 2 – 2004-05 |
All-Party Parliamentary Cycling Group award (2004) for
one of the most improved highway authorities in England at implementing
measures to increase cycling. |
Successful visit to the Island by Junior Transport
Minister |
All performance indicators for Transport & Highways
(5 indicators) have achieved quarterly targets |
Areas to watch – previous quarters 2003-04 |
|||
Quarter
Reported |
Area to
Watch |
Action to
be taken |
Risk
Assessment |
Q2/Q3/Q4 2003-04 Q1/Q2
2004-05 |
Insufficient highway maintenance revenue budget.
Particular concerns regarding repairs due to summer clay shrinkage |
Private Finance Initiative progressing with ”Expression
of Interest” about to be sent to Government for decision |
Risk
Score = 16 Impact 4
Likelihood 4 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Under achievements on highway inspections. |
Inspection regime is being reorganised and a second
attempt is being made to recruit an additional Inspector. |
Risk
Score = 9 Impact 3
Likelihood 3 |
PERFORMANCE MANAGEMENT INFORMATION –
KEY PERFORMANCE INDICATORS
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
|||||
Maintaining
the highways infrastructure |
1. Percentage of incidents of reported dangerous damage to
roads & pavements this quarter made safe within 24 hours (Local Indicator) |
100% |
100% |
|
|
100% |
The
target has continued to be met and achieved |
(100%) |
(100%) |
(100%) |
(100%) |
||||
ì |
ì |
|
|
100% |
|||
2. Number of casualties
resulting from road traffic accidents on Island roads (one quarter in
arrears). (BVPI 99 – CPA) |
138 |
149 |
|
|
645 |
Between
April and June 2004 there were 149 casualties resulting from road traffic
accidents on Island roads, 6 below profile.
We are currently on target for year end. |
|
(136) |
(155) |
(186) |
(168) |
||||
è |
ì |
|
|
689 |
|||
3. Safety and the
condition of the highway network.
Measured by the reduction in insurance claims against the
authority. 2% reduction of claims
received compared with the same quarters in 2003-04 (Local Indicator) |
2.5% |
2727.8%.8 |
|
|
2% |
The
numbers of insurance claims for quarter 2 were significantly less than for
the same period last year. The
situation will be monitored by the Highways team. |
|
(2.0%) |
(2.0%) |
(2.0%) |
(2.0%) |
||||
ì |
ì |
|
|
NA |
|||
Promoting public transport |
4. Passenger journeys on Local bus services (data 1 quarter in arrears) (BVPI 102) |
1.2
m |
1.5 m |
|
|
5.7 million |
Between
April and June 2004 1,452,875 passenger journeys were made on Southern Vectis
buses. We are currently on target for
year end. |
(1.2
m) |
(1.4
m) |
(1.8 m) |
(1.3 m) |
||||
ì |
ì |
|
|
5.605 million |
PERFORMANCE MANAGEMENT INFORMATION –
LOCAL PUBLIC SERVICE AGREEMENT TARGETS
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
|||||||||||
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
||||||||||||||
Transport |
10.
Transport Increase
the number of cycling trips |
60,587 |
63,679 |
|
|
182,699 |
|
|||||||||||
(58,806) |
(60,438) |
(25,924) |
(37,531) |
|||||||||||||||
ì |
ì |
|
|
189,192 |
2.6 PORTFOLIO : SUSTAINABLE DEVELOPMENT, ENVIRONMENT & PLANNING POLICY
Corporate Objective : Protecting the Island’s physical
environment
Key Achievements Quarter 2 – 2004-05 |
Government targets (BVPI 109b-c) now being achieved on minor
and other planning applications (largely householder schemes) see KPI3b-c
below |
Best Value Inspection of the Planning Service undertaken
the week beginning 6 September 204. |
Completion
of report into the formation of an Isle of Wight Low Carbon Company (IWLCC) |
Successful completion of Castlehaven Coastal Defence
Scheme |
Inclusion of Operational Manager (Maintenance) in Peer
Review of Waste Management in Welsh Authorities |
Commencement
of the West Wight Landscape Partnership Project |
Environment waste collection service has continued to
achieve improving performance in the percentage of household waste recovered
and not sent to landfill and the number of missed waste collections remains
well below the quarterly target |
Areas to watch – 2004-05 |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken this quarter |
Risk
Assessment |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
An increasing mismatch between the number of planning
applications being received and staff levels. |
Consultants are being sought to offer some degree of
short-term relief to this situation.
Staff elsewhere in the Service are already being used more flexibly
to assist the situation. It is
likely that the submission of major applications will intensify in Q3 &
Q4 |
Risk Score = 9 Impact 3 Likelihood 3 |
NEW Q2 2004-05 |
Poor performance from Toilet Cleansing Contractor. |
New contractor from November 2004 and the performance
will continue to be closely monitored |
Risk Score = 6 Impact 2 Likelihood 3 |
NEW Q2 2004-05 |
Establishment of the Isle of Wight Low Carbon Company |
Seed funding is required to establish the company. The structure of the company is yet to be
determined and an Executive report is to be taken on this issue |
Risk Score = 6 Impact 2 Likelihood 3 |
Q1/Q2/Q3/Q4 2003-04 Q1/Q2
2004-05 |
Low yield of affordable housing on qualified sites
(KPI6). |
The Section 106 Agreement package is being finalised, and
will be a key component of the negotiations undertaken by the Development
Control Team. The overall issue of a
lack of affordable housing on the Island remains an area of concern for the
Council |
Risk Score = 6 Impact 3 Likelihood 2 |
PERFORMANCE MANAGEMENT INFORMATION –
KEY PERFORMANCE INDICATORS
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (Profile) |
Q2 - 2004 July-Sept (Profile) |
Q3 - 2004 Oct-Dec (Profile) |
Q4 - 2005 Jan-Mar (Profile) |
Target 2004-05 |
Comments |
|
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
||||||
Promoting sustainable service
delivery |
1. Number of
businesses enrolled on Island Green Awards Scheme (Local
Indicator) |
5 |
2 |
|
|
25 |
The
Summer season is a difficult time to undertake development work and this is
reflected in the quarterly target. Currently there are 64 businesses enrolled
onto the programme |
|
(5) |
(0) |
(5) |
(15) |
|||||
ì |
ì |
|
|
36 |
||||
Protecting the natural, built,
& historic environment |
2. % of new houses built on
previously developed land ((BVPI 106) |
100% |
81% |
|
|
80% |
The Building Control completion
system is a robust & auditable system, however there is sometimes a time
lag between units being finished & a receipt of the completion
notice. Once Greenfield housing
allocations in the UDP come on-line this indicator will fall |
|
(80%) |
(80%) |
(80%) |
(80%) |
|||||
ì |
ì |
|
|
95.8% |
||||
3a. Planning -
% of major planning applications determined within national standards (13
Weeks) (BVPI 109a/CPA) |
20% |
50% |
|
|
60% |
The
Development Control Team has made considerable progress in improving
performance. Long-established
applications are still being cleared out of the system: when these
applications have been completed performance will improve. |
||
(60%) |
(60%) |
(60%) |
(60%) |
59.7% |
||||
î |
î |
|
|
|
||||
3b. Planning -
% of minor planning applications determined within national standards (8
Weeks) (BVPI 109b/CPA) |
61.1% |
65.5% |
|
|
65% |
The Development Control Team
have improved performance and the target has been achieved |
||
(65%) |
(65%) |
(65%) |
(65%) |
|||||
è |
ì |
|
|
49.5% |
||||
3c. Planning -
% of other planning applications determined within national standards (8
Weeks) (BVPI 109c/CPA) |
82.3% |
81.9% |
|
|
80% |
The
Development Control Team and in-particular the Householder Team have
sustained good performance and the indicator target has been achieved |
||
(80%) |
(80%) |
(80%) |
(80%) |
|||||
ì |
ì |
|
|
68% |
||||
Improving the availability of
affordable housing |
4a.
Affordable Housing – the number of affordable housing units negotiated on
qualifying sites identified in the UDP (Policy H14) this quarter (Local Indicator) |
19% |
0% |
|
|
20% |
No affordable housing units were negotiated on qualifying
sites in the Unitary development Plan this quarter. Please see KPI’s 4b and 4c below |
|
(20%) |
(20%) |
(20%) |
(20%) |
|||||
è |
î |
|
|
0% |
||||
4b.
Affordable Housing – the amount of commuted payments negotiated through
Section 106 agreements this quarter (Local Indicator) |
£350,000 |
£228,250 |
|
|
NA |
It is not possible to profile this KPI, as provision on
site is preferable in all cases (see KPI above). Commuted sums are only an alternative where provision on-site
is not possible. To date £578,250 has
been negotiated for affordable housing |
||
|
|
|
|
|||||
4c.
Affordable Housing Units
approved where Housing Association is the developer this quarter (Local
Indicator) |
0 |
0 |
|
|
NA |
It is
not possible to profile this indicator because whether or not a Housing
Association submits an application is outside the control of the
authority. |
||
|
|
|
|
|||||
NA |
||||||||
Making best use of natural resources & cutting
waste generation |
5. Percentage of household waste recovered & not
sent to landfill (includes recycled waste, waste composted & waste used
for energy recovery) (BVPI 82/CPA) |
54.04% |
54.19% |
|
|
52% |
The
quarterly target has been achieved |
|
(54.0%) |
(54.0%) |
(50.0%) |
(50.0%) |
|||||
ì |
ì |
|
|
50.1% |
||||
6. Number
of missed waste collections from domestic customers. Target is 72 missed collections per week
averaged out over each quarter (Local
Indicator) |
35 |
36 |
|
|
72 |
Target on
track. Excellent performance by contractor. |
||
(72) |
(72) |
(72) |
(72) |
|||||
ì |
ì |
|
|
NA |
||||
7.
Standard of cleanliness in public toilets.
No more than 12 defaults issued to the contractor per quarter (Local
Indicator) |
23 |
28 |
|
|
12 |
New contractor takes over in November 2004. |
||
(12) |
(12) |
(12) |
(12) |
|||||
î |
î |
|
|
NA |
||||
Protecting the natural, built, & historic environment |
8.
Percentage of Building Control Decisions notified within the statutory time
limits – (Local Indicator) |
93.3% |
97% |
|
|
95% |
The
quarterly target for this indicator has been achieved |
|
(95%) |
(95%) |
(95%) |
(95%) |
|||||
è |
ì |
|
|
92% |
||||
9.
Renewable Energy Sources installed as a direct consequence of the Council’s
actions measured in (Kilowatts) |
0 |
13.8KW |
|
|
13.8KW |
Photovoltaic
roof commissioned and installed at Medina High School September 2004. kW = a
unit of power equal to 1000 watts |
||
0 |
(13.8KW) |
(13.8KW) |
(13.8KW) |
|||||
|
ì |
|
|
0 |
||||
10. IWC
energy consumption and resultant CO2 emissions from its buildings measured in
KwH (Kilo Watt Hours) and tonnes CO2. Annual figures |
16,049,815.8 kWh 4,649.21 tonnes per C02 (September 2004 figures) |
|
The
figures presented for this indicator are annual figures for all Council
property excluding School facilities.
This is the first year that the data has been collected and these
stats for 2003-04 will act as a benchmark for future years. |
2.7 PORTFOLIO:
TOURISM
& LEISURE
CORPORATE
OBJECTIVE: Improving Health
& the Quality of Life For All
Encouraging
Job Creation & Economic Prosperity
Key Achievements Quarter 2 – 2004-05 |
Numbers of enquiries dealt with at the Tourism
Information Centres and through the Call Centre are significantly ahead of
Q2 estimates |
Sales for advertising in both the main Isle of Wight
Guide and Winter Pocket Guide exceeded targets |
Ventnor Botanic Garden has attracted £142,000 in external
funding to develop a new herb garden and also a Southern hemisphere garden. |
The junior sports challenge and children’s activity
programme at Medina Leisure Centre, held over the Summer holidays, had their
best ever levels of attendance, engaging over 2,600 young people in physical
activities. |
Areas to watch –2004-05 |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
Q1/Q2
2004-05 |
Progress on full implementation of the Destination
Management System and reliance on
VISIT Hampshire and sub contractors to deliver |
Continued progress chasing and improvement of control
procedures with possible financial penalties on contractors |
Risk
Score = 6 Impact 2
Likelihood 3 |
Q1/Q2 2004-05 |
Potential
fall in income and usage of leisure centres caused by changes in their external
operating environment. |
Action to be taken to manage the
changes in the external operating environment which impact on income and the
usage, including discussions about car parking arrangements. |
Risk
Score = 6 Impact 2
Likelihood 3 |
Q4 2003-04 |
Impact
of the changes to the membership arrangements of IW Tourism on the revenue
generated from & sale of advertising. |
Only concern is contributions to Image Campaign – other
general advertising sales have exceeded targets |
Risk
Score = 6 Impact 2
Likelihood 3 |
NEW Q2 2004-05 |
Securing full contributions from Image Campaign Partners
particularly the Chamber of Commerce, Tourism & Industry |
Presentation of new ideas on campaign for 2005.
Investigating further benefits to be offered to trade membership
associations |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q3/Q4
2003-04 |
Community Development Budget
Issues – Dinosaur Isle & Ryde/Shanklin Theatres |
Close management and monitoring
of the budgets - Dinosaur Isle’s running costs have been monitored
closely and due to good visitor numbers, enhanced displays and an
entrepreneurial approach to income generation, income levels have
improved. However, the museum
continues to struggle to maintain a secure income stream & to tackle its
budget deficit, so further monitoring is required. |
Risk
Score = 4 Impact 2
Likelihood 2 |
Q4 2003-04 |
Number
of visits to IWC funded and / or managed Sports & Leisure Facilities |
Performance remains at 5% below
expectations. Two thirds of the user
shortfall is attributable to the IWC funded facilities. Work is ongoing to review the profile as
Q2 would normally be expected to be a quieter usage period. |
Risk
Score = 4 Impact 2
Likelihood 2 |
Corporate Priority (Corporate Plan 2002-05) |
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
|
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
||||||
Supporting
tourism development |
1. Number of
Tourism Call Centre enquiries dealt with
(Local Indicator) |
44,838 |
37,538 |
|
|
165,000 |
The target has been achieved. An Internet campaign was undertaken during
the month of September to attract more inquiries for the Island 2004
accommodation guide |
|
(42,000) |
(35,000) |
(16,000) |
(72,000) |
|||||
ì |
ì |
|
|
NA |
||||
2. Number of Tourist Information Centre enquiries dealt
with (Local Indicator) |
148,970 |
233,040 |
|
|
430,000 |
Agency
agreements with the Ministry of Sound and Bestival, together with increased
visitors at Yarmouth TIC since refurbishment, have contributed to the 18%
increase to profile. |
||
(143,000) |
(197,000) |
(50,000) |
(40,000) |
|||||
ì |
ì |
|
|
425,087 |
||||
3. Number of registered providers on the DMS (Destination Management
System) – this system collates all data on the Islands Tourism providers. The
information is used by the TIC’s and is also found on the “islandbreaks”
web-site (Local Indicator) |
21 |
18 |
|
|
880 |
Due to a number of change of ownerships within the
industry we have 8 ‘pending’ providers (who must apply for annual Quality
Assurance before they are registered).
Once these applications are confirmed the KPI will meet targets. |
||
(20) |
(25) |
(25) |
(30) |
|||||
ì |
î |
|
|
780 |
||||
4. Number of visitors to the www.islandbreaks web site (Local Indicator) |
186,000 |
184,455 |
|
|
520,000 |
Increase
of 2½% in line with target profile |
||
(150,000) |
(180,000) |
(50,000) |
(140,000) |
|||||
ì |
ì |
|
|
493,000 |
||||
5. Number
of businesses advised/assisted with regard to their grading or helped with
complaints (Local Indicator) |
15 |
23 |
|
|
|
During July / August and September the majority of
the tourism industry are focusing on providing the visitor with an enjoyable
experience and therefore do not have the time to meet and discuss their
business needs. So overall the
results are satisfactory. |
||
(10) |
(20) |
(30) |
(25) |
|||||
ì |
ì |
|
|
|
||||
6. The value of tourist expenditure (Local Indicator) |
Nil Return |
Nil Return |
|
|
£336m |
Figures
to be provided by calendar year end and reported in Quarter 3 |
||
(£80m) |
(£180m) |
(£60m) |
(£16m) |
|||||
|
|
|
|
|
||||
Promoting healthy living |
7. Number of Visits this quarter to IWC funded, supported
and / or managed Sports & Leisure Facilities (Local Indicator) |
322,191 |
295,528 |
|
|
1,358,140 |
Sports Development - Lower numbers from previous
quarter as less educational weeks due to summer holidays and indoor
facilities not used as much due to a wider range of activities available
outdoors. Also usage figures for
Fairway Athletics Track are down due to extended refurbishment programme. Wight Leisure – There was a decrease in user
numbers at the Waterside Pool this last quarter – this being due to the
failure of the retractable roof. |
|
(325,278) |
(299,900) |
(356,314) |
(376,648) |
|||||
î |
î |
|
|
1,362,389 |
||||
8. Percentage of GP Referrals transferring to One
Card Membership this quarter (Local
Indicator) |
31.3% |
32% |
|
|
25% |
The number of referrals remains on target |
||
(28%) |
(23.6%) |
(22.5%) |
(31.7%) |
|||||
ì |
ì |
|
|
NA |
||||
9. Total number of One Cards in issue this
quarter (Local indicator) |
2,854 |
4,189 |
|
|
3,000 per Q |
750 new Visitor Cards issued this period |
||
(2,740) |
(3,507) |
(3,025) |
(2,935) |
|||||
ì |
ì |
|
|
NA |
||||
Promoting
healthy living |
10. Average number of leisure centre visits per
One Card holder this quarter (Local
Indicator) |
13.8 |
12.4 |
|
|
15 |
Does not count Resident Cards usage |
|
(13.6) |
(11.5) |
(11.0) |
(15.5) |
|||||
ì |
ì |
|
|
NA |
||||
2.8 PORTFOLIO:
Resources
CORPORATE OBJECTIVES: Making it Happen
Key Achievements Quarter 2 – 2004-05 |
BVPP
Audit completed – one performance indicator had a “reservation” on it, down
from 5 in 2003-04 |
Successful consultation exercise completed with key
Stakeholders re School organisation. Findings forwarded to the Portfolio
holder. |
Currently resolving 35%-40% of enquiries to the call
centre/help centre at first contact including 80% of registrars enquiries |
Legal Services Team achieved re-accreditation to the Law
Society Practice Management Standard, Lexcel and is still the only legal
practice on the island so accredited |
Housing Benefit performance now well in to upper quartile
performance in second quarter |
Statutory earlier closure of accounts completed one month
in advance of national timetable |
Areas to watch –2004-05 |
|||
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
NEW Q2
2004-05 |
Progress on E-Government |
An
updated e-government strategy and action plan is being drafted. The GAGS
programme board has tasked the Head of Organisational Development with
reviewing all of the ODPM targets by the end of November. Actions on the services identified will
feed through in future QPMR reports |
Risk
Score = 16 Impact 4
Likelihood 4 |
NEW Q2
2004-05 |
Non achievement of quarterly
targets for Key Performance Indicators and PSA – approximately 30% missed
target |
Investigation into the non achievement of quarterly
targets, in particular the 7 indicators for Adult & Community Services
(50%) the 4 indicators for Resources (28.6%) and 2 for Children’s Services
(28.6%) |
Risk
Score = 12 Impact 4
Likelihood 3 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Demand on the ICT Department
currently exceeds capacity in the areas of - Database Management, Risk
Management, Staff Training, Information Management and Project Support |
Directors / Executive to be aware and to take into
account during decision making processes Strategic partnering being investigated as a
possible way of increasing capacity.
Outline Business Case due November. |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
ICT business continuity / disaster recovery |
Recruitment of ICT Security Manager in Progress. |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q1/Q2/Q3/Q4 2003-04 Q2
2004-05 |
The
number of staff absences due to sickness |
Marginal decrease in absence but need for line managers
to continue regular monitoring and application of policies |
Risk
Score = 9 Impact 3
Likelihood 3 |
Q4
2003-04 Q2
2004-05 |
Need
to consider potential impact changes to pension regulations on ability to
manage ‘rightsizing’, the older worker and careers of younger employees |
Changes to scheme not yet promulgated but assessment
required when changes to LG Pension Scheme are confirmed and Workforce Plan
available. |
Risk
Score = 9 Impact 3
Likelihood 3 |
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
Q2/Q3/Q4 2003-04 Q1/Q2
2004-05 |
Delays in funding the Land and Property Gazetteer and the
CRM project will mean that these projects miss their planned implementation
dates. |
Project on hold due to lack of funding. Alternative
approach being considered by Information Management Group. |
Risk
Score = 9 Impact 3
Likelihood 3 |
NEW Q2
2004-05 |
Preparations for combined election – possibly General
Election, Local Elections, Parish/Town Council Elections and a Mayoral
Referendum on the same day. |
This is a one off occurrence with no performance data
(smooth running of the election being distinct from, say, turnout as an
indicator of democratic engagement). The key control measures are meticulous
planning and dedication of sufficient resources. |
Risk
Score = 8 Impact 4
Likelihood 2 |
Q4
2003-04 Q1/Q2
2004-05 |
Business process re-engineering |
Business Process Re-engineering recommendations delivered
to Planning Dept on schedule. Resources now being focused on E-Government
Agenda |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q1/Q2
2004-05 |
Liquor Licensing – ability to deliver in a timely fashion
new statutory processes once commenced by Central Government |
Identifiable
risk factors include:
Contingency
planning can ensure a flexible and resilient response to pressure on support
officers, legal advice and accommodation. Non-availability of members – and
pressure on their time is more intractable and good use will need to be made
of negotiations with the trade, officer delegations (as a last resort) and
of flexibility of meeting times and locations. |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q4
2003-04 Q1/Q2
2004-05 |
Implementation of Total Land Charges (“TLC+”) - new local
land charges software |
Negotiations on-going with supplier to fix
crucial bugs. Go Live date not yet set. |
Risk
Score = 6 Impact 2
Likelihood 3 |
Q1/Q2
2004-05 |
Consultation
Strategy – delay in completion |
Consultation
Strategy is now complete in a draft format and is to be considered by
Directors and Members aiming to be finally approved by December 2005 |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q3/Q4
2003-04 Q1/Q2
2004-05 |
Staff capacity
constraints within the Corporate Policy Team is limiting the unit’s ability
to tackle the key corporate issues |
This
remains an important issue especially with the preparations for CPA
re-assessment in 2005. Discussions
are to be held with Directors to agree the Corporate priorities |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q3/Q4
2003-04 Q2
2004-05 |
Implementation of the People
Management Strategy |
Additional resources and structure in place to progress
People Management Strategy action plan |
Risk Score
= 6 Impact 3
Likelihood 2 |
Q4
2003-04 Q2
2004-05 |
Application
by Service and Line Managers of HR policies in relation to sickness absence
and flexible working |
Additional resources now available for advice and
support. Monitoring to continue. |
Risk
Score = 6 Impact 3
Likelihood 2 |
Quarter
Reported |
Area to
Watch |
Action
to be taken |
Risk
Assessment |
Q42003-04 Q1/Q2
2004-05 |
Relocation of the Registrars Office to Northwood House |
Member approval now secured, risks include; need to
secure trustees approval for business plan, obtaining listed building
consent, delivering building work to time and budget and securing the
consent of the Registrar General – all work streams within a revised
project. |
Risk
Score = 6 Impact 3
Likelihood 2 |
Q1/Q2/Q3/Q4 2003-04 Q1/Q2 2004-05 |
Crime
& Disorder – in relation to vandalism to council buildings |
Crime
and disorder and in-particular vandalism to Council Property remain a key
concern for the Property Services Team.
Continuing to monitor trends & liaise with task groups & Police |
Risk
Score = 6 Impact 2
Likelihood 3 |
Q4
2003-04 Q1/Q2
2004-05 |
Concern
had been expressed previously about the lack of progress on implementing the
Procurement Strategy |
Some issues that remain to be progressed include
establishing a procurement board and a liaison group, links with the
diversity agenda and the economic development agenda, extending the
partnering principles to other parts of the Council, collaborative
arrangements; links with the environmental and sustainability agenda; and
improving performance measurement. For further information update reports will be issued to
the Directors’ Group and the Resources Select Committee (1 November) and
Informal Executive (15 November). This issue has been identified as a
Corporate risk and as such is being monitored by the Council’s Risk
Management Group. It currently has a risk score of 6. |
Risk
Score = 6 Impact 2
Likelihood 3 |
NEW Q2
2004-05 |
Communications
& PR – need to achieve a more positive media and public view of the
Council |
Peer
Review to be commissioned leading to a revised Communications and PR
strategy |
Risk
Score = 6 Impact 3
Likelihood 2 |
NEW Q2
2004-05 |
Ryde
Community Wardens – The funding for the Community Wardens ceases in March
2005 |
Alternative
funding options need to be investigated |
Risk
Score = 6 Impact 3
Likelihood 2 |
NEW Q2
2004-05 |
Completion of Workforce Plan |
Work in progress currently being treated as a priority |
Risk
Score = 6 Impact 2
Likelihood 3 |
Q1/Q2
2004-05 |
Information/Knowledge Management – inability to deliver
new compliance regime |
Launch event and training dates set and
awareness being raised throughout the authority. Systems being developed to assist with dealing with requests
and improved records management. Most important as yet uncompleted control
measure is identification of individuals in each service area as
Departmental Information Guardians |
Risk
Score = 4 Impact 2
Likelihood 2 |
Please note that the figures in brackets are the quarterly target
profile figures for each of the Indicators
KPI Description |
Q1 - 2004 Apr- June (profile) |
Q2 - 2004 July-Sept (profile) |
Q3 - 2004 Oct-Dec (profile) |
Q4 - 2005 Jan-Mar (profile) |
Target 2004-05 |
Comments |
|
Performance Assessment Actual Against Profile |
ìèî |
Actual 2003-04 |
|||||
1. Number
of working days/shifts per employee (full time equivalent) lost due to sickness absence this quarter (BVPI
12/CPA) |
2.13 |
1.74 |
|
|
9.1 |
The
profile is based on a best guess after looking at the last two years
quarterly figures. The2nd quarter is as usual a little down, but this will go
up as more data comes in. 1st
quarter has been updated, following more available data. |
|
(2.3) |
(1.9) |
(2.7) |
(2.8) |
||||
ì |
ì |
|
|
9.3 |
|||
2. The number of staff
undertaking one or more training activities this quarter (via IWC training
Services) as a % of the total workforce excluding Education Staff – (Local Indicator) |
788 |
570 |
|
|
47% |
The
profile is the target % of the maximum number of delegates attending training
each quarter (The figure is derived from the planned/anticipated training
activity each quarter within 2004/2005) |
|
(789) |
(530) |
(778) |
(659) |
||||
ì |
ì |
|
|
1,523
staff 66.6% |
|||
3. The number of members
undertaking one or more training activities this quarter (out of all 48
members).(Local Indicator) |
16 |
22 |
|
|
80% |
The
profile is the target % of the maximum number of members undertaking training
activity each quarter (n.b. we rely on feedback from other departments to
inform us of Elected Member training activity as we do not run our own, and
therefore cannot anticipate any activity) |
|
(34) |
(38) |
(38) |
(38) |
||||
î |
î |
|
|
42
Members 87.5% |
|||
4. The
percentage of women in the top 4 tiers of management. (Local
Indicator) |
35% |
35% |
|
|
50% |
There is
no change to the top 4 tiers of management for this quarter compared with the
last. |
|
(50%) |
(50%) |
(50%) |
(50%) |
||||
î |
î |
|
|
|
|||
5. Number of Complaints across
the Authority (Local Indicator) |
45 |
62 |
|
|
220 |
Environment
Services were passed 12 complaints against the cleanliness of toilets. The total number of complaints remains
within the summer season quarterly target. Corp Services = 5 Children
Services = 11 Environment = 29 Fire & Rescue = 1 Adult & Community
Services = 16 |
|
(50) |
(60) |
(60) |
(50) |
||||
ì |
è |
|
|
209 |
|||
6. The number of types of
interactions that are enabled for electronic delivery as a percentage of the
types of interactions that are legally permissible for electronic
delivery. (BVPI 157/CPA) |
23.46% |
30% |
|
|
60% |
Data
entry for BVPI 157 is now mandated to be on-line using the Electronic Service
Delivery (ESD) Toolkit. As part of the drive to e-government, Organisational
Development staff are working in a structured way with services to e-enable
the customer facing processes, and introducing Quality Assurance steps at
each stage. It has been agreed that the BVPI figure will be available for the
GAGS Programme Board in mid-November. Performance Management need also to
take into account the ODPM Priority outcomes for e-government, published in
September 2004, which represents another set of targets against which
Council's will be judged. It is expected that progress against e-government
will be one factor in the CPA score. In the interim, and reflecting the
achievements such as on-line planning, a modest growth is estimated. |
|
(60%) |
(60%) |
(60%) |
(60%) |
||||
î |
î |
|
|
23.46% |
|||
7. The percentage of invoices for
commercial goods and services which were paid by the authority within 30 days
of such invoices being received by the authority. (BVPI 8/CPA) |
91% |
90% |
|
|
95% |
Details
of those departments who have submitted late invoices to the Payments Section
are circulated to Heads of Service. Performance cannot be improved unless
these are reduced. |
|
(95%) |
(95%) |
(95%) |
(95%) |
||||
î |
î |
|
|
93% |
|||
8. The percentage of standard searches
carried out in 10 working days (BVPI
179/CPA) |
100% |
100% |
|
|
100% |
We do
everything within our control to ensure that the 10 working day target is not
exceeded and will continue to do so. |
|
(100%) |
(100%) |
(100%) |
(100%) |
||||
ì |
ì |
|
|
100% |
|||
9. Total
operating cost (TOC) of IWC property per employee (Local Indicator) |
£311.50 |
£191.86 |
|
|
£275.00 |
The
quarterly target figure has been achieved.
The fall in the figures for Q2 is to be expected due to seasonal
patterns |
|
(275.00) |
(275.00) |
(275.00) |
(275.00) |
||||
î |
ì |
|
|
|
|||
10. % of authority buildings open to
the public in which all public areas are suitable for and accessible to
disabled people. (BVPI 156/CPA) |
17% |
17% |
|
|
18% |
The
indicator is calculated on an annual basis.
The Property Services Team are undertaking a programme of
improvements. |
|
(18%) |
(18%) |
(18%) |
(18%) |
||||
è |
è |
|
|
17% |
|||
11. Benefits – average calendar days
this quarter to process a new housing benefits claim (BVPI 78a) |
38.31 |
24.08 |
|
|
36 |
Upper
quartile performance. Will be more difficult to achieve in the busier Autumn
quarter. |
|
(36) |
(36) |
(36) |
(36) |
||||
î |
ì |
|
|
75.8 |
|||
12. Benefits - average calendar days
this quarter to process changes in circumstances
(BVPI 78b) |
8.41 |
8.51 |
|
|
|
Within
Government target. |
|
(9) |
(9) |
(9) |
(9) |
||||
ì |
ì |
|
|
16.2 |
|||
13. Benefits -
% of new housing benefit claims this quarter determined within 14 days of
receipt of all necessary information (BVPI 78c) |
73% |
96.19% |
|
|
70% |
Upper
quartile performance |
|
(70%) |
(70%) |
(70%) |
(70%) |
||||
ì |
ì |
|
|
60% |
|||
Corporate Objective |
PSA Target & Summary |
Q1 - 2004 Apr- June |
Q2 - 2004 July-Sept |
Q3 - 2004 Oct-Dec |
Q4 - 2005 Jan-Mar |
Target 2004-05 |
Comments |
(profile) |
(profile) |
(profile) |
(profile) |
Actual 2003-04 |
|||
Making It Happen |
12. Cost Effectiveness To improve the
cost-effectiveness Council-wide. 7.5% cost efficiency savings by 2006 |
This indicator measures improvement in a basket of 30 performance indicators, and this amounts to almost 11% over the first two years of the target. This then has to be divided by the increase in the Council’s net budget over the same period. Largely because of national pay and taxation changes, social services demographic pressures, Government sponsored investment in schools, and Government approved and funded capital investment, the net budget increases in the same period by 14%, and causes this indicator to produce an arithmetically negative result. The methodology imposed on this and other councils by the Government when this particular LPSA target was negotiated is clearly unsound as a measure of efficiency, and the Council is considering recognising its innate un-deliverability, in which case it will not be reported in future. |
SECTION 3 : FINANCE
REPORT
Adult and Community
Services
|
||
Adult Services |
Overspend of £35,626 predicted.
Community Care remains an area under pressure and will continue to be
monitored very closely. |
|
Housing |
Currently projecting an
overspend of £42,613. Considerable pressure around homelessness, due to
increased expenditure on leasing properties, although to date largely covered
by savings elsewhere within Housing budget, but expectation is that overspend
will become more apparent in next quarter. |
|
Housing Benefits |
Housing Benefit expenditure has
increased significantly compared to the previous year due to raised claimant
awareness and additional pension credit claims. However expenditure is in
line with budget expectations for the year. Income in the form of a
Government subsidy is received monthly on account, and is based on previous
year’s figures until the external audit is complete. From April 2004 the way
in which the Government funds this expenditure has changed to be funded 100%
from specific grants instead of 95% as previously. These adjustments are reflected
in the budget. |
|
Community Development |
Potential overspend of approximately £70,000 mainly
due to reduction in income at Dinosaur Isle, Libraries and Ryde Theatre. |
|
Community Safety |
Budget on target to date |
|
Children’s Services
|
||
Education – Schools Block |
Net expenditure in all areas is
slightly below the target percentage of 50%. However, this can be attributed
to one of a number of factors; receipt of Specific Grant in advance of
expenditure; the start of a new Academic Year; and the occurrence of Seasonal
Expenditure and Income. |
|
Education – LEA Block |
||
Children’s and Family Services |
||
Economic Development, UK
and EU, Regional Issues
|
||
Economic Development |
Possible budget shortfall due to
end of grant funding towards salaries. |
|
Fire,
Emergency Planning and Consumer Protection |
||
Fire & Rescue |
Budget on target, assuming any
current year financial implications of IPDS are funded from designated Fire
& Rescue reserve. |
|
Emergency Planning |
Budget on target to date. |
|
Crime and Disorder |
Budget on target to date |
|
Consumer Protection |
Budgets for consumer protection
admin, trading standards and health and safety on target to date. |
|
Bereavement Services |
Income is down on expectations
and currently seems likely to fall short of budget requirements at year end,
by up to £95,000. However the Task Force G supports an above inflation
increase in cremation fees as from 1st April 2005. Grounds
Maintenance contract costs to be reduced where possible. |
|
Environmental Health |
Budget on target to date. |
|
Coroner |
Budget on target to date. |
|
Transport |
||
Highways |
Potential overspend of £250k is
to be addressed as in previous years by recharging appropriate structural
maintenance to capital. However,
this option is also being drawn upon for other pressure areas - bridge inspections
and Ryde Interchange preliminary costs.
Close monitoring will be required to ensure expenditure remains within
budget. |
|
Walking/Cycling |
Budget on target to date. |
|
Public Transport |
Budget on target to date. |
|
Cowes Floating Bridge |
Budget on target to date. |
|
Transport Fleet |
Budget on target to date. |
|
Car Parking |
Income expectations have been
increased to accommodate additional subsidised bus routes and the
Concessionary fares shortfall. Income
recovery to date is approximately £60,000 short of target for time of year. |
|
Sustainable
Development, Environment and Planning Policy |
||
Environmental Initiatives
including Local Agenda 21 |
Government Grant allocated for a
Renewable Energy Feasibility Study of £40,750 yet to be fully spent. Green
Island expenditure to be offset by Leader Plus grant awarded quarterly in
arrears |
|
Planning Policy, Countryside
& Planning Management |
Budgets on target at
present. Planning Delivery Grant of £605,231 received this year to aid
service improvement. |
|
Development Control |
||
Building Control |
Building control
budget on target to date. |
|
Coastal Management |
Ventnor Haven income likely to
fall short of expenditure needs - £40,000. |
|
Harbours and Seafronts |
Budget on target to date |
|
Engineering Contracts |
Budget on target to date. |
|
Waste Management |
Budget on target to date. |
|
Tourism and Leisure
|
||
Tourism |
Budget on target to date. |
|
Leisure - Parks and Gardens |
Budget currently on target |
|
Leisure Facilities and Other
Leisure Services |
Budget currently on target |
|
Leisure – Wight Leisure
Operations |
Overall income for facilities
and for the One Card scheme is on target, with a fall in casual income being
mirrored by a rise in One Card use.
The initial reaction to charges being introduced for car parking in
the form of membership cancellations, has indicated that significant pressure
has now been placed on the income targets for this and future years. This will require close monitoring and
suitable provision to prevent a considerable financial problem. The effect of parking charges at seasonal
sites cannot be clearly identified, but due to poor weather, income in this
area is down on the previous year. |
|
Resources
|
||
Corporate Services Directorate |
Budget currently on target. |
|
Legal and Democratic Services |
Land charges income has reduced
due to the slow-down in housing activity and the financial advantage gained
during the early part of the year has now been eroded. Other budgets on
target. |
|
Finance & Business Services |
Budget currently on target. |
|
Information Communications
Technology |
A number of ICT projects, particularly
those related to delivery of E-government, are funded partly from reserves
and Government grants. There are ongoing funding implications of those
projects, and it is essential to ensure that base budgets are in place to
allow the continuing development of the approved projects; in addition, there
are a number of proposed developments for which funding streams will also
have to be identified if further progress is to be made. |
|
Human Resources & Training |
The budget for the Health and
Safety training programme for managers is currently 80% paid and committed –
the remainder will probably be spent this year. Other budgets on target. |
|
Policy & Communications |
Currently on target overall –
however, budget pressures are still partly being funded from one-off
resources carried forward from previous years – the continuation of such
measures is unlikely to be available in future years. The under-recovering
print unit budget is currently being considered as part of an external review
to assess the unit’s viability. |
|
Best Value & Select
Committee Support |
Currently on target. Budget to
be restructured to ensure continuity, thereby freeing up reserve previously
set aside to support expenditure peaks in early years. |
|
Property Services |
Markets income is lower than expected
at this stage of the year. Some voids
in leased properties affecting income flows.
Staff changes occurring which may impact on the budget. |
|
Building Maintenance |
Budget on target to date. |
|
3.2 : Revenue
Expenditure Budget Monitor by Portfolio – to the end of September 2004
Original Spend To Left
Budget Date
8A Education and
Community Development £78,526,826 £29,784,648 £48,742,178
8B Social Services
and Housing £40,859,472 £22,385,110 £18,474,362
8C Fire, Emergency
Planning & Consumer Protection £10,259,836 £4,240,263 £6,019,573
8D Tourism and
Leisure £5,246,231 £1,275,633 £3,970,598
8E Economic
Development £296,044 £200,838 £95,206
8F Transport £8,151,100 £1,113,487 £7,037,613
8I Sustainable
Development, Environment, Planning £12,013,300 £2,484,902 £9,528,398
8Z Resources £6,705,959 £5,325,143 £1,380,816
£162,058,768 £66,810,025 £95,248,743
1) Financial Information System currently being updated to take account
of recent restructuring
2) Budgets revised from original to take account of carry forwards from
previous year, additional grants etc
3) Spend to date represents 41.2% of approved budget and includes
expenditure incurred to 30 September 2004, but excludes commitments
4) Spend to date excludes capital financing charges, support service
charges and other adjustments and recharges
5) Spend to date on the Resources Portfolio service areas includes gross
expenditure on support services prior to recharges being made
6) Total figures may not add up exactly due to rounding
Capital Expenditure
Budget Monitor by Portfolio – to the end of September 2004
Revised
Spend
To Left
Budget Date
8A Education and
Community Development £11,126,213 £3,961,728 £7,164,485
8B Social Services
and Housing £5,028,637 £1,224,363 £3,804,274
8C Fire, Emergency
Planning & Consumer Protection £290,702 £49,841 £240,861
8D Tourism and
Leisure £25,426 £0 £25,426
8F Transport £8,116,080 £1,960,332 £6,155,748
8I Sustainable
Development, Environment, Planning £3,360,943 £2,162,729 £1,198,214
8Z Resources £1,118,222 £520,423 £597,799
£29,066,223 £9,879,417 £19,186,806
Notes
1) Financial Information System currently being updated to take account
of recent restructuring
2) Spend to date represents 34.0% of approved budget and includes
expenditure incurred to 30 September 2004, but excludes commitments
3) Total figures may not add up exactly due to rounding
APPENDIX 2
LOOKED AFTER CHILDREN |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
|||||||||||
The number of
children looked after by the IOW Council |
159 |
158 |
152 |
165 |
160 |
154 |
|
|
|
|
|
|
|||||||||||
These are the actual numbers of looked after children |
|||||||||||||||||||||||
1. The number
of looked after children who have had 3 or more placement moves in the last
year. (Performance 02/03 PAF A1 ) |
25 |
21 |
23 |
23 - 9 |
18 - 10 |
16 12 |
|
|
|
|
|
|
|||||||||||
The top figure is cumulative for preceding 12 months. The bottom
figure only collected since July, and is cumulative since April 2004. |
|||||||||||||||||||||||
The number
of children looked after who are
excluded from school (E) or are receiving a part-time education (PT) (E/PT) – Temp exclusions does not include
schools figures. |
3E 5PT |
2E/ 7PT |
4E/ 16PT |
2E 5PT |
School Holiday |
3E 5PT |
|
|
|
|
|
|
|||||||||||
E = fixed term exclusions that the LEA know about, this does not
included permanent exclusions. PT includes education provision at Thompson
House. The drop from June to July was because11 of the children became
16 and are considered as school leavers and as such, are not then included in
the total. |
|||||||||||||||||||||||
The number of
children looked after who have a current Personal Education Plan in place,
comparative to number of Looked After Children of school age. (expressed as a
percentage in brackets) The downward
trend is usual at the start of the new school year. |
|
|
119/ 130 92% |
90/ 130 69% |
91/ 128 71% |
82/ 126 65% |
|
|
|
|
|
|
|||||||||||
2. The annual
looked after children GCSE results as a % of the year cohort 1 ) 1 GCSE A-G PAF () 2) 5 GCSE A-C |
|
|
|
|
|
55.5% - 11% |
|
|
|
|
|
|
|||||||||||
3. The number
of children looked after who have had a health assessment in the last year
collected once @ year (Performance 02/03 PAF C19 ) |
|
137 |
|
|
|
|
|
|
|
|
|
|
|||||||||||
4. The number
of looked after children who have been looked after for four years plus and
have been in the same placement for the last two years) expressed as a
fraction of those looked after for 4 years. (Performance 02/03 PAF D35 (It is expressed as a
percentage) |
|
|
46% |
28 - 52 - 57% |
30 - 53 - 57% |
30 - 61 - 49% |
|
|
|
|
|
|
|||||||||||
CARE
LEAVERS |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
||||||||||||||||||||
5. The number
of care leavers in higher education, training and employment(Performance
02/03 PAF A4 ) on
their 19th birthday. |
0/2 0% |
1/4 25% |
1/4 25% |
4/7 57% |
5/8 63% |
5/8 63% |
|
|
|
|
|
|
||||||||||||||||||||
SAFEGUARDING
CHILDREN (CHILD PROTECTION) |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
||||||||||||||||||||
Numbers of
children on the Child Protection Register |
49 |
45 |
53 |
44 |
46 |
41 |
|
|
|
|
|
|
||||||||||||||||||||
6. Numbers of
children that are re-registered on the Child Protection register in the last year (Performance 02/03 PAF A3
) |
2 |
2 |
2 |
2 |
2 |
4 |
|
|
|
|
|
|
||||||||||||||||||||
Numbers of
children on the Child Protection Register that are allocated to a qualified
social worker (percentage in brackets) |
49 (100%) |
45 (100%) |
53 (100%) |
44 (100%) |
46 (100%) |
41 (100%) |
|
|
|
|
|
|
||||||||||||||||||||
CHILDREN
WITH DISABILITIES |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
||||||||||||||||||||
Numbers of
children receiving direct payments |
10 |
11 |
11 |
21 |
21 |
22 |
|
|
|
|
|
|
||||||||||||||||||||
WORKFORCE
& WORKOLAD ISSUES |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
||||||||||||||||||||
No of social
worker vacancies (percentage
in brackets) |
1 1.5% |
3 3% |
4 6% |
4 6% |
5.5 3.4% |
11 6% |
|
|
|
|
|
|
||||||||||||||||||||
% change from August as we have created new posts. |
||||||||||||||||||||||||||||||||
The Island’s
Relative Performance based on the Spring Delivery & Improvement Statement
KPIs |
Assessed performance |
Value |
Benchmark position* |
||
LOOKED AFTER
CHILDREN |
|||||
1. Stability of
placements % of children with 3 or more placement moves. National
target for every council to have a value of 16% or less |
EXCELLENT ===== |
14.4% |
4th of 16 |
||
In Foster care or
placed for adoption % of children |
EXCELLENT ===== |
87% |
5th |
||
Young children in
foster placements or placed for adoption % of all LAC under the age of 10 |
GOOD ==== |
97.8% |
12th |
||
4. Long term
stability % of children who
have been looked after continuously for at least 4 years, who have
spent the last 2 years in the same placement |
GOOD ==== |
62% |
3rd |
||
Offending % of children over 10 looked after for over 12 months who
have received a final warning, reprimand or conviction, as a % of all
children in the police force area. National target 7.2% |
FAIR === |
2.7% |
5th |
||
Adoptions No of children adopted as a % of all looked after children |
POOR == |
3.3% |
14th |
||
3. Health Average % looked after for 12 months who have had their
teeth checked and an annual health assessment |
EXCELLENT ===== |
90% |
1st |
||
Absence from
Education % of children who had been looked after for 12 months who
missed 25 days of schooling |
GOOD ==== |
7.1% |
1st |
||
Cost of LAC services
Average gross weekly expenditure in foster or residential
care |
GOOD ==== |
£509 |
5th |
||
Unit cost of
residential care Average gross weekly expenditure for residential care |
FAIR === |
£2,030 |
9th |
||
Unit cost of foster
care Average gross weekly expenditure for foster care |
POOR == |
£352 |
12th |
||
CARE LEAVERS |
|||||
2. Educational
achievement % of children leaving care aged 16+ with 1 GCSE (2003).
National target 75% |
WEAK = |
16.6% |
16th of 16 |
||
KPIs |
Assessed performance |
Value |
Benchmark position* |
||
5. Employment,
education & training for care leavers % of YP who were in care on
their in their 17th year who are in education, training and
employment at age 19. National target 60% |
FAIR === |
53% |
14th |
||
CHILDREN AT RISK –
CHILD PROTECTION |
|||||
Re-registration on
the Child Protection Register % of children registered during the year, who had been
previously registered |
POOR == |
4.6 |
14th (too low) |
||
Reviews of child
protection cases % of cases which should have been reviewed which were
reviewed. |
EXCELLENT ===== |
100% |
=1st (8 others) |
||
Duration on the
Child Protection Register % of children deregistered during the year that had been
on the Register continuously for 2 years or more. |
POOR == |
15.7% |
15th |
||
CHILDREN IN NEED |
|||||
Relative spend on
family support Gross expenditure on children in need as a % of the gross
expenditure on all children’s services. |
GOOD ==== |
33% |
7th |
||
Ethnicity of
children in need The ratio of the % of CIN were from minority ethnic groups
to the % of the local population |
FAIR === |
1.7% |
4th |
||
Comparator group is from the Institute of Public Finance.
The group has 16 members comprising:
Calderdale, Blackpool, Darlington, North Tyneside, Bath
& NE Somerset, North Somerset, Bournemouth, York, Wirral, Sefton,
Herefordshire, East Ridings of Yorkshire, Torbay, Southend on Sea, Poole and
the Island. Our average ranking with no weighting is: 7th
SPRING 2004 PERFORMANCE |
||||
WEAK |
POOR |
FAIR |
GOOD |
EXCELLENT |
1 BLOB |
2 BLOBS |
3 BLOBS |
4 BLOBS |
5 BLOBS |
1 |
4 |
5 |
5 |
4 |
|
|
|
|
|
*
APPENDIX
3
QUARTERLY
PERFORMANCE MANAGEMENT REPORT
LONGTERM
AREAS TO WATCH
1.
This
Appendix investigates the four particular Areas to Watch that were reported in
all four quarters of 2003-04. For each
of the four issues discussions have taken place between the Corporate Policy
Team and the relevant Head of Service.
The issues have now been reviewed and the actions that have been
previously implemented evaluated and examined and proposed Action Plans have
been developed to address the problems and manage the potential risks to the
Council.
2.
The
four long-term Areas to watch that have been reported in all four quarters of
2003-04 are the following:
·
Human
Resources – absences due to sickness
·
Planning
Services – low yield of affordable housing on qualified sites
·
Transport
– Completion bridge safety inspections
·
Property
Services – Vandalism to Council buildings
OPTIONS
3.
Option
1 -That this report and the attached Action Plans be received and approved by
the Executive, subject to any comments or changes made by the Executive
Option 2 – To agree the four
action plans that have been developed and attached as appendices to this report
subject to any comments or changes made by the Executive
Option 3 – To request the relevant Select Committees to
investigate any areas of concern the Executive may have from the report and to
monitor the progress of the Action Plans attached
Human Resources – absences due to sickness
QUARTERLY REPORTING – AREAS TO WATCH
AREA TO WATCH |
ACTION TO BE TAKEN |
The number of staff absences due
to sickness. Q1 0
2003-04 |
Monitoring of data &
application of Council policies & procedures
in respect of attendance management |
Q2-
2003-04 |
Slight decrease in number of days
lost per employee but line managers need to improve their attendance
management of staff. HR staff to identify ‘hot spots’ and advise Directorate
Management Teams |
Q3-
2003-04 |
New regime being put in place to
monitor managers’ performance in terms of absence reporting procedure in an
attempt to improve the speed of information update. Also widening managers’ on-line
access to sickness reports. This quarters figures up on last two as would be
expected as historically November and December
have higher levels of absence. |
Q4-
2003-04 |
Marginal increase compared to
2002-03 (9.3 COMPARED WITH 9) Continued monitoring and awareness
raising with line managers and action to tackle and address long-term
sickness. |
Q2 –
2004-05 |
Marginal
decrease in absence but need for line managers to continue regular monitoring
and application of policies |
ACTION PLAN
PROPOSED ACTION |
DATE EXPECTED |
Outcome |
Monitoring
and management of sickness occurrences with a focus on long-term sickness
occurrences |
Implemented
ongoing reviews |
Effective
management of long standing sickness absence |
Management
Training handling sickness absences, managers aware of their responsibilities
and staff also aware of what is expected of them. Human
Resources – including the management of sickness is a key component |
Management
training is available. Implemented
and is ongoing |
Managers
are skilled & equipped to effectively manage resources |
On-line
sickness notification system |
Expected
by March 2005 |
Enhanced
and more effective reporting and management |
Review of
the services offered and available from Occupational Health |
Twice
yearly |
Improved
quality of service offered to Council and staff sick |
Review
the outcomes of the Stress Filter Survey and consider options |
December
2004 |
Happier
land healthier workforce |
Healthy Workforce Strategy |
Yearly |
Happier
and healthier workforce |
Directorate
& Service level sickness occurrences monitored and reviewed |
Monthly
Management reports Quarterly reports to Directorate Management Teams – in
place |
Strategic
monitoring |
Investigate
the causes of sickness within and across the authority, to identify potential
common trends – Monday/Friday – Flu etc |
Monthly
Management reports Quarterly reports to Directorate Management Teams – in
place |
Strategic
monitoring |
PLANNING SERVICES – AFFORDABLE HOUSING
QUARTERLY REPORTING – AREAS TO WATCH
AREA TO WATCH |
ACTION TO BE TAKEN |
Q1 – 2003-04 Relatively low yield
of affordable housing on qualified sites (KPI 6). |
Detailed meeting with Head of
Housing Services. Section 106 training organised - July 2003. Masterplan consultants
now appointed for Pan. |
Q2 –
2003-04 |
A further meeting will be
organised on affordable housing field with Chief Executives of Housing
Associations in November 2003. |
Q3 –
2003-04 |
The meeting with Chief Executives
of Housing Executives was held in December 2003. Agreement was reached on how
to proceed. Further work is ongoing to produce Supplementary Planning
Guidance linking to the revised Housing Needs Study. |
Q4 –
2003-04 |
Detailed work has been undertaken
by consultants working for Housing Services.
This will be incorporated in the Section 106 protocol. |
Q1 –
2004-05 |
The
revised guidance on affordable housing issues, and the adoption of Supplementary
Planning Guidance on Section106 issues should assist improved delivery. |
Q2 –
2004-05 |
The
Section 106 Agreement package is being finalised, and will be a key component
of the negotiations undertaken by the Development Control Team. The overall issue of a lack of affordable
housing on the Island remains an area of concern for the Council |
PROPOSED ACTION PLAN
PROPOSED ACTION |
DATE EXPECTED |
OUTCOME |
Section
106 Agreement proposals are due to be
taken to Executive Committee |
8
September 2004 |
Better
use of S106 agreements on the Island |
Preparation
of the Local Development Framework (LDF) |
Draft LDF
– ? Final
Version ? |
Review of
Affordable Housing Policy |
Continual
monitoring of the number of
affordable units negotiated, units built, commuted payments received |
Monthly
planning monitor Quarterly
DMT/QPMR BVPI |
Identify
progress and potential review of actions taken |
UPDATE –
Proposal is to set up a Strategy Group with Housing Services, Planning
Services, Housing Associations and Economic Development to seek improvements to
affordable housing issues on the Island and report back to Executive in due
course. |
TRANSPORT – COMPLETION OF BRIDGE INSPECTIONS
QUARTERLY
REPORTING – AREAS TO WATCH
AREA TO
WATCH |
ACTION TO
BE TAKEN |
Q1 – 2003-04 Completion of bridge inspections
within the prescribed time scale. |
Consideration should be given to a
revenue budget increase so additional resources can be employed. |
Q2 –
2003-04 |
Still some concerns |
Q3 –
2003-04 |
No increase in budget within the
present financial year so concerns remain. |
Q4 –
2003-04 |
Bridge and other highway structure
inspections not completed. A Resource Bid of £259,000 was made for 2004/05,
£255,000 for 2005/06 and £245,000 for 2006/07 but this was not approved.
Therefore mandatory inspection timetable will not again be met in 2004/05 financial year. |
Q1 –
2004-05 |
No
increase in revenue budget – capitalisation from highway maintenance only way
of addressing problem in this financial year. |
Q2 –
2004-05 |
Consideration
should be given to a revenue budget increase so additional resources can be
employed. No increase in revenue budget – capitalisation from highway
maintenance only way of addressing problem in this financial year. |
ACTION PLAN
PROPOSED ACTION |
DATE EXPECTED |
OUTCOME |
Additional
Revenue bids have been made to undertake the inspection programme |
Bid
rejected in 2004-05 – Additional bid submitted for 2005-06 |
Inspections
occur |
Review
the capacity and skills within the Engineering Service to undertake work |
January
2005 |
Internal
work review |
If the
budget bid is refused then the Service will need to consider capitalisation
of the highway maintenance budget to acquire resources |
To be
considered if the new budget bid is unsuccessful |
|
PROPERTY SERVICES – VANDALISM TO COUNCIL PROPERTY
QUARTERLY REPORTING – AREAS TO WATCH
AREA TO WATCH |
ACTION TO BE TAKEN |
Q1 – 2003-04 Crime & Disorder – in relation to vandalism to council buildings. |
Crime & Disorder task group
coordinating a multi agency approach to crime & disorder |
Q2- 2003-04 |
Continuing to monitor impact of
vandalism on resources & liaise with task group |
Q3-
2003-04 |
Monitor trends & liaise with
task groups & police |
Q4-
2003-04 |
Vandalism on the Island is
continually highlighted as high risk and spend
is increasing in this area. It is not
isolated to one area of the Island, therefore
controlling vandalism is difficult. |
Q1-
2004-05 |
Continuing
to monitor trends & liaise with
task groups & Police |
Q2-
2004-05 |
Crime and
disorder and in-particular vandalism to Council Property remain a key concern
for the Property Services Team.
Continuing to monitor trends
& liaise with task groups & Police |
Potential
improvements that could enhance the service: –
PROPOSED ACTION PLAN:
PROPOSED ACTION |
DATE EXPECTED |
OUTCOME |
Crime
& Disorder Task Group established to monitor the problem, develop an agreed
strategy to tackle the problem |
Bid
rejected in 2004-05 – Additional bid submitted for 2005-06 |
Strategy
& Co-ordination |
Investigate
the possibility of a telephone hotline service |
March
2005 |
Rapid
reports and repairs |
Area
based inspection teams to monitor and check at risk property and facilities |
|
Monitoring |
Increased
stakeouts and enforcement where repeat incidents are occurring |
|
Prosecutions |
Improved
design guides to reduce the potential for vandalism – designing out crime |
|
|
UPDATE –
there is a need to get the joint working partnership group established to
develop a clear strategy and action plan for this issue. Greater work needs to be done in
partnership with the Police and Community Safety (Crime & Disorder Team)
to report and reduce vandalism occurring.
Corporate Policy are able to help develop the joint group and assist
in the delivery of the action plan |
APPENDIX 4
ISLE OF WIGHT ECONOMIC PARTNERSHIP
MANAGING DIRECTOR’S REPORT
September 2004
Introduction
Activity
during this period has mainly concentrated on the re-structure of the Company.
Other highlights have included delivery of the AIF Performance Plan, Cowes Week
and of course the success of "team
Isle of Wight" at the recent Athens Olympics.
Re-structure
update
At
the previous Board meeting on the 15th July, the Board approved
the 3 phase Company Re-structure Proposal. Phase 1 was due for completion by the end of September; to date
we have completed the following:
-
3 posts confirmed as
being redundant (2 voluntary)
-
2 posts transferred
(TUPE'd) to Ryde Development Trust
-
3 posts reduced by
'natural wastage', 3 resignations to take up alternative employment.
-
Temporary relocation
into a single unit. Full re-location by
the end of September
-
Closure of our Cowes
office by the end of September
We
are therefore broadly on plan.
Area
Investment Framework:
We
have submitted the final copy of the AIF Performance Plan for SEEDA's devolved
funding. SEEDA still has some concerns, mainly over the relationship between
the Area Investment Framework and the Local Strategic Partnership; however, we
have received confirmation from them that they are willing to sign our contract
by the end of September.
We
have also submitted a draft 3 year funding proposal for both SEEDA's direct and
devolved funding. Due to time pressures
from SEEDA, we have only been able to consult with Derek Rowell and the Vice
Chair of the LSP, William Shaw. We have
reflected the Investment Priorities as established by the AIF, whilst
building in some flexibility to allow for change over the 3 year period.
Cowes
Waterfront
Cowes
Waterfront is the overall initiative for the development and investment in the
Medina Valley and as such includes Cowes, East Cowes & Newport. The Initiative will be delivered by a number
of projects, eg East Cowes Project, Newport Harbour Project, PAN Project etc
etc. We will attempt to include all
mainstream projects within the area, regardless of which organisation is
leading. This ensures consistency
throughout and better communication to the public.
Stage
2 of the East Cowes master-plan is being completed with a public consultation
in East Cowes Town Hall from 17th -18th September. A further newsletter has been sent out to 10,500 local residents
informing them of progress.
The
team hosted several events during Cowes Week aimed at promoting Cowes
Waterfront to, developers, statutory bodies and local stakeholders.
Branding
'Inspire'
With
the AIF Performance Plan now submitted we will shortly be submitting our
Branding proposal. With multi-agency
support, including the Full Council, the LSP and SEEDA, we anticipate
being able to access the monies during October 2004. This is a vital piece of work for the Island and will lead to a
much improved image as well as significantly improving our investment
prospects.
GOLD medal
As part of our Branding strategy we have developed "team Isle of Wight",
promoting the Island as 'gold' standard. Our support for Shirley
Robertson and her crew has reaped a massive return on our investment. As the winner of Team GB's first gold
medal at the Athens Olympics; the coverage across all aspects of the media
for the Isle of Wight, has run into several hundreds of thousands of
pounds. We will be writing a detailed report highlighting the benefits
and coverage achieved to date.
Innovation
Centre/Enterprise Hub
Our
marketing strategy aimed at bringing new tenants into the Innovation Centre is
beginning to show fruit. We are currently in negotiation with 5 new
companies seeking accommodation and are close to completing negotiations
with an existing tenant seeking larger office space.
Two
of our graduate companies, Criterion and Solent Composites, have now found
accommodation in Venture Quays as part of the “interim letting strategy” for
Cowes Waterfront.
We
have also completed on a new inward investment for the Island, with the
re-location of Sealift Ltd in to Venture Quays. Sealift, a boat hoist
manufacturer, currently employ 6 people, but are due to add a further 4
employees over the next few months.
Enterprise
House
The
Council are due to sign a new lease on the building and move their Highways
dept in during November.
PSA Targets
We
continue to make good progress with PSA 3 and are well ahead of profile. PSA 11, job creation for the over 50's,
continues to be of concern. We are
writing a proposal as to how to take the target forward.
We
have raised these issues with various contacts within the Council including
their PSA - Audit Officer.
Healthy
Living Programme (HLP)
There is no funding available to sustain the HLP as a
stand-alone programme beyond March 2005.
Only one of the projects currently receiving HLP funding has definitely
secured further funding to continue beyond March 2005. Discussions have taken place with the
Primary Care Trust and IW Council (Social Services) about sustaining the HLP
ethos and individual projects, and the issue will also be raised at the LSP
‘Health’ Theme Group. However the PCT
has no funding available and it is not clear that any funding will be available
via IW Council.
Leader +
The
extra £135,000 secured, as reported to the Board in June, has been utilised and
will be spent by April 2005.
The
Action Plan for the remainder of the programme (2005-2008) has been submitted
by the LAG to GOSE for consideration.
Market Towns Initiative (MTI)
Existing
towns – Sandown, Shanklin and Ventnor are continuing to progress their existing
programmes towards completion early in 2005/06.
The
new MTI programme is to be known as the Small Rural Towns Programme and the
Island is eligible to access £330,000 over the next 7 years. East Cowes, Wootton and Brading are
currently working up their proposed bid towards a single project for each
town. (SEEDA are seeking one project
per town in this round rather than a clutch of small projects.)
Single Regeneration Budget (SRB)
The
Delivery Plan for 2004/05 has been agreed and signed by SEEDA and also approval
to the Ryde Town Improvements project, which will encompass the Public Realm
Strategy work, has been received from the SEEDA Board. Work will continue to ensure we have a
strategic, co-ordinated approach to the activity in the town and we already
have a design brief in place through the Public Realm Strategy.
The
carnival this year was bigger than previous event:
Given
that this year the mainland school term had started, these early figures are
good.