PAPER B

 

ENVIRONMENT AND TRANSPORT SELECT COMMITTEE

 

QUARTERLY PERFORMANCE MANAGEMENT REPORT 4

 

REPORT OF THE DEPUTY LEADER AND PORTFOLIO HOLDERS

 

REASON FOR SELECT COMMITTEE CONSIDERATION

This Quarterly Performance Management Report is for the period 1st January to 31st March 2004 and is for the Environment and Transport portfolios. This fourth report for 2003/04 was considered at the Council’s Executive on the 2nd June 2004.

 

 

ACTION REQUIRED BY THE SELECT COMMITTEE

  1. To receive the Quarterly Performance Management Report insofar as it relates to the Environment and Transport Portfolio Holders responsibilities

 

  1. Determine whether further information is required from the Portfolio Holder on the two long-term Areas to Watch detailing scope of concern, background and proposals to improve as set out in paragraph 5

 

  1. To determine whether to add or amend the work programme of the Select Committee in light of the Quarterly Performance Management Report and any additional information received.

 

 

BACKGROUND

1.      This Report for Quarter 4 summarises performance for the responsibilities under the Portfolio Holders for Environment and Transport for the quarter ended 31st March 2004. Some information is estimated and it should be appreciated that budget information is not for the full financial year 2003/04, due to possible amendments as part of the closedown procedures.

 

                             2.   This quarter also includes achievements and ongoing activities from the Annual

      Action Statement and the CPA Improvement Plan. Ongoing and in progress actions

      and activities will be carried forward to the Annual Action Statement for 2004/05.

 

3.      Feedback from the previous Environment and Transport Select Committee when the Performance Management Report for quarter 3 was discussed have been taken on board including:

·        Highlighting if  the relevant performance indicators are set nationally or locally-this will be included in the new basket of key performance indicators from quarter 1 2004/05

·        Exception reporting of performance indicators-Members of the Select Committee can, if required, receive for scrutiny the annual Best Value Performance Plan which records all national and local indicators for the Council

·        Provide more up to date information-a software package is currently being specified that will enable the process of collecting and reporting data more efficient. Meanwhile, Heads of Service can, if required provide a verbal update on issues within the report at the meeting

 

4.      Significant progress has been made on the targets and activities within the Portfolio

      Holders responsibilities including:

·        Successful bid achieved for £1.2m to carry out remedial work to drought damaged carriageways

·        Completion of Seaview Duver Coastal Defence scheme

·        Achievement of Public Service Agreement target for 2003/04 for increasing the number of cycling trips

·        Achievement of target for number of businesses enrolled on Island Green Award Scheme for 2003/04

      

5.      However, there are concerns on the following:

·        Completion of bridge inspections-this has been reported as an Area to Watch for in all 4 Quarterly Performance Management Reports for 2003/04-page 6

·        Meeting local transport targets for bus patronage-also reported as an Area to Watch in all 4 Quarterly Performance Management Reports for 2003/04-page 7

·        Possible budget overspends on Highways and Coastal Protection-full update at the meeting-page 13

 

RELEVANT PLANS, POLICIES, STRATEGIES AND PERFORMANCE INDICATORS

Best Value Performance Plan 2002/03

Annual Action Statement 2002/03

Quarterly Performance Management Report 4

 

CONSULTATION PROCESS

Heads of Service and their staff have supplied the information within the Quarterly Performance Management Report, with Directors being fully consulted on the content.

 

External consultation has not been necessary for this report as it is concerned with internal financial management arrangements.

 

FINANCIAL, LEGAL, CRIME AND DISORDER IMPLICATIONS

The report itself does not have any financial implications. However, if Members recommend decisions regarding services identified in this report, these may have financial implications.

 

It is a requirement of the Local Government Act 1999 to deliver best value in service delivery of which an effective performance management system is a significant part.

 

APPENDICES ATTACHED

Appendix 1 Quarterly Performance Management Report 4

 

BACKGROUND PAPERS USED IN THE PREPARATION OF THIS REPORT

Annual Action Statement 2003/04

Comprehensive Performance Assessment Action Plan

Quarterly Performance Management Reports 1, 2, 3 and 4

 

Contact Point : Heidi Marshall, Principal Policy Officer, 823250 [email protected]

 

 

PETER HARRIS – Deputy Leader; ERNIE FOX – Portfolio Holder for Transport and TERRY BUTCHERS – Portfolio Holder for Sustainable Development


APPENDIX 1

 

 

 

 

 

 

 

 

 

 

 

ISLE OF WIGHT COUNCIL

 

QUARTERLY PERFORMANCE MANAGEMENT REPORT

SELECT COMMITTEE REPORT – ENVIRONMENT & TRANSPORT

 

 

 

 

 

 

 

 

FOURTH QUARTER – 1ST JANUARY TO 31ST MARCH 2004

 

 

 

 

 

 

 

 

 

 

Quarterly Performance Management Report

Select Committee Report – Environment & Transport

Quarter 4 January – March 2004

           

 

 

Contents                                                                                                          

 

           

Section 1 :        Summary                                                                                                                                  Page     3 - 4

1.1               Performance Summary:

·         Performance Indicators – KPI’s & PSA Targets

 

1.2               Priority Improvement Areas                                                                                             Page     4

1.3               Best Value Reviews                                                                                                       Page     4

           

                                                     

Section 2 :        Performance Management & Assessment                                                                                    Page     5                                                                        Transport                                                                                                                                  Page     6 - 9

Sustainable Development, Environment & Planning Policy = Environment                           Page     10 - 11

                       

Including information on the following areas

·         Key Achievements for the Quarter                                                                                              

·         Areas to Watch and action to be taken                                                                                                   

·         Updates on Areas to Watch reported in Q1 – Q2 – Q3                                                                       

·         Performance Management Indicators – KPI’s & PSA Targets                                                             

     

 

Section 3 :        Corporate Actions                                                                                                                      Page     12

                        Summary report of those key actions achieved and those that are on-going, as of  the 31st March 2004.

           

 

Section 4 :        Finance Report                                                                                                                          Page     13                       

         Revenue & Capital Report

 


SECTION 1 : Summary - Quarterly Performance Management Report - Q4 (January to March 2004)

 

Performance Summary :–

1.1       Performance Indicators

Summary provides information for all of the Performance Indicator Targets by Portfolio for the past year 2003-04

The first table presents those Performance Indicators that refer to the Select Committee.  There are 10 indicators:

 

 

Performance Indicators by Type

 

 

No. of Indicators

Target Achieved

Target Not Achieved

Information Not Provided

DELETED INDICATORS

KPI Basket Targets

·         Environment

·         Transport

 

2

4

 

2

1

 

0

1

 

-

-

 

-

2

Public Service Agreement Targets

·         Environment

·         Transport

 

0

1

 

0

1

 

0

0

 

-

-

 

-

-

Annual Action Statement Targets

·         Environment

·        Transport

 

1

2

 

1

0

 

0

2

 

-

-

 

-

-

 

TOTAL

10

5

(50%)

3

(30%)

-

2

(20%)

 

Table 2 provides a snapshot of all of the 58 performance indicators and presents these against the relevant corporate objective.

 

Performance Indicators by Corporate Objective

 

Corporate Objective

No. of Indicators

Target Achieved

Target Not Achieved

Information Not Provided

DELETED INDICATORS

Improving health, housing and quality of life for all

9

 

2

(22%)

7

(78%)

0

(0%)

-

Encouraging job creation & prosperity

5

 

 

4

(80%)

1

(20%)

0

(0%)

-

Raising education standards and promoting lifelong learning

 

8

 

6

(75%)

2

(25%)

0

(0%)

-

Creating safe & crime-free communities

8

 

 

6

(75%)

2

(25%)

0

(0%)

-

Improving public transport and the highways infrastructure

7

 

2

(28.6%)

3

(42.8%)

0

(0%)

2

(28.6%)

KPI 19-20

Protecting the Island’s physical environment

6

 

 

6

(100%)

0

(0%)

0

(0%)

-

IWC Corporate Health

15

 

7

(46.6%)

7

(46.6%)

1

(6.7%)

-

 

TOTAL

58

33

(56.9%)

22

(37.9%)

1

(1.7%)

2

(3.5%)

 

 

 

1.2       Priority Improvement Areas 

Through the CPA process last year, there were a number of service areas that were highlighted as areas for improvement. To progress these areas for improvement and identify support needed from across the Council a framework has been devised beginning with initial briefing sessions to help scope the area for support and improvement. Action Plan summaries will then be produced, monitoring of which will be through this section in the Quarterly Performance Management Report.

 

·         Engineering Services – Highways

Although great progress has been made during 2003/04 in improving the efficiency and performance of the department (including the gaining of Investors in People status and the introduction of a Quality Management System) and improving communications both with our customers/stakeholders and internally (including the publication of a ‘family’ of 15 leaflets and web site improvements) lack of sufficient Revenue budget prevents the much needed improvements to the highway infrastructure being undertaken. Private Finance Initiative is being progressed following allocation of budget for 2004/05.

 

 

1.3      Best Value Reviews

 

·         Transport

Consultation, on what are considered to be the main Transport issues, has been carried out with a range of providers, users, officers and Members. This will help to develop the scope of the work, so that the review itself can begin.

 

 

SECTION 2 : PERFORMANCE MANAGEMENT & ASSESSMENT – BY PORTFOLIO

 

This section of the report shows the progress and achievements that have been made in each of the Portfolio’s of the Council.  The report records and demonstrates:

 

 

 

How are targets judged?

 

Has the Target been achieved?:

 

-          will be ‘yes’ if the year end target has  been met/achieved. (This applies to most targets, some may work differently).

-          will be ‘no’ if the target has not been achieved

 

The comments box can be used by services to explain data. Some targets compare themselves with the same quarter a year ago to eliminate effects of seasonality.

 

Level of performance against previous quarter:  

·        will be ‘lower’ if the level of performance is 10% or more lower than previous quarter                       î

 

Assessment of Performance for the Year

Compares the actual performance to the Target for year end:        

J Indicates that the target is achieved or exceeded

L Indicates that the target is not achieved

 

Year end Actual

      This figure is expressed as either:

·         the cumulative Total for the year  - (Q1+Q2+Q3+Q4)

·         or, the Average for the year – (Q1+Q2+Q3+Q4) divided by 4

 

            PORTFOLIO:                                   Transport 

CORPORATE OBJECTIVE:         Improving public transport & the highways infrastructure

 

 

KEY ACHIEVEMENTS QUARTER 4

Portfolio – Transport

Corporate Objective – Improving public transport & the highways infrastructure

 

  • Successful bid for £1.2m to carry out remedial work to drought damaged carriageways.

 

  • Completion of Seaview Duver Coastal Defence Scheme

 

 

QUARTER 4 - AREAS TO WATCH

Areas to Watch

Action taken / to be taken

Insufficient highway maintenance Revenue budget.

Only possible to undertake emergency repairs and very urgent works. Without additional Revenue financial resources highway network will continue to decline with attendant increase in insurance claims.

Under achievement on highway inspections.

Funding available in 2004/05 for additional inspection staff which should improve the present situation.

 

 

 

 

 

 

AREAS TO WATCH – UPDATES FROM THE PREVIOUS QUARTERS

 

 

AREA TO WATCH

ACTION TAKEN

PREVIOUS QUARTERLY UPDATE

NEW UPDATE QUARTER 4

Q1

Q2

Q3

Q4

Completion of bridge inspections within the prescribed time scale.

Consideration should be given to a revenue budget increase so additional resources can be employed.

No increase in budget within the present financial year so concerns remain.

Bridge and other highway structure inspections not completed. A Resource Bid of £259,000 was made for 2004/05, £255,000 for 2005/06 and £245,000 for 2006/07 but this was not approved. Therefore mandatory inspection timetable will not again be met in 2004/05 financial year.

Q2

Q3

Q4

Insufficient highway maintenance revenue budget. Particular concerns regarding repairs due to summer clay shrinkage

 

An increase in budget

 

Lack of budget is causing a noticeable decline in the condition of the highway network. Capital monies have been transferred to cover cost of repairing heat-damaged roads.

Included in ‘Areas to Watch’ above. Funding for 2004/05 will still be insufficient.

Q1

Q2

Q3

Q4

Meeting of Local Transport Plan Targets for bus patronage.

At present continue to monitor head counts.

 

 

Slight decrease in patronage (-0.5%) compared to same quarter last year. However there is still a possibility that end of year target will be met.

Final figures awaited from Southern Vectis. There is an increase in patronage over 2002/03 but this may still be below the target increase.  Nationally, bus patronage figures are in decline.

Q3

Q4

 

Under achievements on highway inspections.

Additional inspection staff required to meet the agreed inspection regime

 

 

Included in ‘Areas to Watch’ above. However funding for additional inspection staff in 2004/05 should improve the situation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Corporate Priority

(Corporate Plan 2002 to 2005)

KPI Description

Actual

2002 / 3

Q1

Apr-Jun

2003

Q2

July-Sep

2003

Q3 

Oct-Dec

2003

Q4 

Jan-Mar 2004

Target

2003 / 04

Performance assessment for the year

 

Year end Actual

Comments

 

Performance against the previous Quarter

Target Achieved

Maintaining the highways infrastructure

 

18.  % of incidents of reported dangerous damage to roads & pavements this quarter made safe within 24 hours

97%

 

 

100%

100%

100%

100%

 

98%

 

J

Average = 100%

100% of incidents made safe within 24 hours.

 

è

è

è

Yes

Promoting public transport

 

21. Passenger journeys on Local bus services  (data 1 quarter in arrears)

5,54 million

1.20 million

(Jan to march 03)

 

1,4 million

1,719,487

(July to Sept 03)

1,284,986

(Oct to

Dec 03)

5.66

million journeys

L

Total = 5.605 million

Although below target, numbers have shown an overall increase.  Nationally bus journeys are decreasing & subsequently the IWC have revised LTP targets to recognise the national trend.  This 1.1% increase illustrates that we are on track to meet this revised target.

 

 

ì

ì

î

No

PERFORMANCE MANAGEMENT INFORMATION – KEY PERFORMANCE INDICATORS

 

 

 

The two cycling KPI’s previously reported have been replaced by the PSA Target 10 (page 30) – Increase the number of cycling trips, as the quality and accuracy of the data is more reliable.

 

 

 

 

 

 

PROGRESS TOWARDS PSA TARGETS

Corporate Objective

 

PSA Target

 

PSA Target Summary

 

Q1 Data

 

Q2 Data

 

Q3 Data

 

Q4 Data

 

Year Target

Comments

Target Achieved

Transport

 

 

 

 

 

10.  Transport

Increase the number of Cycling Trips

50,667 trips this quarter

73,672 trips this quarter

32,061

(32,732)

 trips this quarter

 

32,792

trips this quarter

121,800

The new officer commenced employment on 01/03/04.  The Council are planning to investigate the feasibility of automatic counters during the next quarter.

Q3 figures have been revised to reflect data received since last return. This indicator data is based on a different and more acceptable calculation than the KPI’s.

Achieved = 189,192

 

Yes

 

 

The DFT acknowledge our methodology for measuring cycling and walking is best practice and is a model that other Local Authorities are now following.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

            PORTFOLIO:                                   Sustainable Development, Environment & Planning Policy

CORPORATE OBJECTIVE:         Protecting the Island’s physical environment

 

KEY ACHIEVEMENTS QUARTER 4

 

Portfolio - Sustainable Development, Environment & Planning Policy

Corporate Objective - Protecting the Island’s physical environment

 

  • Completion of a sustainable energy feasibility study for Pan Village development.
  • Establish the Island Warm Homes Group to tackle fuel poverty.
  • Green Island Awards achieved years target and held a successful Awards ceremony

 

 

 

QUARTER 4 - AREAS TO WATCH

None relevant to this Select Committee

 

 

 

AREAS TO WATCH – UPDATES FROM THE PREVIOUS QUARTERS

None outstanding for this Select Committee

 

 

 

 

 

 

 

 

 

Corporate Priority

(Corporate Plan 2002 to 2005)

KPI Description

Actual

2002 / 3

Q1

Apr-Jun

2003

Q2

July-Sep

2003

Q3 

Oct-Dec

2003

Q4 

Jan-Mar 2004

Target

2003 / 04

Performance assessment for the year

 

Year end Actual

Comments

 

Performance against the previous Quarter

Target Achieved

Promoting sustainable service delivery

22. Number of businesses enrolled on Island Green Awards Scheme

*Total for each quarter is a running total and includes the 2002-03 outturn figure

21

24

36

51

57

55

J

Total = 57

Only 40 have so far been fully accredited due to time needed to implement work

 

 

 

ì

ì

ì

Yes

Making best use of natural resources & cutting waste generation

25.  Percentage of household waste recovered & not sent to landfill (includes recycled waste, waste composted & waste used for energy recovery)

47.8%

50.2%

51%

48%

51.02%

52%

J

Actual = 50.1%

Target marginally achieved

 

è

è

è

Yes

 

PERFORMANCE MANAGEMENT INFORMATION – KEY PERFORMANCE INDICATORS

 

 

 

PERFORMANCE MANAGEMENT INFORMATION – PSA TARGET

Not applicable for this Portfolio

 

 

 

 

 

 

 

 

 

 

 

SECTION 3 : CORPORATE ACTIONS

 

Significant progress has been made on the Corporate Actions, which includes the Comprehensive Performance Assessment (CPA) Improvement Plan, Annual Action Statement Actions and Actions in response to the District Audit Letter.  This section of the Report records the highlights some of the key actions that have been achieved by the 31st March 2004 and those that are on-going through 2004-05.  A full listing of all of the Corporate Actions that are on-going and to be carried forward through 2004-05 will be available for viewing on the Council’s Intranet at the following link: direction/performance/quarterly performance management reports/

 

CPA Improvement Plan Actions – None identified for Environment & Transport

 

 

Annual Action Statement Actions by Directorate

 

ENVIRONMENT

Achievements

 

Not achieved by the 31st March and to be carried forward into 2004-05

 

Actions in response to the District Audit Letter – None identified for Environment & Transport

 

SECTION 4 : FINANCE REPORT

4.1 : Revenue Budget Monitor by Portfolio – to the end of March 2004

 

Transport

 

Highways

Budget pressure areas are principally within highway maintenance where the combination of a reduced budget and adverse weather conditions are likely to result in an overspend in the region of £200,000.

Walking/Cycling

On target, despite the adverse weather conditions which have had an impact on the Rights of Way and cycling networks, where serious flooding during the winter led to emergency repairs being necessary or temporary closure in some cases.

Public Transport

Overspend of £148,000 currently predicted in the concessionary fares budget, arising as a result of a change in legislation related to age equalisation.

Cowes Floating Bridge

On target at year end.

Transport Fleet

On target at year end.

Car Parking

Current figures indicate a that there is likely to be an over-recovery against budget of car parking income of some £200,000 which may be used to offset some of the highways and transport related overspends outlined above.

Sustainable Development, Environment and Planning Policy

 

Environmental Initiatives including Local Agenda 21

Both the Local Agenda 21 budget and the Environmental Initiatives budget are on target at present – the budgets now include environmental projects where external financial assistance has been approved to augment existing services (e.g. LIFE Response, Green Awards).

Building Control

On target. Income from fees has exceeded expectations.

Coastal Management

Overspend anticipated.  As is the case for the highway maintenance budget, the effects of adverse weather conditions have had an impact on cliff stability, requiring expenditure on emergency remedial works of £25,000, plus geotechnical fees of £20,000 to provide a report on further works which may be necessary as a result of the winter’s wet weather. The results of this report may have implications in future years and may have ongoing implications, including consideration of an increased maintenance budget.

Harbours and Seafronts

Newport Harbour and foreshore budgets on target at present – possible deficit of £10,000 on the operational costs of Ventnor Haven due to management fees incurred in a period when income generation has been low.

Engineering Contracts

Main engineering contracts for street cleansing and public convenience cleansing on target at present.

Waste Management

Waste management budgets on target at present – green waste contractual dispute with Island Waste Services now likely to go to full arbitration. A likely budget pressure area, landfill tax, is on target to be contained within budget.

 

4.2 : Capital Expenditure

 

A list of capital spending against budget in 2003-04 on a summarised version for the services provided by this Select Committee is available by clicking on the following link:

 http://wightnet2000.iow.gov.uk/directorates/finance/finance_business_services/images/OldYearExecComCapitalByCommitteeReport.pdf

 

Fuller details, on a project by project basis, are also available on the Financial Services intranet pages.