Transport Capital
Summary Report with Comments as at 31 October Appendix
2
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
A3020
Strategic Corridor - Newport To Cowes
8HGA A3020 CTNSC -
Carriageway Works £0 £0 £718,550 £715,214 £0 £3,336
8HGB A3020 CTNSC -
Footway Works £0 £0 £59,771 £55,432 £1,748 £2,591
8HGC A3020 CTNSC - Bus
Infrastructure Works £0 £0 £25,000 £21,728 £621 £2,651
8HGD A3020 CNTSC -
Street Lighting Works £0 £0 £20,543 £7,575 £0 £12,968
8XC1 Cowes-Newport
Strategic Corridor £650,000 £11,135 £0 £7,521 £0 -£7,521
Total
for Group £650,000 £11,135 £823,864 £807,470 £2,369 £14,025
A3021
Strategic Corridor - Newport to East Cowes
8H6H Advce Desgn
Newport to Cowes and E Cowes £0 £0 £0 £2,427 £0 -£2,427
Cor
8HG1 A3021 ECTRC SC -
Carriageway Works £0 £0 £167,444 £153,974 £0 £13,470
8HG2 A3021 ECTRC SC -
Footway Works £0 £0 £27,729 £21,096 £990 £5,643
8HG3 A3021 ECTRC SC -
Street Lighting Works £0 £0 £14,695 £5,001 £0 £9,694
8HG4 A3021 ECTRC SC -
Bus Infrastructure Works £0 £0 £5,326 £5,887 £215 -£776
8XC2 East Cowes to
Racecourse SC - DO NOT USE £500,000 £234,807 £0 £0 £0 £0
Total
for Group £500,000 £234,807 £215,194 £188,385 £1,205 £25,604
A3054
Strategic Corridor - Newport to Ryde
8H50 A3054 RTNSC -
Carriageway Mtce (Inc A-Skid) £0 £0 £26,222 £362 £26,063 -£204 Works complete. Commitment is retention.
8H51 A3054 RTNSC -
Footway Mtce (Inc T-Paving) £0 £0 £1,533 £831 £1,233 -£532 Works complete. Commitment is retention
8H52 A3054 RTNSC -
Street Lighting £0 £0 £0 £453 £0 -£453
8H53 A3054 RTNSC -
Wootton Bridge £0 £0 £0 £617 £0 -£617 Complete.
8H54 A3054 RTNSC -
Newport Tunnels Graffiti £0 £0 £409 £1,764 £409 -£1,764 Tunnel 1 complete
Total
for Group £0 £0 £28,164 £4,028 £27,706 -£3,570
A3054
Strategic Corridor - Newport to Yarmouth
8H60 NTYSC - Yarmouth
Bridge (Phase 3 of 5) £0 £0 £44,788 £22,835 £8,239 £13,713
8H61 NTYSC - Bettyhaunt
Lane £0 £0 £5,653 £95 £5,653 -£95 Complete
8H62 NTYSC -
Carriageway Maintenance £0 £0 £5,717 £13,824 £5,717 -£13,824 Complete
8H63 NTYSC - Footway
Maintenance £0 £0 £1,950 £1,537 £1,950 -£1,536 Complete
14 November 2003 Page 1 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
Total for Group £0 £0 £58,108 £38,291 £21,559 -£1,743
Newport
Town Centre Traffic Management
8XY1 Newport Town
Centre Traffic Mngmnt £0 £0 £423,705 £126,492 £128,798 £168,415
Total
for Group £0 £0 £423,705 £126,492 £128,798 £168,415
Ventnor
Ground Investigation
8XT1 Ventnor Ground
Investigation £0 £0 £0 £0 £195 -£195
Total
for Group £0 £0 £0 £0 £195 -£195
A3055
Undercliff Drive Diversion Works
8XU1 Undercliff Drive -
Beauchamp House £0 £0 £0 £50,424 £0 -£50,424 Main contract complete. Additional works & further
investigations – budget to be resolved
Total
for Group £0 £0 £0 £50,424 £0 -£50,424
Structural
Maintenance of Principal Roads
8HW1 Advance
Design-Undercliff Dr 0304 £0 £0 £100,000 £152,410 £0 -£52,410
8XBK 98/99 - A3055
Military Road Project £1,850,000 £0 £2,753,422 £1,885,651 £117,096 £750,674 Work commenced 6 Jan 03.
Total
for Group £1,850,000 £0 £2,853,422 £2,038,062 £117,096 £698,264
Structural
Maintenance Of Carriageways
8H1C 01/02/03 A3055
Sandown Road Lake £150,000 £0 £173,804 £2,571 £0 £171,233
8HY1 Dover Street Ryde £0 £0 £3,000 £0 £0 £3,000
8HY2 Medina Way Newport £0 £0 £3,000 £0 £0 £3,000
8HY3 Mill Hill Road
Cowes £0 £0 £3,000 £0 £0 £3,000
8HY4 Niton Road Niton £0 £0 £3,000 £0 £0 £3,000
8HY5 Whitehouse Road
Newport £0 £0 £3,000 £4,757 £0 -£1,757
8HY6 Residential Bus
Routes £0 £0 £3,000 £1,101 £0 £1,899
8HY8 Struct Mtce -
Princ Rds - due clay shrinkage £0 £0 £0 £0 £2,000 -£2,000
8XP2 00/01/02 A3055
Broadway Sandown - Widening £0 £0 £0 £372 £2,817 -£3,189
Total
for Group £150,000 £0 £191,804 £8,800 £4,817 £178,187
Surfacing
8H6G Carriageway
Overlays-Ryde & E Cowes £0 £0 £15,003 £11,530 £3,403 £70
14
November 2003 Page 2 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
Total for Group £0 £0 £15,003 £11,530 £3,403 £70
Insitu
Recycling
8H2A 01/02/03 Great
Preston Road Ryde (Part) £0 £0 £29,878 £4,837 £23,467 £1,574
8H2C 01/02/03 Minerva
Road East Cowes £0 £0 £332 £0 £332 £0 Complete. Commitment = retention
8H2D 01/02/03 Lamorbey
Road / James Avenue Lake £0 £0 £860 £0 £860 £0 Complete. Commitment = retention
8H2G 01/02/03 Newnham
Lane Binstead (West End) £0 £0 £663 £0 £663 £0 Complete. Commitment = retention
8H2J 01/02/03 Union Rd
/ St Johns Rd / George St £0 £0 £1,170 £0 £1,170 £0 Complete. Commitment = retention
8H2L 01/02/03 Rowlands
Lane Havenstreet North End £0 £0 £512 £0 £512 £0 Complete. Commitment = retention
Total
for Group £0 £0 £33,415 £4,837 £27,005 £1,573
Bridges
& Structural Maintenance
8H1H 01/02/03 Chilton
Chine £0 £0 £989 £63 £1,402 -£476
8H1J 01/02/03
Horringford £30,000 £0 £36,000 £1,767 £6,862 £27,371
8H1L 01/02/03 Wroxall £20,000 £0 £24,500 £861 £6,673 £16,966
8H1M 01/02/03 Gurnard £41,000 £0 £58,323 £4,246 £17,718 £36,359
8H1N 01/02/03 Caesars
Road Newport £0 £0 £1,500 £1,563 £0 -£63 Complete
8H1P 01/02/03 Betty
Haunt Lane Newport £0 £0 £8,490 £95 £8,490 -£95 Complete.
8H1Q Blacklands Bridge
(part insurance credit) £0 £0 £1,838 £127 £1,838 -£127 Complete.
8H1R 01/02/03 Calbourne
Lower Mill £7,000 £0 £13,500 £805 £6,079 £6,616
8H1V 01/02/03
Islandwide Bridges - Maintenance £0 £0 £9,084 £5,273 £3,277 £535 Ongoing
8HR1 Church Lane
Ryde-Retaining Wall Emerg Works £9,000 £0 £38,500 £38,362 £1,827 -£1,689
8HR2 St Albans Steps
Ventnor-Retaining Wall £20,000 £0 £21,200 £21,076 £486 -£361
8HR3 Kite Hill Wootton
- Retaining Wall Works £9,000 £0 £12,100 £10,380 £1,840 -£120
8HR4 Duver Rd Bridge St
Helens - Investigation Wk £5,000 £0 £5,900 £5,567 £0 £333
8HR5 Ashey Rd Ponda
Rosa Bridge - Safety Fencing £41,000 £0 £41,000 £921 £4,440 £35,639
8HR7 Structural
Maintenance - Bridges £49,000 £0 £46,466 £4,765 £838 £40,863
8HR8 Structural
Maintenance - Retaining Walls £19,000 £0 £5,000 £0 £0 £5,000
8XND 00/01/02 Afton
Bridge Freshwater - Reconstrt £0 £0 £706 £738 £0 -£32 Complete. Snagging prog April 2003
8XNG 00/01/02 Park Rd
Wootton Bridge and Rd Imprv £0 £0 £74,800 £25,392 £0 £49,408 Ongoing consultation, land acquisition
8XNH 00/01/02 Alresford
Rd Footbridge Shanklin £0 £0 £18,453 £16,749 £359 £1,346
8XNK 00/01/02 Islandwide
Structural Bridge Mtce £0 £0 £0 £815 £0 -£815 Ongoing
Total
for Group £250,000 £0 £418,349 £139,563 £62,127 £216,659
14 November 2003 Page 3 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
Pedestrian
Improvements
8H0B 01/02/03 Pelican
Crossings £0 £0 £2,798 £211 £2,798 -£212
8H0D 01/02/03 Disabled
Dropped Crossings £0 £0 £0 £333 £0 -£333
8H0K 01/02/03 Upgrade
Paths to Urban Standard £0 £0 £0 £0 £2,915 -£2,915
8HM2 Islandwide Dropped
Crossings £50,000 £0 £63,357 £18,635 £6,407 £38,315
8HM3 Fiveways Junction
- Ryde £50,000 £0 £22,500 £0 £0 £22,500
8HM4 Rights of Way
Signing £0 £0 £23,000 £8,317 £5,805 £8,878
8HM5 Newport Road
Lamorbey - Merrie Gardens £0 £0 £57,000 £0 £0 £57,000
8HM6 Eddington Road
Nettlestone £0 £0 £63,500 £0 £0 £63,500
8HM7 Ashey Road / Upton
Road (Ped. Improvements) £0 £0 £17,000 £538 £0 £16,462
8HM8 Baring Road Cowes
- New Footway £0 £0 £77,500 £6,444 £0 £71,056
8HM9 High Street
Wootton - New Footway £0 £0 £11,000 £0 £0 £11,000
8HMA The Mall Brading
(Footway / Buildouts) £0 £0 £34,000 £0 £0 £34,000
8HT1 Yarbridge Cross,
Brading (Ped. Phase) £0 £0 £27,500 £0 £0 £27,500
8HT2 High Street /
Madeira Road Ventnor (Ped X) £0 £0 £30,000 £0 £0 £30,000
8XC9 Road Crossings
2003-04 DO NOT USE £110,000 £0 £0 £0 £0 £0
8XP0 00/01/02 Anglesea
St/George St Ryde - Crosing £0 £0 £0 £3,523 £0 -£3,523 Being designed in-house
Total
for Group £210,000 £0 £429,155 £38,001 £17,925 £373,229
Footway
Improvements & New Footways
8H0M 01/02/03
Alverstone Road Apse Heath Footway £0 £0 £795 £47 £748 £0 Complete
8H0P 01/02/03 Gustars
Shute Calbourne - Footway £0 £0 £3,008 £2,258 £750 £0 Complete
8H0R 01/02/03 Eddington
Road St Helens - Footway £0 £0 £36,324 £31,613 £17,395 -£12,683
8HM1 Footpath Link
Improvement Works £0 £0 £0 -£5,831 £395 £5,436
8XC6 Walking Schemes -
DO NOT USE £500,000 £0 £121,279 £0 £0 £121,279
8XN0 00/01/02 N.Walk
Ryde - Footway - Phase 1 £0 £0 £3,559 £3,253 £8,928 -£8,621
8XN2 00/01/02 Newport
Pedestrianisation Study £0 £0 £668 £0 £0 £668
8XNA 00/01/02 Clarence
Rd Wroxall - Footway £0 £0 £0 £0 £3,199 -£3,199
8XNC 00/01/02 Upper
High St Bembridge-Footway £0 £0 £25,000 £681 £0 £24,319
Total
for Group £500,000 £0 £190,633 £32,020 £31,414 £127,198
Safety
8H3G 01/02/03
Carpenters Rd Beaper Shute Brading £0 £0 £21,425 £21,425 £0 £0
14 November 2003 Page 4 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
8H3T 01/02/03
Visibility Improvement at Junctions £0 £0 £0 £49 £0 -£49
8H3W 01/02/03 North
Road / High Street Shanklin £0 £0 £5,330 £5,279 £51 £0
8H6K Safety Camera
Partnership-Capital £0 £0 £0 £38,807 £2,654 -£41,460 Spend will be covered by grant yet to be received.
8HH1 Greenmount Primary
School - Ryde £30,000 £0 £36,000 £11,802 £68 £24,130
8HH2 Nine Acres Newport £0 £0 £48,000 £1,518 £0 £46,482
8HH3 St Boniface / St
Wilfrids Ventnor £0 £0 £48,000 £0 £0 £48,000
8HH4 Oakfield Primary
School £0 £0 £48,000 £554 £0 £47,446
8HH5 Broadlea Primary
Lake £0 £0 £30,000 £997 £0 £29,003
8HHA Shalfleet Primary
Ningwood £0 £0 £30,000 £985 £756 £28,258
8HP1 B3395 Culver
Parade / Yaverland Road £50,000 £0 £59,000 £548 £0 £58,452
8HP2 A3056 Hale Common
/ Fighting Cocks £50,000 £0 £50,000 £0 £0 £50,000
Crossroad
8HP3 Mersley Down /
Knighton Shute £50,000 £0 £59,000 £4,435 £0 £54,565
8HP4 A3055 Lake Hill /
The Fairway £0 £0 £83,000 £783 £0 £82,217
8HP5 Briddlesdord Road
/ Havenstreet Road £0 £0 £24,000 £1,193 £0 £22,807
8HP6 Melville Street /
Dover Street Ryde £0 £0 £27,000 £1,076 £0 £25,924
8HP7 Upton Road Ryde £0 £0 £47,000 £832 £0 £46,168
8HP8 A3054 High Street
/ Station Road Wootton £0 £0 £24,000 £254 £0 £23,746
8HP9 A3020 Blackwater
Road / Shide Road £0 £0 £24,000 £422 £0 £23,578
8HPA Canteen Road
Whiteley Bank £0 £0 £24,000 £0 £1,652 £22,348
8XC3 Safe Routes to
School - DO NOT USE £220,000 £0 £10,000 £0 £0 £10,000
8XC7 Local Safety
Schemes 2003-04 - DO NOT USE £300,000 £0 £0 £0 £0 £0
8XLB Fairlee Rd
Junction works £0 £0 £67,000 £0 £0 £67,000
8XLK 99/00 Afton Rd
btwn Wilmington Lane/Broad Ln £0 £0 £4,100 £0 £0 £4,100
8XLR 99/00 Princes Rd
jnctn with Avenue Rd Fwater £0 £0 £2,700 £0 £0 £2,700
8XLT 99/00 Nettlestone
Green Seaview £0 £0 £10,000 £0 £0 £10,000
8XLW 99/00 Upper Green
Rd adj.Sunnyside St.Helens £0 £0 £0 £1,016 £0 -£1,016
8XLY 99/00 Minor
Junction Improvements - Islandwd £0 £0 £5,000 £0 £0 £5,000 Complete
8XR3 00/01/02 Traffic
Regulation Orders £0 £0 £34,501 £22,184 £3,225 £9,092 Ongoing
8XR4 00/01/02 A3021
Whippingham Rd - Refuges £0 £0 £7,000 £1,427 £0 £5,573
Total
for Group £700,000 £0 £828,056 £115,586 £8,405 £704,065
Cycleways
8H04 01/02/03 Fairlee
Cycleway Drainage £0 £0 £0 £0 £600 -£600 Investigation complete
14 November 2003 Page 5 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
8H05 01/02/03 Newport
to Sandown Cycle Route £0 £0 £233,897 £191,637 £23,214 £19,046 Project operational June 2003
8HK1 2003-4 Wootton
High St cycle by-pass £0 £0 £12,846 £11,076 £0 £1,770
8HK4 2004-04 Petticoat
Lane Cycle Path £0 £0 £0 -£6,000 £0 £6,000
8HK5 2003-04 Medham
Cycle Route £0 £0 £0 -£10,000 £0 £10,000
8XC5 Cycling Schemes
2003-04 - DO NOT USE £175,000 £0 £0 £0 £0 £0
8XMT 99/00 Cycle
priority £0 £0 £0 £148 £0 -£148
8XNN 00/01/02 Wootton -
Ryde Cycle Route £0 £0 £0 £77 £0 -£77
Total
for Group £175,000 £0 £246,743 £186,938 £23,814 £35,991
Public
Transport Provision
8H08 01/02/03 Study for
Bus Priority Measures £0 £0 £13,801 £13,801 £0 £0
8H09 01/02/03 Bus
Shelters £0 £0 £14,380 £8,610 £1,451 £4,319
8H1A 01/02/03 Upgrade
Bus Stops & Hardstanding £0 £0 £2,002 £2,002 £0 £0 Complete
8H1B 01/02/03 Ryde
Interchange £0 £0 £412 £412 £0 £0 Complete
8H40 Sandown/Shanklin -
Park & Ride Facilities £0 £0 £3,949 £463 £3,486 £0
8H5A PTII - Islandwide
Bus Routes £0 £0 £2,782 £0 £2,782 £0 Complete. Commitment = retention
8H5B PTII - Gt Preston
Rd Ryde £0 £0 £2,923 £227 £0 £2,696
8H5C PTII - Carpenters
Rd St Helens £0 £0 £25,000 £20,960 £1,969 £2,072 Commenced 6 January 2003
8H5D PTII - Melville St
Sandown £0 £0 £1,083 £0 £1,083 £0 Complete. Commitment = retention
8H5E PTII - Mayfield Rd
Ryde £0 £0 £19,823 £19,723 £100 £0 Commenced 6 January 2003
8HH6 Bus Gate Mayfield
Rd - Ryde £80,000 £0 £120,500 £2,658 £3,650 £114,192
8HH7 Hunnyhill -
Parkhurst Road Bus Link £70,000 £0 £79,500 £11,054 £0 £68,446
8XC4 Bus Infrastructure
2003-04 - DO NOT USE £90,000 £0 £25,493 £0 £0 £25,493
8XPF 00/01/02 Park
& Ride Cowes - Additional Funds £0 £0 £31,831 £31,831 £12,340 -£12,341
8XPK 00/01/02 Bus
Priority Measures £0 £0 £148 £148 £0 £0
Total
for Group £240,000 £0 £343,627 £111,888 £26,862 £204,877
Traffic
Calming / Speed Reduction
8XPR 00/01/02 Traffic
Quiet Cells,Ryde £0 £0 £125,601 £96,823 £55,237 -£26,458 Substantially complete.
8XPT 00/01/02 Traffic
Management Systems - Ryde £0 £0 £0 £0 £759 -£759
Total
for Group £0 £0 £125,601 £96,823 £55,996 -£27,218
Drainage
14 November 2003 Page 6 of
7
COST
COST CENTRE 2003/04
CENTRE
DESCRIPTION ORIGINAL ACCRUALS REVISED ACTUAL COMMIT- BUDGET
CODE BUDGET 2002-03 BUDGET SPEND TED LEFT
8H28 01/02/03 Castle
Road Carisbrooke £0 £0 £3,160 £1,965 £0 £1,195
Total
for Group £0 £0 £3,160 £1,965 £0 £1,195
Highways
Maintenance Capitalisation
8H1U Leeson Rd Ventnor
(Emergency Works) £0 £0 £0 £190 £0 -£190
8H6B Coppins Bridge
Reconstruction £0 £0 £3,455 £2,144 £1,635 -£324 Complete. Retention due Feb 2004.
Total
for Group £0 £0 £3,455 £2,334 £1,635 -£514
Advance
Highways Design for 2003/05
8H6A Alpine Rd Ventnor £0 £0 £866 £834 £696 -£664
8XD4 Advance Design for
2004/5 schemes-DO NOT £210,000 £0 £92,000 £0 £0 £92,000
USE
Total
for Group £210,000 £0 £92,866 £834 £696 £91,336
Adverse
Weather Works
8H4D Chimney
Steps/Leeson Rd Bonchurch £60,000 £0 £88,367 £127 £3,367 £84,873
Total
for Group £60,000 £0 £88,367 £127 £3,367 £84,873
Other
Schemes
8H4H Design - High St
Ryde Upgrade Pedest Area £0 £0 £25,817 £70 £22,619 £3,129
8H4J Design - Old Rd
E.Cowes (Footway) £0 £0 £0 £464 £0 -£464
8H6J Retaining Wall
Works - Alpine Rd Ventnor £0 £0 £30,431 £28,975 £441 £1,015
8H6L Heart of Pan -
Road junction improvements £0 £0 £19,678 £11,252 £2,203 £6,223
8HX1 Sandrock Rd -
Slipped carriageway reconstruc £0 £0 £35,000 £25,074 £1,519 £8,406
8HX2 Briddlesford Rd
03-04 Surfacing RHill to Lyn £0 £0 £43,000 £41,559 £2,987 -£1,546
8HX3 Baring Road -
Phase 2 - Traffic Calming £0 £0 £14,000 £0 £0 £14,000
Total
for Group £0 £0 £167,926 £107,394 £29,769 £30,763
Roads + Transport Total £5,495,000 £245,942 £7,580,617 £4,111,793 £596,164 £2,872,660
14 November 2003 Page 7 of