PAPER C
Directorate: ENVIRONMENT SERVICES
Service Area: ENGINEERING SERVICES
Produced by: STEVE MATTHEWS
Phone Number: 823702
Location: JUBILEE STORES
Date completed: 29TH AUGUST 2003
Services covered: Highway Maintenance, Traffic & Transportation, Street Lighting, Waste Management, Coastal Management, Car Parking, Public Transport, Public Rights Of Way, Highway Design, Highway Development Control, Business Support & Call Centre
Contents: Service Plan Summary, Structure and Budget, Previous Year’s Improvement Plan, Key Objectives, Key Performance Measures, Consultation, Resource Bids
Key Achievements from 2003/04:
• Achievement of ‘Investors in People’ status.
• Completion of major capital schemes e.g. Military Road, Principal Road Corridor Improvements, Newport to Sandown Cycleway and Ventnor Haven.
• Considerable progress made on setting up a departmental Quality Management System to ISO 9001 standard.
• Publication of 15 departmental service leaflets.
• Setting up of inspection regime and database for highway retaining walls.
• Use of new Priority Assessment System to prioritise highway schemes.
• Success of Jubilee Stores Call Centre with reduction of complaints and number of telephone calls.
Key Objectives and Improvements for 2004/05:
• Improve and maintain to a high standard the highway infrastructure.
• Create safe, pedestrian friendly environments in towns and villages.
• Reduce Road Casualties
• Increase travel choice, encourage sustainable travel.
• Increase number of people travelling by public transport.
• Maintain lighting and illuminated street furniture to ensure minimum number of No Lights.
• To reduce, reuse and recycle waste.
• To provide users of the coastal zone with advice, information and services of the highest technical quality
• To effectively manage the Council’s Car Parking stock in accordance with demand management strategy
• Subsidise non commercial bus services.
• Promote walking and cycling.
• Develop new cycle tracks.
• Web Page Design.
• To deliver a quality design check and planning conditioning and service to the planning section.
• Implementation of departmental Quality Management System to ISO 9001 standard.
• Improving driver & passenger safety.
• Improve child safety.
• Maintain high standard obtained in Best Value Report.
• Increase service electronically by 2005.
• Improved management of waste collection.
• Complete all coastal defence strategy studies.
• Complete Round Two Shoreline Management Plan for the Isle of Wight coast.
• Inspect coastal defences in accordance with Defra recommendations following a risk based approach.
• Upgrade and enhance existing car park facilities.
2. Structure and Budget 2004-05
Team |
Workforce (FTE) |
Staff Costs (£) |
Other costs (£) |
Highway Maintenance |
14.0 |
399,887 |
3,006,059 |
Street Lighting |
2.0 |
63,578 |
707,965 |
Traffic & Transportation |
10.0 |
289,160 |
887,150 |
Central & Public Transport Support |
54.7 |
1,012,063 |
421,602 |
Car Parks |
20.2 |
308,710 |
(1,886,139) |
Road Safety |
3.5 |
97,326 |
11,665 |
Highways Design |
7.8 |
168,565 |
9,919 |
Development Control |
7.0 |
169,046 |
(2,063) |
Rights of Way |
7.8 |
174,372 |
193,563 |
Coastal & Harbours |
17.0 |
400,298 |
616,757 |
Client Strategy & Contract Management |
6.0 |
167,546 |
8,860,666 |
Management, Policy and Strategy |
5.0 |
241,484 |
206,250 |
Business Support and Call Centre |
11.1 |
184,827 |
68,757 |
|
|
|
|
Engineering Services Total |
166.1 |
3,676,862 |
13,102,151 |
Notes |
|
1. ‘Other Costs’ above compromise:- |
|
“Controllable Budget”, including operational budgets |
8,133,276 |
Building Maintenance Costs |
73,002 |
Central Services Support Charges |
456,391 |
Capital Financing |
4,439,482 |
Total |
13,102,151 |
|
|
2. Engineering Services Capital Budget is not included in the above figures |
|
In addition to the revenue expenditure detailed, the Engineering Services |
|
Teams also have responsibility for the following:- |
|
Roads & Transportation Capital Budget (2003-04) |
7,580,617 |
Coastal Management & Strategy Studies (2003-04) |
175,000 |
Coast Protection Projects – 2003-04 only and subject to |
|
Approval by DEFRA – Total approx |
6,000,000 |
Total Capital |
13,755,617 |
|
|
5. Key Performance Measures and Targets 2004/05
5a Targets for the Annual Action Statement 2004/05
Target Description |
Target 2003/04 If app. |
Target 2004/05 |
Benchmark figure and year if app. |
Source |
5% increase |
5% increase |
81,223 – 2000 |
Monthly manual counts |
|
4% decrease |
4% decrease |
114 – 2002 |
Quarterly accident returns from Police |
|
5% decrease |
5% decrease |
15 – 2002 |
Quarterly accident returns from Police |
|
54% |
56.5% |
28% - 1997 (contract target) |
Tracking of tonnages - IGM contract |
5b Mandatory targets 2004/05
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
|
|
|
|
|
|
Subject to ICT resources and GAGS progress |
52.1% |
52.21% |
46% |
43.5% |
72% - 1997 (contract target) |
|
|
23.3% |
10.92 |
13% |
14.5% |
12% (combined with composting) DEFRA baseline |
|
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
4.1% |
19.66 |
20% |
20% |
12% (combined with composting) |
|
|
518 |
574 |
519 |
575 |
National average |
|
|
6.9m |
5.7m |
5.8m |
5.8m |
N/A |
|
|
94% |
94% |
95% |
95% |
N/A |
|
|
17.82 |
12.03 |
10 |
10 |
N/A |
|
|
56.79 |
69.22 |
50 |
47 |
N/A |
|
5c Other key targets 2004/05
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
N/A |
N/A |
75% |
77% |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
95% |
96% |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
2 major improve-ments per year |
2 major improve- ments per year |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
1 April 2004 |
N/A |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
30 September 2004 |
N/A |
Local Indicator- no benchmark figure |
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
i) To minimise the number of missed domestic waste collections From daily log sheet. Calculate monthly |
38 52.1 |
34 52.21 |
33 per week 46% |
33 48% |
72 – National average 72% - 1997 contract target |
|
N/A |
N/A |
100% |
100% |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
100% |
100% |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
100% |
100% |
Local Indicator- no benchmark figure |
|
|
N/A |
N/A |
100% attainment |
100% |
Local Indicator- no benchmark figure |
|
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
To meet and achieve the number of inspections as set out within the criteria of the Streetworks Act Total no. of inspections undertaken x 100 Maximum no. of inspections to Streetworks Act criteria |
N/A |
N/A |
95% |
96% |
Local Indicator- no benchmark figure |
|
To improve the cost effectiveness of the service by the reduction of abortive runs No. of abortive pre-salts and standby arranged per season x cost x 100 Total no. of pre-salts and standby arranged per season x cost |
N/A |
23.79% |
5% |
5% |
Local Indicator- no benchmark figure |
|
Street Inspections To meet and achieve the total number of inspections, monthly, three monthly and annually as set down within the policy Total no. of monthly inspections completed x 100 Total no. of monthly inspections Monthly |
N/A |
N/A |
98% |
98% |
Local Indicator- no benchmark figure |
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
To improve safety and cost effectiveness by the reduction of successful insurance claims Total cost of successful claims in any year x 100 Total cost of successful claims in the previous year Annually |
N/A |
N/A |
20% |
25% |
Local Indicator- no benchmark figure |
|
Highway Enforcement To improve the safety of the highway network for all road users by the reduction of overhanging vegetation and footway obstructions Total no. of hedges/trees cut within 14 days of serving notice x 100 Total no. of notices served Three Monthly Total no. of obstructions successfully removed x 100 Total no. of notices served |
N/A |
N/A |
95% |
95% |
Local Indicator- no benchmark figure |
|
Abandoned Vehicles To meet and achieve the removal of abandoned vehicles within the times as set down within the Policy Total no. of vehicles removed within 7 days x 100 Total no. of identified for destruction Three monthly |
N/A |
N/A |
85% |
90% |
Local Indicator- no benchmark figure |
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
Maintenance of the Highway Network To ensure that all urgent repairs are undertaken within 24 hours from the time these are reported to the time of completion Total no. of inspections undertaken x 100 Total no. of works orders issued for completion within 24 hours (Based on a sample inspection of 20%) Monthly |
N/A |
N/A |
95% |
97% |
Local Indicator- no benchmark figure |
|
Replace reported ‘no lights’ (lights not working) within 5 working days Monthly record sheet |
N/A |
N/A |
98% |
98% |
Local Indicator- no benchmark figure |
|
Carry out annual BVPI survey of complete RoW network Annual survey by volunteer team trained and supervised by RoW Development Officer |
N/A |
N/A |
83% pass rate improving by 3% pa. |
86% |
Local Indicator- no benchmark figure |
|
Cycle Training i) Introduction to Cycling Programme to be implemented in Primary Schools Monitor number of schools annually
ii) Off road Cycling Proficiency training in Middle Schools Monitor number of schools annually |
N/A
N/A |
N/A N/A |
All 46 schools All 16 schools |
86% 86% |
Local Indicator- no benchmark figure Local Indicator- no benchmark figure |
|
Performance Indicator and source |
Target 2002/3 |
Actual 2002/3 |
Target 2003/4 |
Target 2004/5 |
Benchmark Figure |
Source |
In Car Safety Number of child safety seats checked in cars Monitor number annually |
N/A |
N/A |
25 % increase over 2002 |
10% increase over 2003 |
Local Indicator- no benchmark figure |
|
Number of safe routes to schools schemes prepared Annual monitoring of highways capital programme |
N/A |
N/A |
5 |
5 |
Local Indicator- no benchmark figure |
|
Run Cowes Ferry (or scheduled launch) throughout advertised hours of operations Records of service time lost through mechanical failure or grounding (but not refuelling) – quarterly |
N/A |
N/A |
99% of scheduled hours operated |
99% |
Local Indicator- no benchmark figure |
|
7. Resource Bids Summary
|
|
2004/5 £000 |
2005/6 £000 |
2006/7 £000 |
ES1 |
Highway maintenance (general) |
2,450 |
2,450 |
2,450 |
ES2 |
4 additional posts |
115 |
115 |
115 |
ES3 |
Pavement Management System |
70 |
45 |
45 |
ES4 |
To meet job evaluation requirements |
8 |
8 |
8 |
|
|
|
|
|
ES5 |
Funding for approved staffing structure & training |
110.5 |
110.5 |
110.5 |
ES6 |
1 additional post – development of travel plans |
30.6 |
28.6 |
28.6 |
|
|
|
|
|
ES7 |
Transport Officer – Council vehicle Driving Authorisation |
21 |
18 |
18 |
ES8 |
Islander Concessionary Fares Scheme |
|
|
|
|
|
|
|
|
ES9 |
Planned programme of enhancement to car parks |
100 |
100 |
100 |
ES10 |
Development of Decriminalised Parking Enforcement |
91.8 |
139.8 |
0 |
|
|
|
|
|
Financial Implications |
||||
ES11 |
Training, Publicity & Educational Resources |
30.5 |
35.5 |
40.5 |
ES12 |
Child Pedestrian Training Co-ordinator |
15.5 |
35.5 |
36.5 |
ES13 |
Relocation of Road Safety Centre to Newport Quay |
30 |
0 |
0 |
|
|
|
|
|
ES14 |
2 additional posts – Team leader & Senior Technician and equipment and training |
138.6 |
115.1 |
93.9 |
ES15 |
Bridges and Retaining Walls |
269.5 |
265 |
245 |
|
|
|
|
|
ES 16 |
1 additional post |
30 |
29 |
29 |
|
|
|
|
|
ES17 |
Additional resource to meet CROW Act 2000 |
15 |
15 |
15 |
|
|
|
|
|
ES18 |
Increase in coastal protection maintenance budget to reflect impact of climate change |
13.2 |
26.4 |
39.6 |
|
|
|
|
|
ES19 |
Cyclical Contracts Technician |
24.7 |
24.7 |
24.7 |
ES20 |
Senior Waste Management Technician |
29.2 |
29.2 |
29.2 |
|
|
|
|
|
|
|
2004/5 £000 |
2005/6 £000 |
2006/7 £000 |
ES21 |
Professional advice – to develop a PFI Business Plan |
60.0 |
60.0 |
0 |
ES22 |
2 staff posts & training – Policy & Strategy support |
56 |
50 |
50 |
ES23 |
Replacement defective & obsolete lighting structures |
30.0 |
30.0 |
30.0 |
ES24 |
Accommodation changes at Jubilee Stores |
30.0 |
0 |
0 |
ES25 |
Advance Design – Ryde Interchange |
357.0 |
34.0 |
17.0 |
|
|
4326.1 |
3,964.3 |
3,725.5 |