PAPER B
Committee : EDUCATION, COMMUNITY
DEVELOPMENT AND LIFELONG LEARNING SELECT COMMITTEE
Date : 29 AUGUST 2002
Title : SERVICE PLANS
AND PERFORMANCE INDICATORS – EDUCATIONAL EFFECTIVENESS AND LIFELONG LEARNING
REPORT OF THE STRATEGIC DIRECTOR OF EDUCATION AND
COMMUNITY DEVELOPMENT
SUMMARY / PURPOSE :
This report summarises information
on the 2002/03 Service Plan for Educational Effectiveness and Lifelong Learning
service together with information and commentary on past performance in
2001/02.
Service Plans have been prepared
to a standard format for all major service areas within the authority. The
Plans contain a range of information including :
Following preparation of a
Corporate Plan (draft approved for consultation at Executive on July 2nd
2002), a revised Service Plan format is to be introduced for the next financial
year – this will ensure that service activities directly link to the approved
corporate goals.
The Council also collects a
diverse range of information regarding service performance through both
national and local Performance Indicators (PIs) which are published each year
in the Best Value Performance Plan (BVPP). In the 2001/02 BVPP, a “traffic
light” system has been introduced to classify PIs by the following categories :
Attached to this report (Annex 1), members will find summary
information for the following service areas :
·
Inspection and Advice.
·
Special Educational Needs and Welfare Support Services.
·
The Education Centre.
·
The Early Years Unit.
·
Youth and Community Service.
The information provided in Annex
1 includes :
Members should note the following
:
Members are invited to comment
upon the Service Plan. Areas for enquiry may include :
Also attached to this report
(Annex 2), are the Performance Indicators for the Select Committees areas of
responsibility. These have been categorised into the 4 “traffic light”
groupings described earlier. A fifth category (“unclassified) has been added to
include those PIs where it is not possible to make a performance judgement.
The following comments should be
noted :
1.
Better
than average and improving
2.
Better
than average and worsening
3.
Worse than
average and improving
4.
Worse than
average and worsening
5.
Unclassified
See Annex 1
None as a direct result of this
report.
That the Committee : 1.
Consider and comment upon the Service Plan 2.
Consider and comment upon the Performance Indicators for
the service and identifies priority areas for improvement
Best Value Performance Plan,
2001/02
Contact point :
DAVID
PETTITT
Director,
Head of Education Effectiveness and Lifelong Learning
Strategic
Director of Education and Community Development
ANNEX 1 : SERVICE
PLAN
7.1 STATEMENT OF PERFORMANCE 1 : ADVICE AND
INSPECTION
NUMERIC
INDICATORS, TARGETS AND STANDARDS
Performance
Indicator and Source |
Performance |
Benchmarking |
|||
Actual 00/01 |
Estimate 01/02 |
Target (& Date) |
Comparative
Performance (Date) |
Source of
Comparison |
|
Key stage 2 Literacy and
Numeracy targets. Ref. EDP target
annex. |
70% En 66% Ma |
77% En 72% Ma |
82% En(2002) 70% Ma(2002) |
71% En (2001) 67% Ma (2001) |
National Literacy/Numeracy targets |
Key Stage 4 GCSE targets. Ref. EDP target annex. |
44% 5*A-C |
49% 5A*-C |
50% 5A*-C (2002) |
48% 5A*-C (2001) |
National GCSE targets |
NgFL pupil/school email access. |
100% of schools have access |
Maintenance of 01/02 |
Target met two years ahead |
National target 100% for 2002/03 |
NgFL national targets |
NgFl NoF teachers and school librarians ICT training. |
56% of staff in training |
90% of staff in training |
March 2002 100% of staff in training |
National target for 100% by March
2002 |
NgFL national NOF targets |
Improvement of all OFSTED special measures/serious weakness schools. |
1 school designated |
No schools designated |
1 sch. Ser.W 1 sch. Sp. M |
National av. 10% LEA 1.4% |
OFSTED LEA profile comparators |
Improvement of all cause for concern schools within 2 year
period. |
100% removed in 2yr |
Maintenance |
100% removed in 16mths. |
National av. 2yrs. LEA 16mths. |
SW- LEA school improvement
comparators |
7.2 STATEMENT OF
PERFORMANCE 1 : SPECIAL EDUCATIONAL NEEDS AND WELFARE SUPPORT
Performance
Indicator (include
Ref. No. where applicable) |
Targets against
Indicator(s) |
Current
Performance Standard |
|
|
2000 / 2001 |
2001 / 2002 |
2000 / 2001 |
1. Statements a) BVPI
43 - Percentage of statements of Special Educational Needs issued by the authority
in a financial years and prepared within 18 weeks: |
|
|
|
i) Excluding
those affected by ‘exceptions to the rule’ under the SEN Code of Practice. |
70 |
85 |
81 |
ii) Including
those affected by ‘exceptions to the rule’ under the SEN Code of Practice’ |
55 |
55 |
37 |
iii) Improvements
are being sought in both better adherence to timescales and in the quality
and consistency of submissions by other agencies in terms of contributions to
the statutory assessment process. |
- |
- |
- |
b) Monitoring
closely the number of statements being issued (to reduce the number of
children with statements which currently standards at above 4% (i.e. above
the national average of 3%). |
4.3% |
4% |
4.2% |
2. SEN Tribunals To reduce the
number of cases being referred to the SEN Tribunal. |
6 |
6 |
3 (2 withdrawn and in one case
conciliation still in progress) |
Performance
Indicator (include
Ref. No. where applicable) |
Targets against
Indicator(s) |
Current
Performance Standard |
|
|
2000 / 2001 |
2001 / 2002 |
2000 / 2001 |
3. SEN Budget a) To
maintain the SEN budgets as detailed in Section 2 within budget as far as
possible. |
To keep within budget |
Achieved in 2000 / 2001 |
|
b) Monitoring
of how schools use devolved / delegated funding – this task is identified in
the EDP. A pilot scheme is commencing
in April 2001 in 7 schools. |
- |
8 Reviews completed |
- |
4. Annual Reviews a) Improving
attendance of annual review meetings to 25% of all meetings. |
25% |
guide |
? |
b) In
relation to the task set out in 3(b) above to monitor the quality of the
annual review process in relation to the paperwork completed by schools. A sample of ? will be reviewed commencing
in April 2001. |
- |
- |
- |
5. Data To improve
management and statistical information to better inform the planning process. |
New post created in January 2001 (IT
/ Administrative Assistant) |
- |
|
6. Conciliation To set up a
conciliation service for parents in line with new national guidelines. |
Shaftesbury Society engaged – worked
on two cases, on of which resulted in parents withdrawing SEN Tribunal
appeal. A second case is still being
pursued. |
- |
Tuition and
Behaviour Support Service
Performance
Indicator (include
Ref. No. where applicable) |
Targets
against Indicator(s) |
Current
Performance Standard |
|
|
2000 / 2001 |
2001 / 2002 |
2000 / 2001 |
BV 159 (new) The percentage of permanently
excluded pupils attending alternative tuition of: |
|
|
|
a) under 10 hours b) 10 to 25 hours c) over 25 hours |
N/A N/A N/A |
0% 100% 25% |
|
Monitor the educational provision and progress of children educated at home: |
|
|
|
a) Telephone contact b) By post c) Personal visit |
100% 100% 30% |
50% 50% 100% |
75% 60% (return) 20% |
Pupil Individual
Action Plans to be reviewed on a six weekly cycle (half termly) when educated
out of school. |
100% |
100% |
50% |
Maintain and update
attainment data for children in public care on a termly basis. |
100% |
100% |
100% |
Complete formal
advice to the LEA (Education Act 1996) within statutory time scales. |
100% |
100% |
100% |
Respond to school requests
for behaviour support within 2 working days. |
N/A |
100% |
N/A |
Respond to general
enquiries within 5 working days. |
90% |
100% |
85% |
Service review
feedback from schools to remain at satisfactory or better. |
100% |
|
100% |
Education
Welfare Service
Performance
Indicator (include
Ref. No. where applicable) |
Targets
against Indicator(s) |
Current
Performance Standard |
|
|
2000 / 2001 |
2001 / 2002 |
2000 / 2001 |
·
BVPI 44
amended - Number of pupils permanently excluded during the year from all
schools maintained by the LEA per 1000 pupils at all maintained schools |
|
0.8 |
|
·
Number of
pupils permanently excluded during the year from schools maintained by the
authority per 1000 pupils on rolls of schools maintained by the authority -
BVPI 44 |
|
|
|
a) Primary |
0 |
0 |
|
b) Secondary |
0.5 |
0.9 |
|
c) Special Schools |
0.5 |
0.5 |
|
·
Number of
appeals against permanent exclusion |
2 |
2 |
2 |
·
Number of
successful appeals |
1 |
1 |
|
·
Monitor
attendance data – BVPI 45 Percentage of half days missed due to unauthorised absence in secondary schools maintained by the LEA - Secondary Schools |
0.6% |
0.6% |
|
·
Monitor
attendance data – BVPI 46 Percentage of half days missed due to unauthorised absence in primary schools maintained by the LEA - Primary Schools |
0.2% |
0.1% |
|
·
Applications
for child employment permits completed within 14 days. |
- |
100% |
N/A |
·
Applications
for entertainment licences completed within 14 days. |
- |
100% |
N/A |
·
Service
review feedback from schools to remain at satisfactory or better. |
100% (from returns received) |
90% |
100% |
·
Attend
Discipline Committee proceedings in cases of permanent exclusion |
100% |
100% |
87.5% |
·
Replies to
enquiries dealt within 5 working days |
90% |
90% |
85% |
Education
Psychology
Performance
Indicator (include
Ref. No. where applicable) |
Targets against
Indicator(s) |
Current
Performance Standard |
|
|
1999 / 2000 |
2000 / 2001 |
1999 / 2000 |
Percentage of
schools visiting entitlements achieved |
100% |
100% |
91% |
Total school visits Total entitlement
visits |
150% |
150% |
153% |
Completion of
advice for statutory assessments within 6 weeks |
75% |
80% |
77% |
Support Teaching
Performance
Indicator (include
Ref. No. where applicable) |
Targets
against Indicator(s) |
Current
Performance Standard |
|
|
1999 / 2000 |
2000 / 2001 |
1999 / 2000 |
Delivery of target
number of allocated school sessions (learning support service) |
95% |
95% |
98% |
School Service
Level Agreements in place for all schools where there is service involvement |
100% |
100% |
100% |
Completion of
advice for statutory assessments within time limits |
100% |
100% |
100% |
7.3 STATEMENT OF
PERFORMANCE 1 : early years planning and provision
NUMERIC
INDICATORS, TARGETS AND STANDARDS
Performance
Indicator (incl Ref
No. where applicable) |
Targets
against Indicator(s) |
Current
Performance Standard |
All targets are
laid down in the Early Years Plan ie. for education places for 3 / 4 year
olds, childcare places, quality assurance, training and recruitment. |
29 strategic areas
all with specific targets, 42 in all. ·
233 new out of
school childcare places (4-14 year olds). ·
753 three year olds
will have a free early education place, there will be a place for all three
year olds. ·
All four year olds
will have an early education place in a reception class, pre-school nursery
or with an accredited childminder. ·
36 new childminders
will be recruited. Additional male
workers, staff from ethnic minority groups and people with a disability will
be recruited into the work force through a comprehensive recruitment
campaign. ·
FIZ (Family
Information Zone) will continue to expand its outreach services and provide
information to the public, professionals and child-care providers including a
staff vacancy and cover service. ·
30 groups and
reception classes will successfully complete the Kite Mark Quality Assurance
Process ‘Flying High for Early Years’. ·
A comprehensive
training programme including pre-registration courses, first aid, child
protection, curriculum support on the Foundation Key Stage, core competence
training for all early years staff, Early Years profile training, SEN
training on the new Code of Practice and other SEN training as identified in
the Early Years plan. ·
Maintain existing
and 2nd Childminder Network. ·
Visits to all
reception classes by September 2003 to support Foundation Key Stage
developments, and to all pre-schools by April 2003. ·
Recruit appropriate
core staff to carry out key tasks as identified in the statement of
performance. ·
Administer grants -
30 Start-up grants
for childminders. -
10 Schemes under
the outdoor play equipment grant. -
20 childminders
supported by the temporary assistance scheme. -
4 schemes under ‘wrap around care’ grant. -
20 development
grants to enhance provision. ·
Establish 6
Neighbourhood Nurseries in disadvantaged areas – Revenue Funding for 124
places Conduct audit of
provision, and training needs and current qualifications. Publish Early Years
Plan, promote the Partnership at two events including a Play Day. |
100% |
Performance
Indicator (incl Ref
No. where applicable) |
Targets
against Indicator(s) |
Current
Performance Standard |
Provide retained
functions as outlined in the Care Standards Act 2000 i.e. support for
prospective childcare providers, training, advice, and pre-registration
support |
Develop a clear
protocol for working together effectively so as to deliver coherent training,
advice and information services that build capacity and strengthen the
quality, choice, accessibility and diversity of provision locally. |
|
|
i.e. By setting up
structures, databases and systems to ensure retained functions are
appropriately delivered. |
100% |
Toy Library
Project. |
Develop 5 outreach
centres and link with Sure Start. Identify venue for
storage. Purchase a van Purchase and
catalogue toys Develop loan
service and systems |
100% |
Sure Start |
Ensure appropriate
financial systems Ensure Sure Start
links with other strategic plans and objectives 9 projects all with
up to 20 targets per project. 180 new places in
disadvantaged areas. (Childcare from birth – four years). |
100% |
Providing SEN
support and inclusive services for children in early education and day care. |
Maintain
appropriate staffing Provide appropriate
training for core staff and early years providers Establish pilot
portage programme Evaluate inclusive
provision in early education Support inclusive
day care provision and out of school placements for children with additional
needs. |
100% |
Early Excellence
Centres |
Support EEC
proposals Establish clear
links between the EYDC Partnership and the Island’s EECs 2 Centres to gain ministerial
approval |
100% |
Maintained Nursery
expansion programme |
Increased places
allocation for Dover Park and Sandown Nursery classes through appropriate
building programme Barton’s expansion
programme linked to early excellence Centre proposals |
100% |
Please enter any existing performance indicators for your
service in the first column, adding the relevant target(s) and originator(s) in
the middle column. In the last column enter the figure for your current
standard of performance i.e for 2002/03 in the first service plan.
7.4 STATEMENT OF PERFORMANCE 1 : education centre (the learning network)
NUMERIC
INDICATORS, TARGETS AND STANDARDS
Performance
Indicator and Source |
Performance |
Benchmarking |
||||||
Actual 00/01 |
Estimate 01/02 |
Target (& Date) |
Comparative
Performance (Date) |
Source of Comparison |
||||
Quality of Teaching
and Learning: Objective 5: |
New initiative |
|
|
|
|
|||
Leadership,
Management and Governance of Schools: Objective 9. LPSH No. eligible heads who have
completed: NPQH No. teachers completed No. teachers participating |
43.75% 10 23 |
59% 14 26 |
65% (Sept 2002) 30 30 (Sept 2002) |
|
|
|||
Leadership, Management
and Governance of Schools: Objective 10. Link Governor Forum
representation by schools |
14% |
25% |
35% (March 2002) |
|
|
|||
Staff Development:
Objective 11. |
New method of evaluating training
just introduced therefore no data. |
|
|
|||||
Adult Learning:
Objective 15. Adult Learning Week
– number of: - activities -
agencies involved |
|
|
|
|
|
|||
Performance
Indicator and Source |
Performance |
Benchmarking |
||||||
Actual 00/01 |
Estimate 01/02 |
Target (& Date) |
Comparative
Performance (Date) |
Source of
Comparison |
||||
Support
Services for Schools and Parents/Pupils: Objectives 43-45. Number of
schools that buy-back |
100% |
100% |
100% (2002/3) |
|
|
|||
Efficient Use of Resources:
Objectives 54-56. |
|
|
|
|
|
|||
Setting Service
Standards: Objective 59 |
|
|
|
|
|
|||
Environmental
Stewardship. Work towards
Eco-Centre Award |
New initiative for 2002/3 |
|
|
|||||
7. 5 STATEMENT OF
PERFORMANCE 1 : youth and community service
NUMERIC INDICATORS, TARGETS AND STANDARDS
Performance Indicator and Source |
||||||
*Actual 00/01 |
Performance Indicator and Source |
|||||
1999/2000 |
1998/1999 |
NYA Benchmarking OFSTED Statistical Neighbour |
||||
Youth Service as % of Ed. |
|
|
|
Youth Service as % of Ed. |
|
|
1.56% 1.31% |
|
|
15 Calderdale 52 Isle of Wight 133 Medway Towns |
1.84% 1.27% 0.57% |
|
|
11-25 Spending |
|
|
|
11-25 Spending |
|
|
25 North
Lincolnshire 50 Isle of Wight 138 Medway Towns |
|
|
21 North
Lincolnshire 22 Isle of Wight 111 Torbay |
£37.89 £37.42 £19.31 |
|
|
|
|
|
% 11-25’s In Contact |
|
|
|
41.29% 24.49% 13.61% |
55% |
|
25 Torbay 38 Isle of Wight 81 Darlington |
20.76% 16.33% 7.91% |
|
|
|
|
|
13-19 Spending |
|
|
|
£78.86 £75.76 £32.24 |
|
|
25 North
Lincolnshire 42 Isle of Wight 131 Medway Towns |
£74.88 £66.01 £23.07 |
|
|
|
|
|
% 13-19’s In Contact |
|
|
|
47.13% 31.49% 18.52% |
79% |
|
18 Torbay 43 Isle of Wight 71 Darlington |
33.12% 19.93% 13.54% |
|
* Comparative figures for 2000/01 not
yet available – Figures given as Actual are for 1999/2000. Other LEA data is Highest/Lowest
Other statistical neighbours are: Calderdale, North Lincolnshire, York, Shropshire, East Riding of Yorkshire, Darlington, Warrington, Torbay & Medway Towns.
8.1 STATEMENT OF PERFORMANCE 2 : ADVICE AND
INSPECTION
NON
NUMERIC PERFORMANCE STANDARDS, SIGNIFICANT ACHIEVEMENTS OR AREAS FOR
IMPROVEMENT
Please give a short explanation, with figures if possible.
During last 12 months |
Achievements: Recognition
of service impact and quality in OFSTED inspection of the LEA and subsequent
HMI survey visits, as with ICT/NgFL , where the services work was described
as outstanding. Overall standards and leadership and management improvement in schools, particularly primary phase. Continued standards improvement evident in KS1 results. Reduction of school’s causing concern and those in serious weakness or special measures. Overall below the national average and that of most statistical neighbours. Service rating, at OFSTED level 2, meets best value requirements. |
Areas for
Improvement: Comparative
weakness in KS3 performance as seen in school PANDA and LEA profile
indicators. Service now planning, with schools, introduction of national KS3
strategy. Major service initiative area for the next three years. Improvement
of writing performance at KS2. Conference held in January 2002 follow up work
with schools and Primary/Middle clusters in place – Ref. EDP Priorities and
activities. Improvement
of KS4 GCSE matriculation in English, mathematics and science – Ref. EDP
Priorities and activities. |
Over last 1 to 3 years |
Achievements:
Improvement
in service consistency and quality of judgement. Implementation of consistent
visit and reporting practices. Schools recognise need for challenge but feel
supported in putting matters right when weakness is identified. Ref.
individual comment letters on school files, from Headteachers and Chairs of
Governors, training evaluations, results of surveys. Comparisons from a three year trend within the LEA profile
and feedback from HMI/OFSTED in relation to schools in special measures or
serious weakness indicates that the service is having a positive impact upon
the overall improvement of the
quality of education and management and leadership across all phases. All
school action plans approved at first submission by OFSTED, all schools in
special measures cleared within an average of eighteen months, as against
OFSTED two year target. Number of schools in special measures (1) and serious
weakness (1) at 4.3% is well below the national average (10%) over a three
year period. Success
of the National Literacy and Numeracy strategy initiatives. Significant three
year improvement in KS2 standards – ref. KS2 result data. Success
of the NGfL strategy implementation. All local implementation targets met –
ref. EDP. National targets, as with pupil email access met early. DfEE
recognised in top 10% for implementation. Effective cross service
collaboration. Success
of the DfEE/OFSTED Accredited course in School Self-Evaluation. Service
approved to deliver course. December 2001 all senior managers of schools have
completed the programme. High level of approval in course evaluation
responses – ref. Education Centre analysis and monitoring and EDP priorities. Development
of service teamwork and collaboration with other services within the
Directorate to secure school improvement. Ref. cross service case
conferencing on schools, cross service data input to school categorisation
meetings. |
Areas for Improvement: All areas
for improvement are as set out in the EDP Priorities and activities for
2002/03. |
8.2 STATEMENT OF PERFORMANCE 2 : SPECIAL EDUCATIONAL NEEDS AND
WELFARE SUPPORT
NON NUMERIC PERFORMANCE STANDARDS, SIGNIFICANT ACHIEVEMENTS OR AREAS FOR IMPROVEMENT
LEA OfSTED Inspection
Following
the OfSTED inspection of the LEA in June 2000, Special Educational Needs,
Behaviour Support, Provision of Education Otherwise than at School and
attendance received the following commentary.
Strategy
The
LEA is working towards a more coherent strategy. Most of the schools visited are supportive of the LEA’s
determination to develop inclusion by creating resourced provision in
mainstream schools.
Supporting School Improvement
SEN
statements are of a satisfactory standard.
Overall the support given to schools by SEN Services is satisfactory.
Statutory Obligations and Value for Money
The
LEA has improved its practice in issuing statements within 18 weeks and is now
above the national average. The LEA was
failing to comply with Code of Practice guidance to initiate annual reviews. Efforts are being made to control SEN
expenditure through a transfer or resources to
schools. There is no systematic
monitoring to ensure the provision set out in statements is being made. Overall the provision for Special
Educational Needs is unsatisfactory.
Behaviour Support
The
quality of LEA support for behaviour is satisfactory over all and good in
primary schools. The Behaviour Support
Plan is strong on provision and provides a useful guide to schools on the range
of services available. It is weak on
monitoring and evaluation.
Provision of Education Otherwise that at
School
There is a detailed
and up to date list of children out of school because of parental choices,
exclusion or for medical reasons. At
present, provision for their pupils is too variable and there is insufficient
evaluative judgement of the quality and appropriateness of educational
provision made for their pupils.
Attendance
LEA targets are
realistic and good progress is being made towards meeting them. The work of EWO’s is generally appreciated
by schools visits. Cover for sickness
absence and failure to feedback after visits creates a less than satisfactory
service.
Children in Public Care, Child Protection and Ethnic Minority Children
The LEA makes
satisfactory provision for health and safety, child protection and pupils’
welfare. The provision for children in
Public Care is satisfactory. The
quality of support for ethnic groups and travellers is satisfactory.
8.3 STATEMENT OF PERFORMANCE 2 : EARLY YEARS
PLANNING AND PROVISION
NON
NUMERIC PERFORMANCE STANDARDS, SIGNIFICANT ACHIEVEMENTS OR AREAS FOR
IMPROVEMENT
During last 12 months |
Achievements (Description, consequences, action taken) E.g. All
self evident in Early Years Plan – enclosed. See 7 Re-write implementation plan. |
Areas for Improvement (Description,
consequences, action taken) E.g. Best
Value Early Years will be targeted in 2002-2003, plan for review in Spring
2003 |
Over last 1 to 3 years |
Achievements (Description,
consequences, action taken) This is outlined in the
review/evaluation/monitoring section of the early years plan, and built into
the implementation plan for 2002-2003. |
Areas for Improvement (Description,
consequences, action taken) |
8.4 STATEMENT OF PERFORMANCE 2 : EDUCATION
CENTRE (THE LEARNING NETWORK)
NON
NUMERIC PERFORMANCE STANDARDS, SIGNIFICANT ACHIEVEMENTS OR AREAS FOR
IMPROVEMENT
Please give a short explanation, with figures if possible.
During last 12 months |
Achievements: § Increase in networking and brokerage activities; § New system for course applications has improved communications with applicants and INSET co-ordinators; § Education Centre website developed and updated at Centre; § Staffing reviewed and permanent staff appointed; § Staff development activities undertaken through training activities undertaken internally and externally (some carrying accreditation); attending liaison/networking meetings, as appropriate; involvement in activities outside usual job remit. |
Areas for
Improvement: §
All training
and development activities follow same procedures for application,
confirmation etc; §
Improve
access for non-car users; §
Increase
awareness of Centre amongst potential users, especially high school teachers; §
Improve use
of IT systems in particular email, Outlook calendar; Internet access for use
in library. |
Over last 1 to 3 years |
Achievements: §
Transition
from termly to annual programme; §
Developing
networking and brokerage activities; §
Development
of library and resources; design service; §
Buy-back of
services. |
Areas for
Improvement: §
All training
and development activities follow same procedures for application,
confirmation etc; §
Improve
access for non-car users; §
Increase
awareness of Centre amongst potential users, especially high school teachers; §
Improve use
of IT systems in particular email, Outlook calendar; Internet access for use
in library; §
Update
equipment/facilities at the Education Centre; §
Staff
development activities undertaken through training activities undertaken
internally and externally (some carrying accreditation); attending
liaison/networking meetings, as appropriate; involvement in activities
outside usual job remit. |
8.5 STATEMENT OF
PERFORMANCE 2 : Youth and Community Service
Please
give a short explanation, with figures if possible.
During last 12 months |
Achievements.
(Description, consequences, action taken.) Ø
Not in last 12 months but have maintained National
Accredited Staff Development policy since 1992 Ø
Part Time Youth Workers Training Programme nationally
endorsed for 4 years in 1999 Ø
Successful SRB bid and appointment of Street Youth Work
Manager. Ø
Process to develop Part Time Youth Worker training to meet
the National Occupational Standards stated |
Areas
for Improvement. Ø
To increase number of Street Youth worker posts Ø
Complete process to National Occupational Standards |
Over last 1 to 3 years |
Achievements. (Description, consequences, action
taken.) Ø Ofsted
Inspection September 1997. Report
1998 – Good value for money Youth Service Ø See
Supplementary paper |
Areas
for Improvement. (Description,
consequences, action taken.) See
achievements and areas for improvement above. |
ACHIEVEMENTS
IN PAST 1-3 YEARS
Established
Ø Mobile Youth
Initiatives as a registered charity
Ø Youth &
Community Service web page
Ø Individual
Youth Achievement Award
Ø Streets Ahead
in Ryde
Established
Ø lst Gear with
Youth Clubs Hants and IW UK.
Ø
Training Programme for
Sex and Relationship Education
Increase in International
Youth Work
Ø
Egham 2000 multi
national Young People Get Together
Ø
Lithuania exchange
Ø
Germany and Denmark
multi cultural experience.
Ø
Attendance at European
contact making seminar in Corsica and Sicily
Ø
Inter European islands
contact making seminar on Isle of Wight.
Ø
Successful
continuation of the Women and Girls Event.
Ø
Collaborative working
with other agencies, schools, Health Authority, Drug Action Team, Police,
Traffic Education.
Ø
Environmental Exchange
Allonosis
Established 1st Gear with
Youth Clubs Hants and IW UK
Established Training Programme for Sex
and Relationship Education.
Major Capital developments at Newport,
West Wight and Ventnor Youth & Community Centres.
Established in partnership the Wight 2B
Heard Conference.
11. STRATEGIC AIMS
& OBJECTIVES FOR THE SERVICE
Service
Aim |
Tasks |
Targets
and Dates |
Responsible
Officer |
Objectives
to Which This Task Contributes |
|||
Directorate |
Corporate |
||||||
1.
) ) )))))))))) ) |
1.1.To implement priority 1 and actions
for Early Years and the Foundation Key Stage. |
To achieve
activities 1.1 – 1.4 in EDP2 April 2002 – March 2003. |
M East R Ward |
1, 2, 3, 4, 6, 7,
8, 10, 11, 13, 18, 28, 31, 40, 41, 42 |
·
Providing High
quality Council services. ·
Improving health,
housing and the quality of life for all. ·
Raising educational standards
and priority life long learning. |
||
1.2.To raise achievement in Key Stages 1,
2, 3 and 4 through priority 2. |
To achieve
activities 2.1 – 2.14 in EDP2 April 2002 – March 2003. |
K Simmonds and
School Improvement Team. |
1, 2, 3, 4, 5, 6,
7, 11, 12, 22, 23 |
||||
1.3.To improve 14-19 curriculum coherence
and attainment through priority. |
To achieve
activities 3.1-3.5 in EDP2 April 2002 – March 2003. |
D Pettitt, K Simmonds and
School Improvement Team |
13, 14, 15, 22, 23 |
||||
1.4.To implement priority 4 of EDP2 to
improve school self evaluation. |
To achieve
activities4.1-4.12 in EDP2 April 2002-March 2003. |
K Simmonds and
School Improvement Team |
5, 6, 7, 8, 9, 10,
11, 22, 23 |
||||
1.5.To implement priority 5 of EDP2 and
improve SEN provision and support. |
To achieve
activities 5.1-5.5 in EDP2 April 2002-March 2003 |
R Faulkner and
School Improvement Team |
11, 30, 31, 32, 33,
34, 35, 36, 37, 38, 41 |
2.
) ) )))))))))) ) ) |
2.1.To implement priority 5 and
associated activities in EDP2. |
To achieve
activities 5.1-5.5 in EDP2 April 2002-March 2003. |
R Faulkner and
School Improvement Teams |
11, 30, 31, 32, 33,
34, 35, 36, 37, 38, 39, 41 |
·
Providing High
quality Council services. ·
Improving health,
housing and the quality of life for all. ·
Raising educational standards
and priority life long learning. |
||
2.2.To implement the priorities and
activities with the SEN Development Plan 2002 |
To achieve targets
in the plan as detailed April 2002-March 2005 |
D Faulkner and SEN
Teams |
3, 6, 11, 18, 22,
23, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 41 |
||||
2.3.To implement the SEN Code of Practice
2002 (CDP). |
To achieve the
targets as detailed in the CDP from September 2002. |
R Faulkner K Lane R Denman |
30, 31, 32, 33, 34,
35, 37, 38 |
||||
2.4.To implement the BV Improvement Plan
for children with SEN and disability. |
To achieve the
target outcomes as detailed in the BV Review 2002/05. |
D Pettitt R Faulkner |
29, 30, 31, 32, 33,
34, 35, 36, 37, 38, 41, 42, 44, 46, 49, 50 |
Service
Aim |
Tasks |
Targets
and Dates |
Responsible
Officer |
Objectives
to Which This Task Contributes |
|||||||
Directorate |
Corporate |
||||||||||
3.
EARLY YEARS
PLANNING AND PROVISION: To promote
and achieve high quality provision and out of school car for all pre-school children
who need it and ensure this provision meets national and local quality
standards. |
3.1.To implement review and revise the
Early Years Development and Childcare Plan. |
To achieve all
target outcomes within the specified times April 2002-March 2003. |
M East |
12, 15, 18, 26, 29,
30, 32, 40, 41, 42, 46, 52, 54, 55, 56 |
·
Improving
health, housing and the quality of life for all. |
||||||
3.2.To implement priority 1 and actions
in EDP2. |
To achieve
activities 1.1-1.4 in EDP2 April 2002-March 2003. |
M East R Ward |
1, 2, 3, 4, 6, 7,
8, 10, 11, 13, 18, 28, 31, 40, 41, 42 |
·
Raising
education standards and providing lifelong learning. |
|||||||
3.3.- |
|
|
|
|
|||||||
3.4.- |
|
|
|
|
|||||||
4.
·
Raising
education standards and promoting lifelong learning ) ) ) ) ) ) ) ) ) ) ) ) |
4.1.To secure effective training and
development opportunities for schools. |
To support relevant
EDP activities April 2002 to March 2003. |
C Walker |
1, 2, 3, 4, 5, 6,
7, 8, 9, 10, 11, 16, 17, 30 |
|
||||||
4.2.To provide a full range of up-to-date
resources of reference materials. |
To increase use of the
Education Centre Library and maximise use of ICT opportunities. |
C Walker |
|
|
|||||||
4.3.To co-ordinate and manage support for
Standards Fund activity |
To manage central
administration of Standards Fund activity. |
C Walker |
|
|
|||||||
4.4.To ensure effective communication
with schools and other ‘client’ groups. |
To extend and
develop extra net and data base provision. |
C Walker |
22, 23 |
|
Service
Aim |
Tasks |
Targets
and Dates |
Responsible
Officer |
Objectives
to Which This Task Contributes |
|||
Directorate |
Corporate |
||||||
5.
·
Providing
high quality Council Services. ·
Improving
health, housing and quality of life for all. ·
Raising
education standards and promoting lifelong learning. ·
Creating
safe and crime free community. |
5.1.To centre the development of Street
Youth Work. |
1.
Appoint P/T
staff (November 2001) 2.
Train P/T
staff accordingly (February 2002) 3.
Street Youth
Work commences (December 2001) 4.
Re-commencement
of work in Ryde (December 2001) |
Justine Darke |
19, 20, 21, 32, 36 |
|
||
5.2.To align Part-Time Youth Training and
Qualification with National Occupation Standards in consultation and
partnership with the regional Training and Development Group. |
1. To re-write Part Time Youth Work
Training Programme in accordance with National Occupational Standards
December 2002 (December 2002). |
Training and
Development Officer |
48 |
|
|||
5.3.To extend contract of Assistant
Development Worker Duke of Edinburgh Award (Objectives 20, 21) |
1. Make funding available from April
2002 to continue the work with those with disabilities and those living in
rural areas. (April 2002). 2. Develop initiative for Social
Inclusion 2002 (April 2002) |
Training and
Development Officer |
20, 21 |
|
|||
5.4.To work in partnership with Health
Agencies, Schools and Connexions to promote social inclusion. (Objectives 20, 31, 32) |
1. To reduce teenage pregnancies and substance
misuse by young people in line with Government targets 2010, 2005 (Date
2010). 2. Date 2005. 3. To establish Summer Activities for
Year 11 Leavers (July/August 2002). |
|
|
|
|||
5.5.To deliver a Training programme to
all Youth workers on Sex and Relationships Education. (Objectives 20, 21, 338) |
1. To train all Youth Workers in Sex
& Relationships Education (April 2002) 2. To develop on-going programme of
training (April 2002) |
Sex &
Relationship Training Team Training & Development
Officer |
48 |
|
|||
5.6.To forge further interest link. |
1. To set up Youth Work exchange with
Ostholstein (May 2002). 2. Develop Youth Exchange to
German/Denmark (July 2002). 3. Duke of Edinburgh’s bronze expedition
Finland (August 2002). |
Martin Rouse Robin Brigstock Graham Westmore |
20, 21, 33 |
|
|||
|
5.7.To conduct Best Value Review of Youth
Service provision. |
1. To complete Best Value review (start
Nov 2001 complete by March 2002). |
George Weech |
51, 52, 53, 54, 55,
56, 59 |
|
ANNEX 2 : PERFORMANCE
INDICATORS
1. Better than average and improving
BV 30 Percentage of 3-year-olds receiving
a good quality, free, early years education place in the voluntary, private or
maintained sectors.
IOW figure – 64%
BV 42 Enrolments on adult education courses per 1,000 adult population
BV 45 Percentage of half days missed due to unauthorised absence in secondary schools maintained by the local education authority.
BV 46 Percentage
of half days missed due to unauthorised absence in primary schools maintained
by the local education authority.
BV 50 Educational
qualifications of children looked after (The proportion of young people leaving
care aged 16 or over with at least one GCSE at grade A to G or a GNVQ).
2. Better than average but worsening
BV 37 Average GCSE/GNVQ points score of fifteen year old pupils
in schools maintained by the Local Education Authority
IOW figure – 36.5
BV 43b Percentage of statements of special educational need issued by the authority in a financial year and prepared within 18 weeks including those affected by “exceptions to the rule” under the SEN Code of Practice.
IOW figure – 42%
4.
Worse than average
and worsening
BV 38 Percentage of fifteen year old
pupils in schools maintained by the Local Education Authority achieving 5 or
more GCSEs at grades A* – C or equivalent.
IOW figure – 44.4%
BV 39 Percentage of fifteen year old pupils in schools maintained by the Local Education Authority achieving one or more GCSEs at grade A*- G or equivalent.
IOW figure – 92%
BV 40 Percentage of pupils in schools maintained by the Local Education Authority achieving Level 4 or above in the Key Stage 2 Mathematics test.
IOW figure – 66%
BV 41 Percentage of pupils in schools maintained by the Local Education Authority achieving Level 4 or above in the Key Stage 2 English test.
IOW figure – 70%
BV 43a Percentage of statements of special educational need issued by the authority in a financial year and prepared within 18 weeks excluding those affected by “exceptions to the rule” under the SEN Code of Practice.
IOW figure – 79%
5.
Unclassified
BV 32 Expenditure on adult education per head of adult population.
BV 33 Youth Service expenditure per head of population in the Youth Service target age range.
IOW figure – £103.84
BV 48 Percentage of schools maintained by the local education authority subject to special measures. (worse than average and static)
IOW figure – 1.4%