PAPER B2
ISLE OF WIGHT COUNCIL DEVELOPMENT CONTROL
COMMITTEE –
TUESDAY 29 NOVEMBER 2005
REPORT OF THE HEAD OF PLANNING SERVICES
Joint
Reports - Reference Numbers: P/00870/03
- TCP/24809/C
P/00884/03
– TCP/24809/D
Parish/Name: Newport - Ward/Name: Newport North
Registration
Date: 29/04/2003 -
Full Planning Permission
Officer: Mr J Fletcher Tel: (01983) 823552
Applicant: Buchanan Land Holdings Ltd
Demolition
of existing buildings; construction of 3/4/5 storey block of 69 flats (33
one-bed, 36 two-bed); basement car parking (38 spaces); access off Pyle Street
(revised scheme)
1, 1A, 1B,
2 and 4 Pyle Street, 12 and 14 East Street and The Publican PH and 71, South
Street, Newport, Isle of Wight, PO30
Demolition
of existing buildings; construction of 3/4 storey block of 19 flats (8 one-bed,
11 two-bed) with retail unit at ground floor level; pedestrian access off South
Street (revised scheme)
Auto Windscreens, 52 South
Street, Newport, Isle of Wight, PO30 1JQ
Both applications are recommended for Conditional Permission subject to
Section 106 Agreement.
These are major applications of some importance having
significant policy implications and were both considered at the Development
Control Sub Committee on 4 October 2005 at which time they were deferred to
allow officers to negotiate on solely design issues as follows: Give further consideration to
external appearance of the buildings in order to create a scheme which
reflects the prevailing pattern of development in Newport.
REASON FOR COMMITTEE CONSIDERATION
1. Details of Application
1.1 P/00870/03
– TCP/24809/C
1.1.1 Members are reminded that application is for residential development in the form of total of 69 flats (33 one bedroom, 36 two bedroom) with basement car parking with 38 spaces accessed off Pyle Street.
1.1.2 Plan form the proposal indicates a lengthy terrace following the
line of back of footpath to South Street terminating adjacent the fire station
with the other end of the terrace returning along Pyle Street terminating
adjacent the clinic in Pyle Street. In its form the terrace block follows a
gentle curve with a rounded corner element on the corner of the junction of
Pyle Street with East Street. Proposal provides for a mix of storey heights
ranging from three storey in the vicinity of Pyle Street with East Street and
along Pyle Street itself rising to four storey and five storey and then
reducing to three storey where the block directly abuts the fire station. The
short elevation onto Pyle Street consists of entirely three storey elements
with varying styles of roof finish.
1.1.3 Roof finishes are in the main in the form of stopped gabled roofs
but does include a hipped roof feature over the element of the terrace which
abuts the fire station, a parapet curved feature where the block curves round
the junction of Pyle Street with East Street and in the case of the block over
the entrance of Pyle Street the roof is in the form of a mansard roof.
1.1.4 Following the deferral of the application applicants have
reconsidered the elevational treatments with the alterations being itemised as
follows:
· Brickwork
Revised proposal indicates mainly red facing brick with elements of grey and buff facing brick. Proposal includes for brick dressings and soldier courses around the window with stone cills. Narrow vertical brick piers indicated separating each pair of dwellings within the terrace.
Brick detailing and eaves level indicates that traditional corbelling of the brickwork terminating in the traditional fascia.
The only exception to the eaves treatment as described above is one element having a parapet termination at third floor level with the parapet being capped off with a coping stone. This treatment is to be applied in respect of the rounded corner element on the junction of Pyle Street and East Street with the parapet being in a stepped form.
Other brick features include contrasting brick quoins contrasting brick corbelling at eaves level and contrasting waiting brick string courses at first floor level.
One of the pair of units has a rendered feature at ground floor.
· Windows
The projecting bay window features which are either in the form of single projecting bay or vertical double bays to be constructed in white painted timber with appropriate panels between floors. Each bay feature to be finished in a slated hipped pitched roof feature with traditional eaves treatment. All other windows are in the form of traditional timber sash windows painted white.
The dormer windows similarly are to be in timber casement windows painted white under a flat roof finished in a lead style cladding.
1.1.5 Each unit to be provided with ground floor protectable space being finished in steel railings on dwarf brick walls.
1.1.6 In general the flats to be served in pairs by communal staircase accessed off South Street through a timber stained double entrance doors.
1.2 P/00884/03 – TCP/24809/D
1.2.1 This application relates to the smaller site
on the western side of the fire station and seeks detailed consent for an
elongated building providing retail with residential on the ground floor with
further residential accommodation through first, second and third floors.
1.2.2 Plans indicate retail frontages onto South
Street and returning partially along the west and east facing elevations.
Remaining ground floor elevations relate to the residential use with the main
entrances to the two ground floor flats being via the eastern passage way. In
terms of elevational treatments these are itemised as follows:
·
Retail units to
be provided with shop fronts consisting of central pilasters where appropriate
stall risers and fascias set within brick surrounds in the form of brick
dressings and string courses.
·
To be finished
in similar specification as indicated in respect of the main site providing for
the use of mainly buff facing brickwork with red brick features in the form of
quoins brick dressings around the windows with soldier course arches and
terminating at third floor level in the form of a corbelled parapet finish
capped off with a coping stone.
·
Third floor to
be set back both to the front and sides and to be finished in a grey facing
brick again with a corbelled parapet finish as previously described.
1.2.3 Block occupies a width of approximately 12.5
metres by overall depth of 35.5 metres which results in a two metre gap on its
western side and a 3 metre gap on its eastern side. Block is set back
approximately 2.5 metres from back of footpath on the south street frontage.
Apart from the flats proposal also indicated bin stores to serve the flats
accessed off the western side.
1.2.4 Overall the proposal seeks consent for the
demolition of the existing buildings and provides for a total of 19 flats (9
one bed and 11 two bed) along with the ground floor retail units providing a
total retail floor space of approximately 265 m2. Finally proposal
indicates that the third floor element of this proposal is set some 6 metres
back from the rear elevation and therefore the height of block immediately
adjacent the rear boundary is restricted to three storey only.
2. Location and Site
Characteristics
2.1 P/00870/03 - TCP/24809/C
2.1.1 Application relates to an
irregular shaped site on the north-western side of South Street virtually
opposite the multiplex cinema and the junction of Furrlongs with South
Street. Site has a short frontage onto
Pyle Street close to its junction with East Street. Site currently accommodates a group of residential dwellings, four
of which front Pyle Street and two of which front South Street.
2.1.2 Site also accommodates
redundant public house (formerly Shoulder of Mutton) and redundant commercial
buildings. Abutting western boundary on
the Pyle Street frontage is a Healthcare Clinic whilst abutting western
boundary on South Street frontage is the Fire Station. Site slopes towards the junction of East
Street with Pyle Street and Coppins Bridge Roundabout.
2.2 P/00884/03 - TCP/24809/D
2.2.1 Rectangular shaped site
which currently accommodates commercial premises (52 South Street) located
opposite the goods entrance to Morrison's Supermarket. Abutting eastern boundary is the Fire
Station whilst abutting western boundary is the ATS premises. Abutting to the north are rear boundaries
which serve a group of terraced dwellings numbers 18,19, 20, 21 and 22 Pyle
Street. The site is virtually level.
3. Relevant History
3.1 None in respect of any previous consents on the site.
4. Development Plan
Policy
4.1 Relevant national policy documents relate to PPS1 – Delivering
Sustainable Development, and PPG3 – Housing.
4.1.1 PPS1 emphasises the aim
of sustainability for development proposals with reference being made in terms
of design issues to the following:
Good design plays important role in ensuring
attractive, usable, durable and adaptable places emphasising that:
·
There should be
an avoidance of unnecessary prescription of detail
·
A concentration
on overall scale, density, massing and height
·
Layout and
access of new development in relation to neighbouring buildings and the local
area
·
Should not
attempt to impose architectural styles or stifle innovation, originality or
initiatives
·
Promote or
reinforce local distinctiveness where appropriate.
4.1.2 PPG3
emphasises the need to:
·
Make efficient
use of urban land to take pressures off greenfield sites but not at the expense
of cramped development
·
Provide wider
housing opportunity and choice through better mix and size and type and
location of housing
·
Ensure housing
schemes where appropriate provide an element of affordable housing the need for
which should be identified through a Housing Needs Survey.
·
Create a more
sustainable pattern of development ensuring accessibility to public transport
·
Ensure the
achievement of densities within 30 – 50 units per hectare range with even
greater intensity of development being appropriate where good public transport
accessibility such as town centre sites
·
More than 1.5
parking spaces per dwelling not likely to reflect the government’s emphasis on
sustainable residential development.
4.2 Local
Plan Policies
4.2.1 In terms of Unitary Development Plan both sites are situated
within Newport town centre boundary and within a larger area of land retail
allocated (known as the fire station site). The allocation includes the fire
station ATS premises and other commercial and residential properties which
front Pyle Street. Allocation recognising that any redevelopment proposal could
only take place following the relocation of the fire station.
4.2.2 Neither of the two sites are within the Newport Conservation Area
although both are in close proximity.
4.3 Relevant Strategic
Policies are as follows:
S1 - Development concentrated within existing
urban areas.
S2 - Development encouraged on land which has been
previously developed (brownfield sites).
S3 - New developments of large scale located in
defined development envelopes.
S5 - Proposals should be for the overall benefit
of the Island.
S6 - Development should be of a high standard of
design.
S7 - The need to provide for the development of at
least 8,000 housing units over the planned period.
S11 - Council will aim to encourage development of an
effective efficient and integrated transport network.
S14 -New retail development
will be expected to locate within existing town centres.
4.4 Local plan policies are
listed as follows.
G1 - Development Envelopes
for Towns and Villages
G4 - General Locational
Criteria for Development
G6 - Areas Liable to Flooding
D1 - Standards of Design
D2 - Standards for
Development within the Site
D5 - Shop Fronts and Signs
D11 - Crime and Design
B6 - Protection and
Enhancement of Conservation Areas
B9 - Protection of
Archaeological Heritage
H4 - Unallocated Residential
Development to be Restricted to Defined Settlements
H6 - High Density
Residential Development
H14 - Locally Affordable
Housing as an Element of Housing Schemes
TR6 - Cycling and Walking
TR7 - Highway Considerations
for New Development
TR16 - Parking Policies and
Guidelines
R3 - Sites for Retail
Development
U2 - Ensuring Adequate
Educational, Social and Community Facilities for the Future Population
U11 - Infrastructure and
Services Provision
L10 - Open Space and Housing
Developments
5. Consultee and Third
Party Comments
5.1 Internal Consultees
·
Highway
Engineer, Council’s Contaminated Land Officer, Council’s Housing Development
and Initiatives Officer and the Council’s Archaeological Officer have all
commented suggesting appropriate conditions. With regard to the Archaeological
Officer in view of the sensitive location of the site predetermination
archaeological investigations have taken place on the South Street site with
result of those investigation indicating the need for conditions to ensure
preservation by record of highly sensitive remains.
·
Council’s
Housing Development Initiative Officer has concluded that affordable housing is
not deliverable in the traditional form and following negotiations was
supportive of the proposal for affordable housing at sub market sale levels
aimed at key workers in respect of 10 of the units on the South Street scheme.
·
Architects
Panel recognise the extreme importance of the site in Newport and the need for
high quality proposals.
·
Following the
deferral it should note that the redesign process has heavily involved the
Conservation and Design Team who have appraised the revised proposed and are
satisfied that it reflects more readily the historic and traditional character
of Newport. They emphasise the importantance of ensuring that the details of
both the joinery particularly the bay windows and the decorative brick features
are carefully considered with particular reference to construction methods.
Their only concern relates to the range of brickwork colours being presented.
They do not object in principle of introducing contrasting brickwork colours
within the overall terrace but consider a more structured approach would result
in a less fussy appearance and therefore would be preferable. They certainly
consider the ground floor elevations required to be treated in a contrasting
material with a greater use of the render finish particularly where the flats
have protectable space behind the back of footpath. This would enable the
ground floor to appear as a solid plinth to the main block and also reduce the
vertical impact of the terrace. They are satisfied that these detailed elements
can be dealt with under the auspices of conditions.
5.2 External
Consultees
Southern Water and Environment Agency
commented accordingly with the Environment Agency recommending appropriate
conditions.
In view of the sites proximity to nearby
Newport Conservation Area English Heritage were requested to comment and raised
a number of detailed design issues in respect of the initial advertised scheme
with result that a number of changes took place in respect of both sites with
those changes being reflected in the schemes placed before Members on the 4
October 2005.
5.3 Third Party Representations
5.3.1 Members will recall that proposals were the subject of a number
of representations from local residents identifying a number of points of
concern.
5.3.2 P/00884/03 – TCP/24809/D
Following the deferral further letter of
concern has been received from Pyle Street resident making particular reference
to elements of the proposal on the Auto Windscreens site (P/00884/03 –
TCP/24809/D) with these comments being summarised as follows:
·
Concern at the
closeness of the development to the rear boundary causing loss of sunlight and
having an overbearing and obtrusive effect.
·
Concern that
the overall height will have an obtrusive impact on the nearby buildings which
are in a conservation area.
·
Concern that
the development will encroach on an existing boundary wall which forms the rear
boundary of properties fronting Pyle Street.
·
Concern that
this development does not provide any car parking with the result that further
pressures will be placed on on-street parking facilities in the area.
·
Writer states
that the commercial units back directly onto the properties with a fear that
this will lead to noise and pollution problems from delivery vehicles etc. (In this case the commercial units are set
to the front of the building with residential being adjacent to the Pyle Street
properties.)
·
Concern that
the demolition works will have health and safety implications on nearby
properties with particular reference to possible removal of asbestos.
·
Some concern
regarding potential for overlooking from the proposed development on the
properties in Pyle Street. There have been particular concerns regarding the
impact of overlooking on the doctors surgery as a number of consulting rooms
could be overlooked thus affecting privacy and confidentiality.
·
Suggestion that
bats may occupy the existing building.
6. Evaluation
6.1 Background
Members will recall that
these applications were deferred with that deferral following an extensive
debate which covered a number of issues relating to scale, impact on the
townscape and the methodology of providing affordable housing. The result of
that debate was a deferral of the application essentially relating to design
issues and the view of the Committee was that the scheme did not reflect the
general character of Newport and the applicants were therefore being requested
to revisit the scheme solely on this basis.
6.2 Revised Elevation
·
I am now in receipt of revised elevations which indicate a traditional
approach which the architects consider are more reflective of the vernacular of
Newport.
·
Prior to meeting the architects following the deferral the Conservation
and Design Team carried out an assessment of characteristics of the area
immediately around the site but also wider areas of Newport in order to assist
in advising as to what would be the best approach in this case. The architects
themselves also carried out a further assessment and a number of alternative
approaches were discussed.
·
Result is the scheme now before Members which has altered the tone of the
building with the fenestration now being of a more domestic scale. The main
alteration has been to the proposed bay windows with particular reference to
the use of timber sash windows and the provision of a roofing element which
provides a visual stop to those bay windows. This is in contrast to the more
contemporary approach in respect of the original bay features which included
the use of reconstructed stone. My interpretation of Members concerns was that
this was an example of the introduction of a feature which neither reflected
the character of Newport or reflected the more traditional architectural
approach of the remainder of the building.
·
Similarly with regard to the eaves treatment which again have now been
carefully considered in a more simple and traditional form using corbelling in
most cases and where parapetting is to be used again corbelling with coping
stone.
·
Proposal also has reviewed the window proportions generally with the
result being that the voids and solids relationships are better proportioned.
·
Finally the use of contrasting decorative brick features such as dressings
around windows and quoins along with corbelling at eaves level are all
reflective of similar details on older buildings in Newport and again
represents an important improvement on the original submitted scheme.
·
One issue which will need to be carefully considered is the choice of
brickwork with particular reference to texture, shape and colour however I am
satisfied that there is a level of choice on the market which should ensure an
appropriate quality of brickwork is provided for this important scheme.
6.3 General
Issues (P/00884/03 – TCP/24809/D)
I would comment as
follows on the concerns being expressed:
·
Proposal indicates reduction in height of building to the rear with that
reduction being purposely introduced to reduce the impact than neighbouring
properties. The three storey element which does abut the rear boundaries of
properties in Pyle Street is in the form of a flat roofed parapetted three
storey element. Obviously the three storey element will have a greater impact
on the existing scale of buildings on the site however your officers do not
consider that this impact is sufficient to warrant a refusal of the application
particularly as the north facing elevation is devoid of any windows.
·
Because of the shape and location of the site your officers can do no
more than suggest that any development on this site would be difficult to
achieve if parking were to be required in whatever form. This is essentially
because such parking would require a vehicular access directly off South Street
which would seriously sterilise the important frontage and would present an
architectural problem for which there would be some difficulty in achieving a
solution.
·
There is no doubt that this building will have an impact because of its
overall scale and also because it stands between building which contribute
little or nothing to the street scene and are generally of poor quality design.
The question is whether or not the scale of building is of sufficient quality
to set the standards and act as the catalyst for future developments on this
side of South Street. Given the changes that have now been introduced your
officers consider that a high standard will be set albeit of a traditional
architectural style.
·
Issues relating to impact of demolition works and possible asbestos
content in the building are outside the remit of planning with other
legislation controlling these matters.
·
Reference to the possible occupation of the existing building by bats is
being investigated and the outcome of those investigations will be reported to
Committee accordingly.
·
In terms of any specific overlooking issues of adjoining garden areas to
the properties which front Pyle Street with particular reference to overlooking
of the doctors surgery these have been addressed as follows:
o
Ensuring that the north facing elevation is devoid of any windows and
applying an appropriate condition removing permitted development rights to
insert such windows.
o
The appliance of a suggested condition ensuring that the flat roofed area
of the northern end of the block at third floor level will not be used as a
terrace or balcony with any access to this area being for emergency or
maintenance purposes only.
o
A requirement that the projecting bay windows on the western facing
elevation towards the rear of the building will have no side windows thus
preventing any opportunity to overlook in the northerly direction.
6.4 Other
Issues Relating to Background/Policy
General scale,
parking, traffic implications, environmental impact, financial contributions
and the provision of affordable housing were referred to in some detail within
the previous report and in a number of cases were discussed during the debate
on the determination of this application. Therefore this report has
concentrated solely on the design issue being the reason for deferral.
7. Conclusion and Justification for
Recommendation
7.1 Having given due regard and appropriate weight to the matters discussed both in the evaluation section forming part of this report and the previous report dated 4 October 2005 your officers are satisfied that this revised proposal is acceptable with particular reference to the amended elevational treatments. Both the sites are of particular importance being visually prominent and clearly being in need of regeneration which is important to the Isle of Wight generally but in particular to Newport.
7.2 The deferral by Members at the October meeting has, in the opinion of your officers, had the desired effect with the architects going the extra mile to ensure the incorporation of changes to the design following a further comprehensive look at the existing characteristics and context of the town centre. These changes do reflect more readily the character of Newport and this additional appraisal when linked with the input of the Council’s Conservation and Design Team and English Heritage has resulted in a scheme which does justice to this visually prominent sites.
7.3 Your officers therefore consider the proposal continues to be acceptable having achieved a satisfactory affordable housing package conducive to the circumstances of the site and therefore both applications are recommended for conditional approval subject to the completion of a Section 106 Agreement.
8. Recommendation
To grant Conditional
Permission to both applications subject to the completion of a Section 106 Agreement.
·
Financial
contribution of £72,600 towards education (both applications)
·
Financial
contribution of £25,000 towards transport infrastructure (both applications).
·
Provision of 10
affordable housing units in the form of discounted properties to sell at
between 70 – 80% open market value as proposed in the report prepared by Adams
Integra dated August 2005 (P/00870/03 – TCP/24809/C)
Conditions for P/00870/03 – TCP/24809/C
1 |
The development
hereby permitted shall be begun before the expiration of 5 years from date of
this permission. Reason: To comply with Section 91 of the Town and
Country Planning Act 1990. |
2 |
The development
shall not be occupied until sight lines have been provided in accordance with
the visibility splay shown at the proposed access junction onto Pyle Street
as indicated on the approved plan (reference number 02270L (20) 2022. Nothing that may cause an obstruction to
visibility shall at any time be placed or be permitted to remain within that
visibility splay. Reason: In the interests of highway safety and to
comply with policy TR7 (Highway Considerations) of the Isle of Wight Unitary
Development Plan. |
3 |
None of the units
hereby approved shall be occupied until uncontrolled raised area to
facilitate pedestrian crossing has been provided close to the junction of
Pyle Street with East Street, pedestrian cross over and refuge island has
been provided mid way between the junction of Furlongs with South Street and
junction of Pyle Street and South Street/East Street and vertical curbing has
been provided along the edge of carriage way along the South Street frontage.
Details of these features shall be submitted to and approved by the Local
Planning Authority and the development shall be carried out in accordance
with those details. Reason: Is in the interest
of highway safety and to comply with Policy TR7 (Highway Considerations) of
the Isle of Wight Unitary Development Plan. |
4 |
No dwelling hereby
permitted shall be occupied until 38 car parking spaces (including 2 spaces
for the disabled) have been provided and are fully operational in accordance
with Drawing No. 02270L (20) 2021. These spaces shall not thereafter be used
for any purpose other than that approved in accordance with this condition. Reason: In the interests of Highway Safety to comply
with Policy TR7 (Highway Considerations) of the Isle of Wight Unitary
Development Plan. |
5 |
A parking area
management plan including management responsibilities and maintenance
schedules in respect of the communal parking area indicated on the plan
hereby approved shall be submitted to and approved by the Local Planning
Authority prior to the occupation of any part of the development. The parking area management plan shall be
carried out as approved. Reason: In the interests of the amenities of the
area and to comply with policy D1 (Standards of Design) of the Isle of Wight
Unitary Development Plan. |
6 |
Prior to occupation
the dwelling hereby approved and agreed refuse collection management scheme
shall be in operation and such scheme shall thereafter be retained. Reason: In the interests of the amenities of future
residents and in compliance with Policy D1 (Standards of Design) of the Isle
of Wight Unitary Development Plan. |
7 |
Prior to occupation
of any of the dwellings hereby approved the proposed cycle shelter and bin
store facilities shall be completed in accordance with details to be agreed
and in the locations indicated on Drawing No. 02270L (20) 2022. Reason: In the interests
of providing cycle storage facilities in compliance with Policy TR6 (Cycling
and Walking) of the Isle of Wight Unitary Development Plan. |
8 |
No development
shall take place until a full external brick, render and roof slate schedule
has been submitted to and approved by the Local Planning Authority. Such
schedule shall be accompanied by samples and brick panels shall be erected on
site for inspection prior to agreeing the schedule. Development shall be
carried out in accordance with the approved schedule and shall not be amended
without prior to written consent of the Local Planning Authority. Reason: In the interests of the amenities of the
area and to comply with policy D1 (Standards of Design) of the Isle of Wight
Unitary Development Plan. |
9 |
The development
hereby permitted shall not be brought into use until the windows, doors, bay
window surrounds, moulding, string courses, piers, quoins, brick dressings
and soldier courses have been constructed in accordance with the details
shown on Drawing No.s 02270L (20) 2146 and 02270L (20) 2147. There should be
no amendment to these details without the prior written consent of the Local
Planning Authority. Reason: In the interests of the amenities of the
area and to comply with policy D1 (Standards of Design) of the Isle of Wight
Unitary Development Plan. |
10 |
None of the ground
floor units fronting South Street and Pyle Street shall be occupied until the
walls/wrought iron boundary treatment along the back edge of footpath has
been constructed in accordance with agreed details to be submitted to and
approved by the Local Planning Authority. Such boundary treatments to be
retained and maintained thereafter and shall not be altered without prior
written consent of the Local Planning Authority. Reason: In the
interests of the amenities of the area and to comply with policy D1
(Standards of Design) of the Isle of Wight Unitary Development Plan. |
11 |
Prior to occupation
of the dwellings hereby approved a lighting scheme shall be implemented in
accordance with details to be agreed with the Local Planning Authority such
lighting shall be provided both within the proposed basement car park and the
hard landscaped area abutting in part the northern and eastern boundary of
the site. Such lighting shall be retained and maintained thereafter. Reason: In the interests of planning out crime in
accordance with Policy D11 (Crime and Design) of the Isle of Wight Unitary
Development Plan. |
12 |
No part of the
development hereby permitted shall commence until there has been submitted to
and approved in writing by the Local Planning Authority: a) A desk-top study documenting all previous
and existing land uses of the site and adjacent land in accordance with
national guidance as set out in Contaminated Land Research Report Nos. 2
& 3 and BS10175: 2001; and, unless
otherwise agreed in writing by the Local Planning Authority, b) a site investigation report documenting the
ground conditions of the site and incorporating chemical and gas analysis
identified as appropriate by the desk-top study in accordance with BS10175:
2001 – “Investigation of Potentially Contaminated Sites – Code of Practice”; and, unless
otherwise agreed in writing by the Local Planning Authority, c) a remediation scheme to deal with any
contaminant including an implementation timetable, monitoring proposals and a
remediation verification methodology. The verification methodology shall
include a sampling and analysis programme
to confirm the adequacy of decontamination and an appropriately
qualified person shall oversee the implementation of all remediation. The construction of
buildings shall not commence until the investigator has provided a report,
which shall include confirmation that all remediation measures have been
carried out fully in accordance with the scheme. The report shall also
include results of the verification programme of post-remediation sampling
and monitoring in order to demonstrate that the required remediation has been
fully met. Future monitoring proposals and reporting shall also be detailed
in the report. Reason: To
protect the environment and prevent harm to human health by ensuring that
where necessary, the land is remediated to an appropriate standard in order
to comply with Part IIA of the Environmental Protection Act 1990. |
13 |
A) No development
shall take place until the applicant or their agents have secured the
implementation of a programme of archaeological works in accordance with a
written scheme of investigation which has been submitted to and approved by
the planning authority in writing. B) The demolition
and site clearance of existing structures will only commence under direct
archaeological supervision and recording. All archaeological remains should
be preserved by records, in accordance with, and adhering to, the Institute
of Field Archaeological codes of practice and standards. C) Following
completion of Condition B) no development shall take place until a full
archaeological excavation has been completed in areas made available by demolition.
All archaeological remains should be preserved by record, in accordance with,
and adhering to, the Institute of Field Archaeology codes of practice and
standards. D) A full site
archive and report must be prepared and deposited with the County Museums
service no later than 24 months after
the archeological excavation ceases. Reason: To ensure the preservation by record of
highly sensitive archeological remains of national importance in compliance
within Ministerial Circular DOE 11/95 and in PPG 16 and Policy B9 of the Isle
of Wight Unitary Development Plan. |
14 |
Prior to occupation
of any of the dwellings an agreed hard and soft landscaping scheme shall be
carried out. Any such scheme shall include details of surface treatments both
at ground floor, basement, car parking floor levels shall include details of
any tree planting noting species, plant sizes and an implementation
programme. Reason: To ensure the appearance of the development
is satisfactory and to comply with Policy D1 (Standards of Design) and Policy
D3 (Landscaping) of the Isle of Wight Unitary Development Plan. |
15 |
No development
shall take place until a detailed scheme including calculations for capacity
studies have submitted to and agreed with the Local Planning Authority indicating
the means of foul water and surface water disposal. Any such agreed scheme
shall include for a foul water disposal system indicating connection points
on the system where adequate capacity exists to ensure any additional flow
should not cause flooding or overload the existing system. Any surface water
system should be discharged into the nearby water course in accordance with a
scheme to be agreed with the Local Planning Authority. Reason: To ensure an adequate foul and surface water
drainage is provided for the development and in compliance with Policy U11
(Infrastructure and Services Provision) of the Isle of Wight Unitary
Development Plan. |
16 |
Prior to
commencement of work detail scheme shall be submitted to and approved by
Local Planning Authority indicating the treatment of the eastern and northern
boundaries (adjacent the Clinic and Fire Station). Such boundary treatment
shall be carried out in accordance with the agreed details prior to
occupation of any of the dwellings hereby approved. Reason: In the interests of
the amenities of the area and in compliance with D1 (Standards of Design) of
the Isle of Wight Unitary Development Plan. |
17 |
Prior to
commencement of work a full methodology statement shall be submitted in
respect of proposed site management which shall include timings of delivery
of construction materials. All construction traffic relating to the
development hereby approved shall be directed to leave the site by means of
prominent signage details of which shall be submitted to and approved in
writing by the Local Planning Authority. Such signage shall be erected at the
junction between the sites and South Street and Pyle Street. Signage shall be
retained in a clean and legible condition for the duration of the development
and any sign that is damaged beyond repair or removed shall be immediately
replaced. Reason: In the
interest of highway safety and to comply with Policy TR7 (Highway
Considerations) of the Isle of Wight Unitary Development. |
18 |
Steps including the
installation and use of wheel cleaning facilities in accordance with details
to be submitted to and approved in writing by the Local Planning Authority
shall be taken to prevent materials from being deposited on the highway as a
result of any operation on the site. Any deposit of materials from the site
on the highway shall be removed as soon as it is practical by the site
operator. Reason: In the
interests of highway safety and to prevent mud and dust from getting on the
highway and to comply with Policy TR7 (Highway Considerations) of the Isle of
Wight Unitary Development Plan. |
1 |
The development
hereby permitted shall be begun before the expiration of 5 years from date of
this permission. Reason: To comply with Section 91 of the Town and
Country Planning Act 1990. |
2 |
Prior to occupation
of any of the flats hereby approved secure cycle parking shall be provided in
accordance with details to be agreed with the Local Planning Authority. Such
cycle parking shall be retained and maintained thereafter. Reason: to ensure adequate
safe provision o facilities for cyclist and to comply with Policy TR6
(Cycling and Walking) of the Isle of Wight Unitary Development Plan. |
3 |
In the event of the
retail units being unoccupied upon completion temporary shop fronts should be
erected for a period of 12 months in accordance with details to be submitted
to and agreed with the Local Planning Authority. In the event of the retail
units continuing to be unoccupied after 12 months permanent shop front shall
be erected in accordance with details to be agreed with the Local Planning
Authority. Reason: In the interest of the visual amenities of
the area and in compliance with Policy D1 (Standards of Design) of the Isle
of Wight Unitary Development Plan. |
4 |
The flat roofed
area of the northern end of the block at third floor level shall not be used
as a terrace or balcony and any access to this area shall be for emergency or
maintenance purposes only. No permanent access shall be formed to this flat
roofed area. Reason: To avoid any overlooking of the neighbouring
properties and in compliance Policy D1 (Standards of Design) of the Isle of
Wight Unitary Development Plan. |
5 |
Prior to
commencement of work details shall be submitted of the treatment of the
existing northern boundary wall of the site. Such treatment shall ensure the
retention of the wall along with its repair and development shall be carried
out in accordance with the agreed details. Reason: In the interest of
the amenities of the adjoining properties and in compliance of D1 (Standards
of Design) of the Isle of Wight Unitary development Plan. |
6 |
Prior to occupation
of the dwellings hereby approved agreed hard landscaping proposal should be
carried out in respect of pedestrian accesses. Such hard landscaping proposal
shall include any boundary treatment in respect of the western and eastern
boundaries. Development shall thereafter be carried out in accordance with
those agreed details. Reason: In the interests of the future occupiers of
the building in compliance of Policy D1 (Standards of Design) of the Isle of
Wight Unitary Development Plan. |
7 |
Prior to
commencement of work a full methodology statement shall be submitted in
respect of proposed site management which shall include timings of delivery
of construction materials. All construction traffic relating to the
development hereby approved shall be directed to leave the site by means of
prominent signage details of which shall be submitted to and approved in
writing by the Local Planning Authority. Such signage shall be erected at the
junction between the sites and South Street and Pyle Street. Signage shall be
retained in a clean and legible condition for the duration of the development
and any sign that is damaged beyond repair or removed shall be immediately
replaced. Reason: In the interest of highway safety and to
comply with Policy TR7 (Highway Considerations) of the Isle of Wight Unitary
Development. |
8 |
Steps including the
installation and use of wheel cleaning facilities in accordance with details
to be submitted to and approved in writing by the Local Planning Authority
shall be taken to prevent materials from being deposited on the highway as a
result of any operation on the site. Any deposit of materials from the site on
the highway shall be removed as soon as it is practical by the site operator. Reason: In the interests of highway safety and to
prevent mud and dust from getting on the highway and to comply with Policy
TR7 (Highway Considerations) of the Isle of Wight Unitary Development Plan. |
9 |
No development
shall take place until samples of materials/details of the materials and
finishes, including mortar colour to be used in the construction of the
external surfaces of the development hereby permitted have been submitted to
and approved in writing by the Local Planning Authority. Development shall be carried out in
accordance with the approved details. Reason: In
the interests of the amenities of the area and to comply with policy D1
(Standards of Design) of the Isle of Wight Unitary Development Plan. |
10 |
No development
shall take place until a detailed scheme including calculations for capacity
studies have submitted to and agreed with the Local Planning Authority
indicating the means of foul water and surface water disposal. Any such
agreed scheme shall include for a foul water disposal system indicating
connection points on the system where adequate capacity exists to ensure any
additional flow should not cause flooding or overload the existing system.
Any surface water system should be discharged into the nearby water course in
accordance with a scheme to be agreed with the Local Planning Authority. Reason: To ensure an adequate foul and surface water
drainage is provided for the development and in compliance with Policy U11
(Infrastructure and Services Provision) of the Isle of Wight Unitary
Development Plan. |
11 |
No part of the
development hereby permitted shall commence until there has been submitted to
and approved in writing by the Local Planning Authority: a) A desk-top study documenting all previous
and existing land uses of the site and adjacent land in accordance with
national guidance as set out in Contaminated Land Research Report Nos. 2
& 3 and BS10175: 2001; and, unless
otherwise agreed in writing by the Local Planning Authority, b) a site investigation report documenting the
ground conditions of the site and incorporating chemical and gas analysis
identified as appropriate by the desk-top study in accordance with BS10175:
2001 – “Investigation of Potentially Contaminated Sites – Code of Practice”; and, unless
otherwise agreed in writing by the Local Planning Authority, c) a remediation scheme to deal with any
contaminant including an implementation timetable, monitoring proposals and a
remediation verification methodology. The verification methodology shall
include a sampling and analysis programme to confirm the adequacy of
decontamination and an appropriately qualified person shall oversee the
implementation of all remediation. The construction of
buildings shall not commence until the investigator has provided a report,
which shall include confirmation that all remediation measures have been
carried out fully in accordance with the scheme. The report shall also
include results of the verification programme of post-remediation sampling
and monitoring in order to demonstrate that the required remediation has been
fully met. Future monitoring proposals and reporting shall also be detailed
in the report. Reason: To protect the
environment and prevent harm to human health by ensuring that where
necessary, the land is remediated to an appropriate standard in order to
comply with Part IIA of the Environmental Protection Act 1990. |
12 |
The development
hereby permitted shall not be brought into use until the windows, doors, bay
window surrounds, moulding, string courses, piers, quoins, brick dressings
and soldier courses have been constructed in accordance with the details
shown on Drawing No.s 02270L (20) 2146 and 02270L (20) 2147. There should be
no amendment to these details without the prior written consent of the Local
Planning Authority. Reason: In
the interests of the amenities of the area and to comply with policy D1
(Standards of Design) of the Isle of Wight Unitary Development Plan. |
13 |
Notwithstanding the
provisions of the Town and Country Planning (General Permitted Development)
Order 1995 (or any revoking or re-enacting that Order with or without
modification) no window shall be constructed in the north facing elevations
of the block hereby approved without the prior written consent of the Local
Planning Authority. Reason: In the interests of
the amenities of the adjoining property owners in compliance with Policy D1
(Standards of Design) of the Isle of Wight Unitary Development Plan. |
14 |
Notwithstanding the
provisions of the Town and Country Planning (General Permitted Development)
Order 1995 (or any Order revoking and re-enacting that Order with or without
modification) there shall be no north facing side window inserted within the
first and second floor west facing bedroom bay windows without the prior
written consent of the Local Planning Authority. Reason: In the interests of
the amenities of adjoining properties in compliance with Policy D1 (Standards
of Design) of the Isle of Wight Unitary Development Plan. |